location/room 计划开工时 计划完成时 g time

项目名
name 施工项目Construction item 间Starting 间Completion limitati
称Name on
time time
水泵间设备安装 installation of 1/Jan/14 15/Jan/14 15
pump house equipment
室内管道安装inside piping 7/Jan/14 20/Jan/14 14
fitting

水系统 水管阀门安装 piping valve 10/Jan/14 20/Jan/14 11


water instalation
system 管道水压pipe test 10/Dec/13 13/Dec/13 4

管道阀门保温thermal insulation 19/Dec/13 1/Jan/14 14


of piping valves

保温防护壳insulation 1/Jan/14 15/Jan/14 15


protective shell
屋面 equipment rubber bed fixing 15/Dec/13 16/Dec/13 2
flo
or 风管安装air duct instalation 18/Nov/13 10/Dec/13 23

风阀\消声器安装air valve/noise 1/Jan/14 4/Jan/14 4


deadener instalation

风系统 风管试验 air duct test 4/Jan/14 5/Jan/14 2


air 轴流通风机风机安装axial flow 1/Dec/13 10/Dec/13 10
syetem fan installation
轴流风机电缆及线管敷设flow fan 1/Dec/13 5/Dec/13 5
cable laying
风管保温 thermal insulation of 6/Jan/14 8/Jan/14 3
air duct

保温防护壳thermal insulation 10/Jan/14 20/Jan/14 11


protective shell

风管密封性试验、验收
leakproofness test and 1/Dec/13 7/Dec/13 7
inspection acceptance of air
duct

风阀安装air valve installation 10/Jan/14 17/Jan/14 8

电子室 风管保温thermal insulation of


control 18/Jan/14 25/Jan/14 8
air duct
equipme
nt room 送、回风口安装air supply and
13/Jan/14 20/Jan/14 8
reture air inlet installation

轴流风机电缆及线管敷设flow fan 3/Dec/13 10/Dec/13 8


cable laying
轴流风机安装axial flow fan 1/Dec/13 10/Dec/13 10
installation
风管密封缺陷处理handling of 1/Dec/13 10/Dec/13 10
seal defect of air duct
风管试验、验收 test and
inspection acceptance of air 26/Nov/13 30/Nov/13 5
duct

集控室
central
control
风阀安装air valve installation 6/Jan/14 10/Jan/14 5
集控室 风管保温thermal insulation of
central 1/Dec/13 14/Jan/14 45
air duct
control
room
风口安装air inlet installation 6/Jan/14 10/Jan/14 5

轴流风机电缆及线管敷设flow fan 1/Dec/13 10/Dec/13 10


cable laying
轴流风机安装axial flow fan 1/Dec/13 10/Dec/13 10
installation

风机盘管安装fan coil 4
值班室 installation
15/Jan/13 18/Jan/13
工程师
室 办公 轴流风机电缆及线管敷设flow fan 15/Dec/13 11
25/Dec/13
室 厕所 cable laying
enginee 通风器安装ventilator
r 19/Nov/13 23/Nov/13 5
installation
room 、
duty 通风器电缆及线管敷设ventilator 1/Dec/13 10/Dec/13 10
shift cable laying
room、o 风管保温thermal insulation of 25/Jan/14 10/Feb/14 17
ffice air duct
room
…… 风口安装air inlet installation 25/Jan/14 30/Jan/14 6

风管试验、验收test and
inspection acceptance of air 26/Dec/13 30/Dec/13 5
会议室 duct
、通讯
室 风管保温、安装installation of 25/Jan/14 10/Feb/14 17
meeting air duct heat insulation
room 、
telecom
6
municat 风阀安装air valve installation 25/Jan/14 30/Jan/14
ion
room 送、回风口安装air supply and 25/Jan/14 30/Jan/14 6
reture air inlet installation
管道安装piping fitting 15/Nov/13 30/Nov/13 16
管道水压pipe test 10/Dec/13 13/Dec/13 4
水系统
water 8
system 阀门安装valve installation 15/Jan/14 22/Jan/14

