STATUS OF IRRIGATION PROJECTS AS ON 30-11-2017

PROFORMA - V
Sl. PKG.
Mobilsat-ion Original Area of Land Area of
Contract IBM value Contract Revised Compl-
Advance Agreement Date Start of Compl- already land to be
Name of the Project Name of the Agency Agt.No. value (Rs.in (Rs.In.
Recovered Date Contract
period
etion
etion
acquired acquired
Crs.) Crs) month date
(Rs.in.Crs.) Date (Acs) (Acs)
No. No.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 9 Easening side slopes to 1.5:1 and providing cement concrete M/s KCL-JCCG(JV) 22SE/ 176.104 182.02 17.50 21-3-2005 21-3-2005 24 20-3-2007 31-03-2018 1005.51 26.19
lining with paver to Somasila Kandaleru Flood Flow Canal Hyderabad
between Km.5.850 to Km.45.125, Easening side slopes to
2:1 and improvements to approach channel leading to Head
Regulator and construction of K.R.Left Canal and Branch
Canal No.1 together with distributory system creating an
Irrigation potential of 22,400 acres including investigation,
design and estimation.
2004-2005

2 12 Construction of 3 O.T.Regulator on S.K.F.F.Canal at M/s Ratna 13-SE/ 24.363 27.072 -- 06-01-2009 06-01-2009 24 5-1-2011 30-06-2018 403.60 1085.95
Km.26.900, Km.32.600/30.600, Km.40.650 and 4Nos. of Infrasturctures
balancing Reservoirs by suitably improving the existing Projects Pvt.Ltd.,
Minor Irrigation tanks at Thopugunta, Kandapuram and by Hyderabad
constructing new Reservoirs at Kesamanenipalli and
Chowtapalli for Irrigating 13,800 Acres of I.D.Ayacut and
stabilization of 500Acres of wet ayacut under 5 M.I.Tanks
namely Thopugunta, Kandapuram, Verubotlapalli, Chittaluru
and Vavileru. 2008-09

3 33 Construction of Barrage cum Bridge across Penna River near M/s Harvins 28SE/ 122.50 145.92 7.4657 09-07-2008 09-07-2008 30 08-01-2011 6/30/2018 73.94 15.56
Sangam (V), Sangam (M) of S.P.S.R.Nellore District – Construction
Investigation, Designs, Drawings, Estimates, Manufacturing Pvt.Ltd.,-JSR(JV),
of gates and erecting the same along with Hoist Bridge Hyderabad 2008-
arrangements electrically operated, commissioning of the 09
same and maintenance of the Barrage for two years.

4 Non- providing Lift Irrigation to K.R.Reservior Left Canal at 260C/s M/s Mega 45SE/ 53.1453 60.957 -- 28-11-2015 28-11-2015 32 27-07-2018 --- --- ---
Pack to feed on ID Ayacut of 20,700Acres from Low level sluice at Engineering & Crs
age Km.7.550 to the off take point of High Level Canal at Infrastructure Ltd., 2015-16
Km.0.990 of K.R.Dam in SPSR.Nellore District. Dt:

5 Construction of O.T.Regulator at Km.,9.,800 on SKFF.Canal M/s Sri Balaji 47SE/ 5.78 6.876 -- 16-12-2015 16-12-2015 18 15-06-2017 --- 41.44 11.43
and formation of new Tank for Irrigating 1060Acres of ID Construction Firm 28-11-
2015-16
Ayacut including construction of Distributaries system in No.112 of 1998 2015 (+)
Kullur, Madannagaripalli, Chintalapalem (V) of Kaluvoya D.No.1- 4.589%
mandal SPSR.Nellore District. 1038, Bunglathota, Dt:16-12-
Nawabpet, 2015
Nellore-2 (-)9.9%

Sd/-K.V.Ramana
Executive Engineer
S.S.L.C & S.B.Division No.3
//t.c.f.b.o// Kothur-Nellore-4.

Technical Officer
STATUS OF WORKS IN PROJECT TO THE END OF 11/2017
PROFORMA-VI

Pending bills upto 10/2017


CANAL in Km. Structures Nos. Acquisition Acres Forest Land Distributory

Funds requirement up to
Railway Crossings
N.H.Crossings

Total Ayacut
Balance to be done

Balance to be done
Sl.

