Sie sind auf Seite 1von 1

Dualization and Improvement of Pindi Gheb – Jand –

CONSULTANTS Kohat Road (Up gradation /Dualization of Motorway


NES PAK Link from Kohat via Jand), Package-1: Pindi Gheb to
Khushal Garh (34.56 KM).
CONTRACTORS
ACEG JV NCC
(Pvt) Ltd.

Chainage ___________________________ Request No. ________________

Description __________________________ Date of Testing______________

(A) GENERAL
1 F.D.T. Test No.
2 Chainage
3 Test Location
4 Depth of Hole
5 Layer No.

(B) MOISTURE CONTENT


1 Can No. gm
2 Wt. of Can gm
3 Wt. of Can + Wet Soil gm
4 Wt. of Can + Dry Soil gm
5 Wt. of Water gm
6 Wt. of Dry Soil gm
7 Water Content %
8 Speedy Moisture %
( C) FIELD DENSITY
1 Wt. of Excavated from Hole gm
2 Wt. of Sand Used + Cone gm
3 Wt. of Residential Sand + Cone gm
4 Wt. of Sand in Hole + Cone gm
5 Wt. of Sand to Fill Cone gm
6 Wt. of Sand to Fill Hole gm
7 Unit Wt. of Sand gm/cc
8 Gross Vol of Hole cc
9 Wet Unit Wt. of Soil gm/cc
10 Dry Unit Wt. of Soil gm/cc
11 Max. Dry Density gm/cc
12 Opt. M.C. %
13 Compaction Obtained %
14 Required Compaction %

Remarks:________________________________________________________________________________________________

CONTRACTOR CONSULTANT
Lab. Tech. Lab. Tech Material Engineer