管道保温pipe insulation 25/Dec/13 5/Jan/14 12


剩余风管安装installation of 25/Dec/13 31/Dec/13 7
rest air duct
风管试验、验收test and
inspection acceptance of air 21/Nov/13 25/Nov/13 5
duct
蓄电池 风管保温air duct insulation 25/Nov/13 30/Nov/13 6

battery 轴流风机安装axial flow fan 11/Dec/13 14/Dec/13 4
installation
room
轴流风机电缆及线管敷设flow fan 11/Dec/13 14/Dec/13 4
cable laying

battery
room

送、回风口安装air supply and 31/Jan/14 4/Feb/14 5


reture air inlet installation
电气设 剩余风管制作fabrication of 15
1/Dec/13 15/Dec/13
备 rest air duct
间、9.8 剩余风管安装installation of
米空调 3/Dec/13 17/Dec/13 15
rest air duct
设备间
electiC 风管试验验收test and
inspection acceptance of air 17/Dec/13 20/Dec/13 4
al
duct
control
and 风管保温air duct insulation 1/Feb/14 10/Feb/14 10
meterin
gpanel 风阀安装 air valve 1/Feb/14 5/Feb/14 5
installation
room、A
C
equipme 风口安装air inlet installation 1/Feb/14 5/Feb/14 5
nt room
保安配 剩余风管安装installation of 1/Dec/13 10/Dec/13 10
rest air duct
6.3 电间、
m 空调设 风管试验验收test and
4
备间 inspection acceptance of air 11/Dec/13 14/Dec/13
essenti duct
al 风管保温air duct insulation 22/Dec/13 31/Dec/13 10
switch
gear 风阀安装air valve installation 1/Feb/14 5/Feb/14 5
room、A
C
equipme 风口安装air inlet installation 1/Feb/14 5/Feb/14 5
nt room

盘管和剩余风管安装installation 7/Feb/14 10/Feb/14 4


of coil pipe and rest air duct

风机盘管电缆及线管敷设fan coil 14/Dec/13 18/Dec/13 5


cable laying
风管试验验收test and
取样间 inspection acceptance of air 14/Dec/13 15/Dec/13 2
samplin duct
g room 风管保温air duct insulation 14/Dec/13 17/Dec/13 4

风阀安装air valve installation 7/Feb/14 10/Feb/14 4

风口安装air inlet installation 7/Feb/14 10/Feb/14 4

管道安装piping fitting 7/Feb/14 10/Feb/14 4


管道水压pipe test 10/Dec/13 13/Dec/13 4
水系统
water 6
system 阀门安装valve installation 20/Jan/14 25/Jan/14

管道保温pipe insulation 30/Dec/13 10/Jan/14 12

室外剩余风管安装installation 15/Dec/13 22/Dec/13 8


of outdoor rest air duct

风管试验验收test and
inspection acceptance of air 22/Dec/13 25/Dec/13 4
低压配 duct
电间 LV
switch
gear
room
低压配
电间 LV 风管保温air duct insulation 25/Dec/13 10/Jan/14 17
switch
gear 风阀安装air valve installation 15/Feb/14 20/Feb/14 6
room

风口安装air inlet installation 15/Feb/14 20/Feb/14 6

轴流风机安装及电缆敷设axial 20/Dec/13 30/Dec/13 11


flow fan installation
0m、 剩余风管安装installation of 15/Dec/13 22/Dec/13 8
rem rest air duct
ain 轴流风机安装及电缆敷设axial 20/Dec/13 30/Dec/13 11
ing flow fan installation
roo 风机盘管安装installation of
m 其余部 15/Feb/14 17/Feb/14 3
fan coil
位 风机盘管电缆及线管敷设fan coil 20/Dec/13 30/Dec/13 11
remaini cable laying
ng 风管保温air duct insulation 25/Dec/13 10/Jan/14 17
point
风阀安装air valve installation 15/Feb/14 20/Feb/14 6

风口安装air inlet installation 15/Feb/14 20/Feb/14 6

管道安装piping fitting 13/Nov/13 30/Nov/13 18


管道水压pipe test 10/Dec/13 13/Dec/13 4
水系统
water 11
system 阀门安装 valve installation 15/Jan/14 25/Jan/14

管道保温pipe insulation 30/Dec/13 10/Jan/14 12


base 风管安装air duct instalation 1/Dec/13 8/Dec/13 8
room
风管安装air duct instalation 10/Nov/13 30/Nov/13 21

风阀安装air valve installation 5/Dec/13 10/Dec/13 6

风管试验、验收test and
inspection acceptance of air 10/Dec/13 12/Dec/13 3
中压厂 duct
用配电
0m 装置室 送、回风口安装air supply and 5/Jan/14 10/Jan/14 6
MV reture air inlet installation
switchg
ear 风管保温、安装air duct 9
12/Dec/13 20/Dec/13
room insulation and installation

到屋面主风道安装、保温
insulation of main air duct to 1/Dec/13 8/Dec/13 8
room floor
轴流风机线管及电缆敷设axial 15/Dec/13 20/Dec/13 6
flow cable laying
轴流风机安装axial flow fan 5/Dec/13 10/Dec/13 6
installation
风管安装缺陷处理air duct 9/Dec/13 14/Dec/13 6
instalation
风阀安装air valve installation 14/Dec/13 18/Dec/13 5

