Sie sind auf Seite 1von 4

1.

Measure distance at the google maps to


estimate the elevation at the top and bottom
2. Top elevation of the line = 83.51 m
Bottom Elevation of the line = 18.89 m
Exsisiting slope from Google Map
= 38.7 % or 20.84 °
1. Measuring distance from the
CAD file which is already have the
contour map.
2. Length of the line about 181,6
m , same as on the goole map.

3. From the contour map , top


elevation level is
83,51 m, and lowest elevation level
is 18.89 m

4. From the calculation ,


slope value = 38.07 %
Based on the calculation, to
make slope about 25.0 % we
need to cut the area along the
access road its about 22.12 m
depth.

If we try to design the access


road with width = 5 m

Volume cutting soil at the area


its about 1,816 m²

So, total volume cutting soil


=1 ,876 x 5 m
=
9,380 m³
Slope = 25.0 %
Cutting soil Volume =9,380 m³
Slope design = 25.0 %
Slope degrees = 14.06 °

*the volume above is only for access road with


length = 181 6 m from the south bottom side

Das könnte Ihnen auch gefallen