Beruflich Dokumente
Kultur Dokumente
1-27 International Load line certificate Date last certified? MED 21st June 2017
1-28 International Sewage Pollution Certificate Date STP was certified MED 19th June2017
Does rig have PVT TP
systems in pits . Please
1-29 Rig Watch System HIGH
state type of system(
digital / float)
Does rig have flow show TP
1-30 Flow show system system in flowline. Date HIGH
last calibrated?
Does rig has PVT system TP
1-31 Trip Tank PVT system in trip tank ( digital / HIGH
float).
Does rig have certified Doctor
1-32 Doctor / medic doctor / medic on rig. ( MED
level of education)
Does rig have safety Yes
1-33 Safety Officer on Rig MED
officer on rig?
CO2 fire extinguishing bottles Date last certified? 26 Oct 2016
1-34 MED
( Hydro test valid for 10 yrs) Sep 2021
2.0 SAFETY :
Does rig have safety Yes
induction video on rig for
2.1 Rig safety Induction LOW
people arriving / departing
rig?
“T” card system used to Yes
2.2 Muster Stations LOW
identify people
Does rig have established Yes-SOC
2.3 Observation program safety observation program MED
on rig?
Does rig utilizes Yes
established JSA( Job
2.4 Pre-Job planning LOW
Safety Analysis program
for jobs?
Does rig conduct routine Yes
safety meetings LOW
2.5 Safety Meetings
8-1
High Voltage signs posted MED YES
MED YES
8-14 Signal lights Does rig have fog horns?
9.0 LIFTING
Crane manuals and Date Cranes last load tested LT-Jan 2013
9-1 HIGH
certificates and MPI inspected? MPI-Jan 2017
Cranes & lifting appliances
general
Overall condition of cranes,
Pallet lifter
cab, leaks, fall from heights
protection, date wire rope
9-2 HIGH Good
replaced.
Drawworks in good
Brake bands and linkage MPI
11.2.12 working condition – no oil HIGH
conducted on ?
leaks
Valves on standpipe
manifold are numbered
11.3.5 HIGH
with color coded drawing
in the dog house
lighting under rotary
11.3.6 Rotary and cantilever areas lighting under the HIGH
cantilever
Pressure gauge on choke
Does choke manifold have a
manifold with no threaded
drill pipe and annulus gauge
11.3.7 connections on choke HIGH
installed if hand choke
manifold correct W.P.
required?
range & in good condition.
12.0 VESSELS:
Overall condition of fixed
Fixed air lines in good
12.1 lines on rig? HIGH Good and color coded.
condition and color coded
Are lines color coded?
Air hose connections with Does contractor utilize safety
12.2 correct psi rated safety pin wires for crows foot color MED Yes
and safety line installed coded?
Pressurized vessels are in
good condition SWP is stamped on vessels
No welding on vessels