: BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
CONTENTS :
1. PURPOSE
2. SCOPE
4. WORK ORGANIZATION
1. PURPOSE
The purpose of this procedure is to ensure that weld and radiograph numbering
/ marking is carried out and in accordance with recognized practices, code and
standard.
2. SCOPE
This procedure describes a weld numbering system Water Disposal Line, NGL
Pipeline, Butane Gas Line, Butane Crude Line Construction for Betara
Complex Development Project that will provide each weld with a unique
traceable weld number.
4. WORK ORGANIZATION
5.1. Manpower :
- Foreman Welding
- Pipeline Supervisor
- QC inspector
- QC Coordinator
- NDT Personnel
5.2. Consumables :
- Solid Marker
- Writing Pad
- Book
- Pen
BETARA COMPLEX DEVELOPMENT PROJECT Job No. : BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
The numbering system will be applied by marking the figures and symbols
more particularly the section number, weld or joint number, and the welders
code or symbol as presented in this specification on the pipe surface near the
involved weld joint. The unit no. and or the unit name itself will be indicated in
the heading of the Daily Weld Status and Weld Joint Inspection And
Traceability Report.
f. Butane Propane Crude line 10” is unit 6, approximately 28.800 km, divided
into 29 section and section 1 is from KP 0.00 to KP 1.00 and section 2 is
from KP 1.00 – 2.00 , etc the weld number will be prefixed SN1W01 or
(S1W01) up to SN1W83 or (S1W83). While the last section will the weld
numbering will be SN29W01 or S29W01 to SN29W67 or S29W67 depend
on actual number of joint
- Project Name
- Date of Test
Unit Pipeline Length Section No. Approx. Total. The Weld Remarks.
No (Km) Weld No.
The weld number will be made in text letters and numbers and will be recorded
on the weld radiograph and logged in the Weld Status Report
BETARA COMPLEX DEVELOPMENT PROJECT Job No. : BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
Production welds will have sequential numbering and will be controlled by the
welding Supervisor.
Weld number will be prefixed by the section number followed by the actual
production weld number.
Tie-in welds will be numbered to follow the previous production weld number
and will be identified by the suffix T. Therefore T1 would be used for a single
weld overlap tie-in and T2 for a two weld pup tie-in etc.
In the situation where a short segment of the section is left for the tie-in crew to
complete, each weld will be identified by the suffix T and will be numbered T1,
T2 , T3 , T4 , etc., representing the no. welds for the skip segment.
Road Crossing: For road crossing the joints will be numbered showing the
section and the joint number in ascending order. For example; S1W1RDX
T1,T2,T3,T4 are weld joints in the road crossing after joint no.1 in section 1.
BETARA COMPLEX DEVELOPMENT PROJECT Job No. : BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
River Crossing: For river crossing the joints will be numbered as in the way
joints are numbered for road crossing. For example; S8W28RVX T1, T2, T3 are
weld joints in a river crossing immediately after joint no.28 in section 8.
Repair welds will be identified by the original weld number with the suffix R,
then the repair number.
The first repair on production weld SN1W25 or (S1W25) would be SN1 W25R1
or (S1W25R1). The second repair on the weld would be SN1W2R2 or
(S1W25R2) etc.
When a repair is completed on a tie-in weld, the weld would be logged
SN1W25T1R1 or (S1W25T1R1)
6. 6 Cut-Outs
New weld that result from cut outs shall be identified by the original weld
number and suffixed C/O after the number. The first cut out weld would be C/O
1, the second C/O 2, etc…
If production weld SNIW25 or (S1W25) is cut out and replace by new weld, the
new weld identification number would be logged as SN1W25 C/O or S1W25
C/O.
QC Inspector should inspect the weld visually before marking the joint number
on the pipe.
External weld number and welder code or symbol will be marked on the pipe
coating with contrasting indelible paint. The number will be located on the work
side of the pipe at distance of a least one meter upstream of the weld. This
position will ensure that the joint coating material does not cover the number.
QC Inspector will ensure that the joint number applied on the pipe is correct
and placed or marked on the appropriate position.
For radiography of the welds, identification of the joint will be by lead letters
and numbers, which will be shown on the radiograph during the interpretation
of the radiographs for the weld.
All pipe line field weld joints will be logged in the Weld Status Report and will
be transferred to the As-Built Traceability Schedule/Report .
BETARA COMPLEX DEVELOPMENT PROJECT Job No. : BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
ATTACHMENT
A
BETARA COMPLEX DEVELOPMENT PROJECT Job No. : BCD-090-CA
PT. Sutindo Project Ind
PIPELINE WELD JOINT AND RADIOGRAPH
ISSUED Date : 05/12/03 FILM NUMBERING SYSTEM Page : 4 of 8
ATTACHMENT
B