11/2017
Rs.inCr.
Work Done Balance

Total length
Pkg.N Agt.Value %

Completed

Completed

Completed
Name of the Agency Work

Acquired

Acquired
Progress

Progress

Balance
Balnce

Balnce
o. (In.Cr.) Progress

Total

Nos.
(In.Cr.) (In.Cr.)
No.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
1 9 M/s KCL-JCCG(JV) 176.104 163.6446 12.4594 92.92% 44.27 44.27 -- 1138 1089 -- 49 -- -- 22400 1005.51 26.19 31.64 -- 22 18 4 -- 1.4677 5.00
Hyderabad Ha

2 12 M/s Ratna 24.363 10.5700 13.79300 43.39% 59.975 8.775 51.20 265 45 16 204 -- -- 13800 404.41 1085.14 -- -- 8 -- -- 8 3.9620 5.00
Const.Hyderabad

3 33 M/s Harvins Const.JSR. 122.500 75.3850 47.1150 61.54% -- -- -- 8 -- 3 5 -- -- -- 73.94 15.56 -- -- -- -- -- -- .. 10.00

Co.(JV),
Hyderabad
NOTE:- The expenditure figures were scrutinized from the inception of work and corrected.

PACKAGE NO.33:- Total work done value 75.3850


Price escalation 13.8859 Sd/-K.V.Ramana
VAT 1.5343 Executive Engineer
Bank Guarantee 0.5779 S.S.L.C & S.B.Division No.3
Seignorage Charges 0.6355 Kothur-Nellore-4
92.0186

PACKAGE NO.12:- Total work done value 10.57000


Price adjustment 1.18183
VAT 0.16581
11.91764

PACKAGE NO.9:- Total work done value 163.6446 //t.c.f.b.o//


Price adjustment 7.8323
VAT 0.9686

Bank Guarantee 0.9934 Technical Officer


0.3475
Insurance 173.7864
PROJECT WISE/PACKAGE WISE BILLS PENDING FOR THE MONTH OF 11/2017
PROFORMA - VII
(Rs.in.Crores)
Sl.
Agt.Value Bills pending (Rs.in.Crores)
PKG.N (Rs.in.
Name of the Project Up to Total upto
o. During
Crores) 10/2017 11/2017 11/2017
No
1 2 3 4 5 6 7
1 Easening side slopes to 1.5:1 and providing cement concrete lining with paver to 9 176.104 1.4690 0.000 1.4690
Somasila Kandaleru Flood Flow Canal between Km.5.850 to Km.45.125, Easening side
slopes to 2:1 and improvements to approach channel leading to Head Regulator and
construction of K.R.Left Canal and Branch Canal No.1 together with distributory system
creating an Irrigation potential of 22,400 acres including investigation, design and
estimation.

2 Construction of 3 O.T.Regulator on S.K.F.F.Canal at Km.26.900, Km.32.600/30.600, 12 24.363 1.9809 1.9810 3.9619


Km.40.650 and 4Nos. of balancing Reservoirs by suitably improving the existing Minor
Irrigation tanks at Thopugunta, Kandapuram and by constructing new Reservoirs at
Kesamanenipalli and Chowtapalli for Irrigating 13,800 Acres of I.D.Ayacut and
stabilization of 500Acres of wet ayacut under 5 M.I.Tanks namely Thopugunta,
Kandapuram, Verubotlapalli, Chittaluru and Vavileru.

3 Construction of Barrage cum Bridge across Penna River near Sangam (V), Sangam (M) 33 122.50 8.9814 Nil Nil
of S.P.S.R.Nellore District – Investigation, Designs, Drawings, Estimates, Manufacturing
of gates and erecting the same along with Hoist Bridge arrangements electrically
operated, commissioning of the same and maintenance of the Barrage for two years.

Sd/-K.V.Ramana
Executive Engineer
S.S.L.C & S.B.Division No.3
Kothur-Nellore-4.
//t.c.f.b.o//

Technical Officer
PACKAGE WISE BOTTLENECKS FOR THE MONTH OF 11/2017
Sl. PROFORMA - VIII
Package Agreement Value
Bottlenecks
No. (Rs.in.Crores)
1
No. 2 3 4
1 9 176.104 Slow progress due to land Acquisition issue.

2 12 24.363 Land acquisition issues. An extent of 1085 Acers land has to be acquired

3 33 122.500 1) Heavy dewatering on account of ponding on U/s of the barrage under construction due to release of
water to crop from Sangam Anicut.

2) Approval of drawings awaited from Chief Engineer, Central Design Organization, Vijayawada.

Sd/-K.V.Ramana,
Executive Engineer,
S.S.L.C & S.B.Division No.3
Kothur-Nellore-4.
//t.c.f.b.o//

Technical Officer