风管试验、验收test and
inspection acceptance of air 18/Dec/13 20/Dec/13 3
duct
低压配
电间 LV 送、回风口安装air supply and 10/Jan/14 15/Jan/14 6
switch reture air inlet installation
中低压 gear
配电间 room 风管保温、安装air duct 6
20/Dec/13 25/Dec/13
LV insulation and installation
switch
gear 到屋面主风道安装保温insulation 14/Nov/13 22/Nov/13 9
room of main air duct to room

轴流风机安装axial flow fan 6/Dec/13 10/Dec/13 5


installation
6.3 轴流风机线管及电缆敷设axial 6/Dec/13 10/Dec/13 5
m flow cable laying

风阀安装air valve installation 20/Nov/13 25/Nov/13 6

风管试验、验收test and
inspection acceptance of air 25/Nov/13 30/Nov/13 6
duct

励磁设 送、回风口安装air supply and 4


15/Jan/14 18/Jan/14
备间 reture air inlet installation
excitat
ion 风管保温、安装air duct
cubicle insulation and installation 25/Dec/13 30/Dec/13 6
room
到屋面主风道安装保温
installation of main air duct 25/Dec/13 30/Dec/13 6
to room
轴流风机安装axial flow fan 6/Dec/13 10/Dec/13 5
installation
轴流风机线管及电缆敷设axial 6/Dec/13 10/Dec/13 5
flow cable laying
送回风主风道安装return air 25/Dec/13 10/Jan/14 17
main duct installation

风阀安装air valve installation 25/Dec/13 10/Jan/14 17


屋面 屋面
flo floor 风管保温air duct insulation 25/Dec/13 10/Jan/14 17
or 保温防护壳 insulation 11/Jan/14 20/Jan/14 10
protective shell
铜管安装+加氟copper pipe
installation and adding 5/Jan/14 11/Jan/14 7
fluorine
剩余风管制作fabrication of air 21/Nov/13 24/Nov/13 4
duct
风管法兰加工、安装fabrication
and installation of air duct 21/Nov/13 25/Nov/13 5
flange

风管试验、验收test and
inspection acceptance of air 27/Nov/13 29/Nov/13 3
网控继 duct
电室
relay 风阀安装air valve installation 1/Jan/13 5/Jan/13 5
room
风管保温、安装air duct 1/Dec/13 3/Dec/13 3
insulation and installation

送、回风口安装air supply and 1/Jan/13 5/Jan/13 5


reture air inlet installation

轴流风机安装axial flow fan 25/Dec/13 30/Dec/13 6


installation
风管试验、验收test and
inspection acceptance of air 15/Jan/14 18/Jan/14 4
duct

8
网控控 风阀安装air valve installation 5/Jan/14 12/Jan/14
制室
substat 送、回风口安装air supply and
ion 7/Jan/14 14/Jan/14 8
reture air inlet installation
control
room
风管保温、安装air duct 18/Jan/14 22/Jan/14 5
insulation and installation

轴流风机和电缆安装axial flow 30/Dec/13 4/Jan/14 6


fan installation
变更风管制作changed air duct 1/Dec/13 10/Dec/13 10
fabrication
变更风管安装changed air duct 1/Dec/13 10/Dec/13 10
installation
风管试验、验收test and
inspection acceptance of air 11/Dec/13 15/Dec/13 5
duct
网控MCC
室 MCC 送、回风口安装air supply and 7
14/Jan/14 20/Jan/14
room reture air inlet installation

风管保温、安装air duct 30/Dec/13 4/Jan/14 6


insulation and installation

轴流风机、空调设备安装
installation of axial flow fan 5/Jan/14 10/Jan/14 6
and AC equipment

unit installation 21/Jan/14 25/Jan/14 5

送、回风口安装air supply and 21/Jan/14 25/Jan/14 5


reture air inlet installation

蓄电池

battery
room
风管试验、验收test and
蓄电池 inspection acceptance of air 25/Dec/13 30/Dec/13 6
室 duct
battery
room 风管保温、安装air duct 20/Dec/13 30/Dec/13 11
insulation and installation

轴流风机、空调设备安装
installation of axial flow fan 21/Jan/14 25/Jan/14 5
and AC equipment

AC equipment and axial fan 1/Jan/14 5/Jan/14 5


cable laying

风阀安装air valve installation 1/Feb/14 5/Feb/14 5

风管试验、验收test and
inspection acceptance of air 25/Dec/13 30/Dec/13 6
duct
走廊、
其余房 送、回风口安装air supply and
10/Feb/14 15/Feb/14 6
间 reture air inlet installation
corrido
r
风管保温、安装air duct
remaini insulation 10/Dec/13 30/Dec/13 21
and installation
ng room
分体空调电缆敷设AC equipment 10/Dec/13 30/Dec/13 21
cable laying

分体式空调安装installation of 20/Jan/14 22/Jan/14 3


split-type air conditioner

各房间风机盘管安装installation 10/Feb/14 20/Feb/14 11


of fan coil in every room
fan coil cable laying 10/Jan/14 20/Jan/14 11

各房间风口、风阀安装
风系统 installation of air inlet and 10/Feb/14 20/Feb/14 11
0m air air valve in every room
system
走廊及各房间风管保温insulation
of air duct in every room and 20/Feb/14 28/Feb/14 9
corridor
4台空调机组安装 installation 15/Feb/14 20/Feb/14 6
of 4 AC units

各房间风机盘管安装installation 20/Feb/14 2/Mar/14 11


of fan coil in every room
fan coil cable laying 10/Jan/14 20/Jan/14 11
化学水 4.2 风系统
chemi m air 各房间风口安装installation of 20/Feb/14 11
2/Mar/14
system air inlet in every room
cal
water 走廊及各房间风管保温insulation
of air duct in every room and 25/Feb/14 5/Mar/14 9
corridor
管道支架制作、安装supports 10/Dec/13 30/Dec/13 21
fabrication & fixing

water
0m pipe
管道安装piping fitting 10/Dec/13 31/Dec/13 22

0m water 管道水压pipe test 30/Dec/13 3/Jan/14 5


pipe
阀门安装valve installation 1/Mar/14 10/Mar/14 10

管道保温pipe insulation 4/Jan/14 10/Jan/14 7


管道支架制作、安装supports 10/Dec/13 30/Dec/13 21
fabrication & fixing
管道安装piping fitting 10/Dec/13 31/Dec/13 22
4.2 water 管道水压pipe test 30/Dec/13 3/Jan/14 5
m pipe
阀门安装valve installation 20/Feb/14 25/Feb/14 6

管道保温pipe insulation 4/Jan/14 10/Jan/14 7

各房间风机盘管安装installation 1/Mar/14 15/Mar/14 15


of fan coil in every room
fan coil cable laying 20/Dec/13 11/Jan/14 23

风系统 各房间风管安装installation of 1
air duct in every room
0m air
system 各房间风口安装installation of
1/Mar/14 15/Mar/14 15
air inlet in every room
走廊及各房间风管保温insulation
of air duct in every room and 10/Mar/14 20/Mar/14 11
corridor

各房间风机盘管安装installation 15/Mar/14 25/Mar/14 11


of fan coil in every room
fan coil cable laying 20/Dec/13 11/Jan/14 23
各房间风管安装installation of
4.2 风系统 25/Dec/13 26/Dec/13 2
air duct in every room
air
m system
各房间风口安装installation of 1/Mar/14 15/Mar/14 15
air inlet in every room
走廊及各房间风管保温insulation
of air duct in every room and 10/Mar/14 20/Mar/14 11
corridor
管道支架制作、安装supports 1/Mar/14 5/Mar/14 5
fabrication & fixing
管理办 管道安装piping fitting 1/Mar/14 20/Mar/14 20
公楼 water 管道水压pipe test 20/Mar/14 23/Mar/14 4
admini 0m pipe
strati 阀门安装valve installation 1/Mar/14 20/Mar/14 20
on
buildi 18
管道保温pipe insulation 24/Mar/14 10/Apr/14
ng
管道支架制作、安装supports 10/Mar/14 20/Mar/14 11
fabrication & fixing
管道安装piping fitting 20/Mar/14 5/Apr/14 17
4.2 water 管道水压pipe test 5/Apr/14 8/Apr/14 4
m pipe
阀门安装valve installation 20/Mar/14 5/Apr/14 17

管道保温pipe insulation 5/Apr/14 15/Apr/14 11


设备安装及保温equipment 1/Feb/14 15/Feb/14 15
installation and insulation
泵间 10
管道安装piping fitting 15/Feb/14 24/Feb/14
pump
house 管道保温pipe insulation 24/Feb/14 2/Mar/14 7

阀门安装valve installation 15/Feb/14 24/Feb/14 10

屋面 制冷机组固定fixing of 5/Dec/13 10/Dec/13 6


refrigerating unit
水管安装water pipe 15/Dec/13 20/Dec/13 6
installation
室外 阀门安装valve installation 20/Feb/14 25/Feb/14 6
outdoor
水压试验hydrostatic test 26/Feb/14 28/Feb/14 3

