SALINE WATER CONVERSION CORPORATION

STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I

REVISION SHEET
DOC. TITLE: STEEL TANK FARM TAIF P&I DIAGRAM

FROM REV: A TO REV: B

DOC. NO: 7 6 - Q P 2 0 - D - 0 0 2
REV. DATE: 13.05.2018

CHANGES TO THE DOCUMENT: Acc. to Engineer’s Comment Sheet EH-AH-D-0102 (10.04.2018)

ENGINEER’S NOTE NO CONTRACTOR’S ACTION


1. In order to review such submittal Diameters and materials are as per below
tender documents
regarding P&IDs, site layout and pipe
 M06 Valves for Water Projects-Rev8
schedule (indicating diameters and
 QC10-H-048 M08 Piping Materials for
materials) should be approved firstly. Stations-Rev4
 Tie-In Station Existing / New Taif
Strategic Reservoir - P&I Diagram
 New Taif Strategic Reservoir - P&I
Diagram
Size of piping and site layout piping
arrangement is verified within hydraulic study.

2. All equipment’s (valves & instruments)


typical signal, interlocks and function Noted and revised accordingly.
requirement should be added.
3. For Ultrasonic level meter, installation Noted and revised for existing
should not be through ball valve as
indicated in the P&ID. Strategic reservoir level transmitters.

4. Max. Water level in tank 19.600m, Min. Max. and Min. Water level in tank is as per
water level 0.300m, Overflow level approved Tank Sizing Calculation Report for
19.91m, shell height 20.26m. Tanks at Taif Storage Tanks at Taif (76-QP40-J-
004, Rev D).
The Referred Overflow level 19.91m, shell height
20.26m is not tank level (from top of the bottom
plate) this is from finish ground level (FGL)

5. Automatic Vent Valve at outlet ID# Automatic Vent shall be provided at highest
76XP17S should be on the 60" main pipe potion of the piping. Since all the 60 “header
similar at inlet. will be underground, then air vent will be
positioned at the lowest side of the branch
above ground piping. Final location, numbers
and size will be as per hydraulic calculation
report. Refer Notes#4.
Tank drain valves size is as per QP20-
6. Tank drain valves size should be based D-5485 Typical Steel Tank 170000m³-
on design calculations. Tank Drain to be TaifStrategicReservoir-P&IDiagram-
connected to storm water system piping. Rev1(Tender drawing). Tank Drain will
be connected to station drain
network.
7. Valves 76XP17S704 and 76XP17S705, The Referred 200mm nozzles are inlet tap for
200mm dia. at inlet purpose to be mobile drain pumps outlet. Refer Notes#3.
described.
8. Vent at Dome Roof, Automatic vents Tank venting and automatic vent shall be as per
design / dimensions to be based on tank design calculation report. Refer notes#8
calculations.

Thermal Relief Valves have been added in the


9. Thermal Relief valves are not shown.
Shafts before the Tank Farm.
10. Piping Class shall be mentioned Class A, All Flanges and valve class rating in the tank
Class B, (PN 16 --> 16 bars; Class 150# is will be as per ASME Class#150.
19.3 bars).
For piping the design pressure will be as per
hydraulic calculation repot. No class for piping
is mentioned in ASME B36.10. Only schedules
are applicable such as sch 40, XS.STD etc.

11. Low level switch signal position to be Noted. The correct position of the switches is
shown correctly (in layout near high level described in the Typical Steel Tank
switch), for example (76XP15L301). Instrumentation Overview for Taif “76-QP10-S-
002”.

12. For water storage tanks ultrasonic/radar


type level transmitters installed at the
As discussed at last Design review meeting in
tank top shall be used, while it is not show
Cairo dated 06-04-2018, it is proposed to use
in the drawing. Connection nozzles shall
DPT hydrostatic level transmitter (refer to
be provided by the tank manufacturer.
drawing “76-QP10-S-002”.
Refer to (S02 5.4.1).
13. For note 2: minimum level to be 1727.6 Noted and revised accordingly.
masl as per tender.
14. For note 6: station level to be 1727 masl Vent will be installed in the high points and drain
as per tender. Vent & drain valves for will be installed in low points as per piping layout.
header pipes to be added. Refer notes#
OTHER CHANGES (REASONS FOR CHANGES):

none

Submitted:

DATE

Distributed: