Sie sind auf Seite 1von 19

About this template: This template helps projects to create and present a Monitoring & Evaluation (M&E) framework.

Instructions: PATH recommends that an M&E expert facilitate discussions with the project team to generate the informati
the team to enter the information into the template.

Project Information

Project Name: [Type Complete Project Name Here] Location:


Funder: [Type Name of Funder for the Project Here] Person Responsible:
Start Date: 1/1/2014 Contributors:
End Date: 1/1/2015 Last updated On:
Shared with
Funder? N

Notes

[Type Notes Here]

Goal
x Type "x" if goal will be measured; delete if

The goal is the conceptual aim of the project. What is it [Type Goal Here]
you are trying to achieve with your project? What kind
of changes will you see if you are successful?

Objectives Outcomes
What are the desired accomplishments that What are the results to be obtained under eac
contribute to the overall goal? objective? What changes are expected as a res
activities and outputs?

Check box if outcome will be tracked and reported.


x 1. x 1.1
[Type Objective Here] [Type Outcome Here]

x 1.2
[Type Outcome Here]

x 1.3
[Type Outcome Here]

x 2. x 2.1
[Type Objective Here] [Type Outcome Here]

x 2.2
[Type Outcome Here]

x 2.3
[Type Outcome Here]

x 3. x 3.1
[Type Objective Here] [Type Outcome Here]

x 3.2
[Type Outcome Here]

x 3.3
[Type Outcome Here]

x
on (M&E) framework.

to generate the information needed to complete this template and assign a member of

rmation

[Type Project's Location(s) Here]


[Type Name of Person Maintaining Template Here]
[Type Name of Contributor(s) of Template Here]
[Type MM/DD/YYYY Template Last Updated Here]

l be measured; delete if goal will not be measured

Outputs
be obtained under each What are the deliverables to be produced in order to What internal and exte
es are expected as a result of meet the objectives? the attainment of these

racked and reported. Check box if output will be tracked and reported.
x 1.1.1
[Type all assumptions for
[Type Output Here]

x 1.1.2
[Type Output Here]

x 1.1.3
[Type Output Here]

x 1.2.1
[Type Output Here]

x 1.2.2
[Type Output Here]

x 1.2.3
[Type Output Here]

x 1.3.1
[Type Output Here]

x 1.3.2
[Type Output Here]

x 1.3.3
[Type Output Here]

x 2.1.1
[Type All Assumptions fo
[Type Output Here]

x 2.1.2
[Type Output Here]

x 2.1.3
[Type Output Here]

x 2.2.1
[Type Output Here]

x 2.2.2
[Type Output Here]

x 2.2.3
[Type Output Here]

x 2.3.1
[Type Output Here]

x 2.3.2
[Type Output Here]

x 2.3.3
[Type Output Here]

x 3.1.1
[Type all assumptions for
[Type all assumptions for
[Type Output Here]

x 3.1.2
[Type Output Here]

x 3.1.3
[Type Output Here]

x 3.2.1
[Type Output Here]

x 3.2.2
[Type Output Here]

x 3.2.3
[Type Output Here]

x 3.3.1
[Type Output Here]

x 3.3.2
[Type Output Here]

x 3.3.3
[Type Output Here]
Assumptions
What internal and external factors will enable or prevent
the attainment of these outcomes and objectives?
[Type all assumptions for the objective here]
[Type All Assumptions for the Objective Here]
[Type all assumptions for the objective here]
1

Das könnte Ihnen auch gefallen