保温及防护壳insulation and 1/Apr/13 20/Apr/13 20


protective shell
综合管 administrat 管道安装piping fitting 20/Nov/13 15/Dec/13 26
架 管道水压pipe test 16/Dec/13 18/Dec/13 3
ion
compre building
hensiv chemicalto 管道保温pipe insulation 15/Dec/13 24/Dec/13 10
e pipe 管道防护壳 pipe protective 18
water shell
24/Dec/13 10/Jan/14
rack
轴流风机安装axial flow fan 25/Jan/14 26/Jan/14 2
installation
风机房fan 轴流风机电缆及线管敷设 25/Jan/14 26/Jan/14 2
room
百叶风口安装air inlet shutters 25/Jan/14 26/Jan/14 2
installation
轴流风机安装axial flow fan 4/Feb/14 14/Feb/14 11
installation
风机线管和电缆敷设axial flow 4/Feb/14 14/Feb/14 11
cable laying
循环水泵房
CW room 百叶窗安装shutters 11
10/Feb/14 20/Feb/14
installation
循泵风管安装duct 1/Jan/14 20/Jan/14 20
installation
空调设备安装installation of AC 1/Feb/14 6/Feb/14 6
equipment

轴流风机安装axial flow fan 4/Feb/14 14/Feb/14 11


installation
配电间 风机线管和电缆敷设axial flow 11
4/Feb/14 14/Feb/14
switch cable laying
gear 剩余风管安装air duct
room 4/Feb/14 14/Feb/14 11
各泵房 instalation
pump 风管试验 air duct test 1/Dec/13 4/Dec/13 4
house
风管保温air duct insulation 5/Dec/13 20/Dec/13 16

风口安装air inlet installation 10/Feb/14 15/Feb/14 6

综合水 轴流风机安装axial flow fan 5/Jan/14 10/Jan/14 6


泵房 installation
compreh
ensive
water
pump
综合水
泵房
compreh 风机线管和电缆敷设axial flow 6
5/Jan/14 10/Jan/14
ensive cable laying
water
pump 百叶风口安装air inlet shutters 5/Jan/14 10/Jan/14 6
house installation
轴流风机安装axial flow fan 30/Dec/13 5/Jan/14 7
installation
风机线管和电缆敷设axial flow 30/Dec/13 5/Jan/14 7
消防水 cable laying
泵房 百叶风口安装air inlet shutters
fire 10/Jan/14 13/Jan/14 4
installation
fightin
g water
pump 分体式空调安装 split-type air 30/Dec/13 5/Jan/14 7
conditioner installation
house
分体空调电缆及线管敷设split-
type air conditioner cable 10/Jan/14 16/Jan/14 7
laying

分体式空调安装split-type air 22/Feb/14 24/Feb/14 3


conditioner installation
3个警卫
室 3 分体空调电缆及线管敷设split-
guard type air conditioner cable 22/Feb/14 24/Feb/14 3
rooms laying
卫生间排风安装installation of 22/Feb/14 24/Feb/14 3
air exhauster in toilet

分体式空调安装split-type air 1/Mar/14 5/Mar/14 5


conditioner installation

轴流风机安装axial flow fan 11


废水楼 installation
5/Mar/14 15/Mar/14
sewage
water 分体空调和风机电缆及线管敷设
buildin split-type air conditioner and 5/Mar/14 15/Mar/14 11
g axial flow cable laying

百叶风口安装air inlet shutters 5/Mar/14 15/Mar/14 11


installation

分体式空调安装split-type air 26/Jan/14 3/Feb/14 9


conditioner installation

轴流风机安装axial flow fan 26/Jan/14 3/Feb/14 9


检修间 installation
mainten
ance 卫生间排风安装split-type air 26/Jan/14 3/Feb/14 9
conditioner installation
room

分体空调和风机电缆及线管敷设
split-type air conditioner and 26/Jan/14 3/Feb/14 9
axial flow cable laying

分体式空调安装split-type air 20/Jan/14 24/Jan/14 5


conditioner installation

轴流风机安装axial flow fan 20/Jan/14 24/Jan/14 5


installation

制氢站
hydroge
n
generat
卫生间排风安装installation of 5
制氢站 air exhauster in toilet
20/Jan/14 24/Jan/14
hydroge
n 屋顶风机安装installation of 20/Jan/14 24/Jan/14 5
generat roof fan
ion
分体空调和风机电缆及线管敷设
split-type air conditioner and 20/Jan/14 24/Jan/14 5
axial flow cable laying

百叶风口安装air inlet shutters 20/Jan/14 24/Jan/14 5


installation
空压机
房 轴流风机安装axial flow fan 15/Mar/14 21/Mar/14 7
Diesal installation
Engine
and Air 百叶风口安装air inlet shutters 15/Mar/14 21/Mar/14 7
Compres installation
柴油机
s 轴流风机安装axial flow fan 4
房 installation
21/Mar/14 24/Mar/14
其他构 booster
筑物 station 百叶风口安装air inlet shutters
other 21/Mar/14 24/Mar/14 4
Diesal installation
struct Engine
ures 轴流风机安装axial flow fan 5
24/Mar/14 28/Mar/14
加氯间 installation
chlorin 风机电缆及线管敷设 axial flow 5
24/Mar/14 28/Mar/14
e cable laying
dosing
room 百叶风口安装air inlet shutters 24/Mar/14 28/Mar/14 5
installation
轴流风机安装axial flow fan 11/Jan/14 20/Jan/14 10
installation
百叶风口安装air inlet shutters 11/Jan/14 20/Jan/14 10
installation
卫生间排风安装installation of 11/Jan/14 20/Jan/14 10
材料库 air exhauster in toilet
storage
room 分体式空调安装split-type air 11/Jan/14 20/Jan/14 10
conditioner installation

分体空调和风机电缆及线管敷设
split-type air conditioner and 11/Jan/14 20/Jan/14 10
axial flow cable laying

调压站 分体式空调安装split-type air 29/Mar/14 31/Mar/14 3


控制室 conditioner installation
regulat 轴流风机安装axial flow fan
ion 29/Mar/14 31/Mar/14 3
installation
pressur
e 分体空调和风机电缆及线管敷设
control split-type air conditioner and 29/Mar/14 31/Mar/14 3
room axial flow cable laying

分体式空调安装split-type air 21/Mar/14 24/Mar/14 4


启动锅 conditioner installation
炉房 轴流风机安装axial flow fan
start- 21/Mar/14 24/Mar/14 4
installation
up
boiler
house
启动锅
炉房
start-
up
boiler 分体空调和风机电缆及线管敷设
house split-type air conditioner and 21/Mar/14 24/Mar/14 4
axial flow cable laying

燃油泵 边墙式防爆风机安装installation
房oil of side wall type explosion- 1/Apr/14 8/Apr/14 8
pump proof fan
house 轴流风机电缆及线管敷设 1/Apr/14 8/Apr/14 8

分体式空调安装split-type air 5/Apr/14 12/Apr/14 8


conditioner installation

辅助用 轴流风机安装axial flow fan 5/Apr/14 12/Apr/14 8


房 installation
auxilia 排风安装installation of air
ry 5/Apr/14 12/Apr/14 8
exhauster
house
分体空调和风机电缆及线管敷设
split-type air conditioner and 5/Apr/14 12/Apr/14 8
axial flow cable laying

all equipment and air valve 2013/12/30 arrive to site ,cable pipe 2013/12/04 arrive.
备注Remark

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中

视情况定as per
site
construction

shortage of
HEI materials

shortage of
HEI materials

线管未采购
HEI未提供弯头
shortage of
elbow
风阀到货后
after the
arrival of air
valve

线管采购中
HEI未提供弯头
shortage of
elbow

shortage of
HEI materials

线管采购中

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

线管采购中

线管采购中

线管采购中

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

AEPL材料未到
shortage of
AEPL materials

到货后after
the arrival of
materials

线管采购中
AEPL材料未到
shortage of
AEPL materials

到货后after
the arrival of
materials

线管采购中
AEPL材料未到
shortage of
AEPL materials

到货后after
the arrival of
materials

线管采购中

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中
shortage of
HEI materials

线管采购中
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

线管采购中

shortage of
HEI materials
线管采购中
shortage of
HEI materials

线管采购中
shortage of
HEI materials

shortage of
HEI materials

线管采购中
shortage of
HEI materials

线管采购中

shortage of
HEI materials

线管采购中
shortage of
HEI materials

shortage of
HEI materials

线管采购中
shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials
shortage of
HEI materials

shortage of
HEI materials

shortage of
HEI materials

e 2013/12/04 arrive.
One Week Look Ahead Schedule2013.10.27~2013.11.02
Working
location/room Starting time Completion
项目名称 time Up to Total Cumulati
limitatio Unit
施工项目Construction item target date 备注Remark
Name name time Qty Qty. ve %
n (Day)
roo air 风管安装air duct instalation 27/Oct/13 02/Nov/13 7 % 25 25 100 25%
f syetem
air duct installation started 1/Nov/13 100 100 100 100%
computer
room 2 100 100 100 100% shortage of
axial flow fan installation 25/Oct/13 26/Oct/13 elbow

handling of seal defect of air 27/Oct/13 31/Oct/13 5 100 100 100 100%
central duct
12. control
6m room 轴流风机安装axial flow fan 26/Oct/13 28/Oct/13 3 shortage of
installation elbow
通风器安装ventilator 6 100 100 100 100%
toilet installation
28/Oct/13 2/Nov/13

water 管道安装piping fitting 27/Oct/13 05/Nov/13 10 100 100 100 100%


system
battery 风管试验、验收test and
room
inspection acceptance of air 29/Oct/13 2/Nov/13 5 100 100 100 100%
duct
battery 轴流风机安装axial flow fan 25/Oct/13 30/Oct/13 6 100 100 100 100%
room installation

substation 网控继电
control fabrication and installation 12 70 70 100 70%
1m 室 relay of air duct flange
26/Oct/13 6/Nov/13
room room

chemical
water 0m air branch duct installation start 2/Nov/13 100 100 100 100%
system
treatment
administra 各房间风管安装installation of
air 7 25 25 100 25%
tion 0m air duct in every room and 27/Oct/13 2/Nov/13
system corridor
building

comprehens administrati 管道支架piping supports 28/Oct/13 2/Nov/13 6 25 25 100 25%


ive pipe on building
to chemical
rack water 管道安装piping fitting 25/Oct/13 2/Nov/13 9 25 25 100 25%

GI sheet 30/Oct/13
Material leafy regulator 30/Oct/13
procuremen
t
One Week Look Ahead Schedule2013.11.03~2013.11.09
Working
施工项目Construction Starting Completion time Up to date Total Qty. Cumulativ
项目名称Name location/room name Unit target
item time time limitation Qty e%
(Day)
air 3/Nov/13 09/Nov/13 7 % 25 100 100 100%
roof air duct fabrication
system
12.6mwash exhaust fan
+cleaner's air installation fan with 3/Nov/13 07/Nov/13 5 % 100 100 100 100%
system duct joint
room
batteryroo air test and inspection 3/Nov/13 09/Nov/13 7 % 0 100 100 100%
CCB m system acceptance of air duct
0m wash duct and exhaust fan 3/Nov/13 08/Nov/13 6 % 0 100 100 100%
room installation
water 3/Nov/13 09/Nov/13 7 % 0 80 100 80%
12.6m pipe fitting
system
water 4/Nov/13 09/Nov/13 6 % 0 80 100 80%
6.3m pipe fitting
system
relay 3/Nov/13 09/Nov/13 7 % 0 30 100 30%
duct install
room
substation wash room duct and exhaust fan 3/Nov/13 08/Nov/13 6 % 0 100 100 100%
control room installation
administrati
on building 0m duct installation 3/Nov/13 09/Nov/13 7 % 50 100 100 100%
supports
switch installation
3/Nov/13 06/Nov/13 4 % 10 100 100 100%
cooling gear room 3/Nov/13 09/Nov/13 7 % 0 100 100 100%
tower duct fabrication
pump house flow fan 3/Nov/13 09/Nov/13 7 % 0 50 100 50%
installation
pipe supports 3/Nov/13 09/Nov/13 7 % 0 100 100 100%
comprehensiv pipe rack installation
e pipe rack top 3/Nov/13 09/Nov/13 7 % 0 50 100 50%
pipe sfitting
flow fan
installation
3/Nov/13 09/Nov/13 7 % 0 8 100 8%
0.3333333333
备注
Remark

near unit
hold
near unit
hold

10 sets
One Week Look Ahead Schedule2013.11.19~2013.11.23
Working
Starting Completion time alread Up to date Total Qty. Cumulativ
项目名称 location/room name 施工项目Construction Unit target
Name item time time limitation y Qty e%
(Day)
air duct with flange 19/Nov/13 23/Nov/13 5 % 0 50 50 100 50%
a roof fabrication
air duct supports 19/Nov/13
23/Nov/13 5 % 0 25 25 100 25%
b roof fabrication
12.6m wash
exhaust fan
c and installation fan with 19/Nov/13 23/Nov/13 5 % 0 100 100 100 100%
cleaner's duct joint
room
CCB test and inspection
d battery acceptance of air 19/Nov/13 23/Nov/13 5 % 0 100 100 100 100%
room duct preparatory work

f 0m wash duct and exhaust fan 19/Nov/13 23/Nov/13 5 % 0 50 50 100 50%


room installation
g 12.6m pipe welding 19/Nov/13 22/Nov/13 4 % 20 80 100 100 100%
h 6.3m pipe welding 22/Nov/13 23/Nov/13 2 % 0 30 30 100 30%
relay 19/Nov/13 23/Nov/13 5 % 30 70 100 100 100%
a duct install
room
substati
on relay 4 NO.S fire damper 19/Nov/13 23/Nov/13 5 % 0 100 100 100 100%
b
control room install
room
c wash room ductinstallation
and exhaust fan 20/Nov/13 23/Nov/13 4 % 0 50 50 100 50%
return duct 19/Nov/13 23/Nov/13 5 % 50 50 100 100 100%
MV 0m installation
switch
gear supply branch air
room 0m duct supports change
19/Nov/13 23/Nov/13 5 % 50 50 100 100 100%

comprehe
nsive pipe rack pipe supports
19/Nov/13 23/Nov/13 5 % 30 40 70 100 70%
pipe top installation
rack
comprehe
nsive pipe rack
pipe top
rack pipe sfitting 19/Nov/13 23/Nov/13 5 % 0 20 20 100 20%
steel flow fan 20/Nov/13 23/Nov/13 4 % 0 5 5 150 3%
flow fan building installation
wood piad for pipe 20/Nov/13 23/Nov/13 4 % 20 20 100 20%
rubber bed (2cm) 20/Nov/13 23/Nov/13 4 % 100 100 100 100%
material
purchase damper sample 20/Nov/13 23/Nov/13 4 % 100 100 100 100%
arrive 20/Nov/13 23/Nov/13 4 % 100 100 100 100%
GI pipe joint
GI pipe elbow 20/Nov/13 23/Nov/13 4 % 100 100 100 100%
备注Remark

total 90m

total 26 piece

near unit hold


near unit hold
chemical
building

Saturday arrive
(22)Friday arrive
(22)Friday arrive
One Week Look Ahead Schedule2013.11.19~2013.11.23
Working alread target
项目名称 施工项目Construction Starting Completion time y Up to date Total Qty. Cumulativ
location/room name Unit
Name item time time limitation alread Qty e%
(Day) y
air duct with flange 24/Nov/13 30/Nov/13 7 % 30 40 70 100 70%
1 roof fabrication
fire damper 24/Nov/13 30/Nov/13 7 % 0 60 60 100 60%
2 roof installation
air duct supports
3 roof fabrication and 24/Nov/13 30/Nov/13 7 % 10 40 50 100 50%
installation
12.6m wash
exhaust fan
4 and installation fan with 24/Nov/13 25/Nov/13 2 % 0 100 100 100 100%
cleaner's duct joint
room
CCB fire damper
5 12.6m CCR installation
24/Nov/13 28/Nov/13 5 % 0 100 100 100 100%

6 12.6m CCR duct test 26/Nov/13 30/Nov/13 5 % 0 100 100 100 100%
and corridor

battery room
main duct &fire
7 to AC damper fabrication 25/Nov/13 30/Nov/13 6 % 0 25 25 100 25%
equipment and installation
room

8 0m wash room ductinstallation


and exhaust fan 24/Nov/13 25/Nov/13 2 % 0 100 100 100 100%

relay room 24/Nov/13 30/Nov/13 7 % 80 20 100 100 100%


9
substati and outside duct install
on
relay room 1install
control 10 NO fire damper 24/Nov/13 30/Nov/13 7 % 0 100 100 100 100%
room
duct and exhaust fan 24/Nov/13 30/Nov/13 7 % 0 100 100 100 100%
11 wash room installation
MV
switch supply and return
gear 12 0m to roof main duct with fire 24/Nov/13 30/Nov/13 7 % 0 40 40 100 40%
damper installation
room
comprehe pipe supports
nsive pipe rack 24/Nov/13 30/Nov/13 7 % 80 20 100 100 100%
13 installation
pipe top
rack pipe sfitting 24/Nov/13 30/Nov/13 7 % 0 40 40 100 40%
exhaust fan with
hydrogen 14 wash room duct installation 24/Nov/13 27/Nov/13 4 % 0 100 100 100 100%
fan
admin 15 first floor 24/Nov/13 30/Nov/13 7 %
pipe fitting
fire pump house
pump switchgear flow fan 24/Nov/13 30/Nov/13 7 % 0 0 0 150 0%
house 16 room installation
Chemical flow fan 24/Nov/13 30/Nov/13 7 % 0 3 3 150 2%
flow fan 17 Building installation
material 18 wood piad for pipe 24/Nov/13 30/Nov/13 7 % 20 20 100 20%
purchase
arrive 24/Nov/13 25/Nov/13 2 % 100 100 100 100%
19 damper sample
备注Remark

total 82m 60m


complete

total 5 NO.S

total 24 piece

1 NO

to AC
equipment
room total 24m
2*12m up
to roor

320m

next week
all
complete

Saturday
arrive