Beruflich Dokumente
Kultur Dokumente
446Z-SCZCINA-X-X-00002
446Z B
PROJECT SECURITY
PROCEDURE SHEET 2 OF 51
MANAGEMENT PLAN
Table of Contents
1 GENERAL 3
1.1 INTRODUCTION 3
1.2 DOCUMENT OBJECTIVE 3
1.3 SCOPE 3
1.4 REFERENCES 3
1.5 DEFINITIONS 4
1.6 ABBREVIATIONS 5
1.7 SCOPE OF WORK 5
1.8 SECURITY OBJECTIVES FOR THE PROJECT 5
1.9 SPECIFIC SECURITY TARGETS 6
1.10 ROLES AND RESPONSIBILITIES 6
1.11 OTHER REQUIREMENTS 10
2.1 SECURITY ACTIVITY PLAN 10
2.2 POLICIES / STRATEGIES / GOALS 11
2.3 PROCESS AND PROCEDURES 12
2.4 ORGANISATION & RESOURCES 17
2.5 IMPLEMENTATION, MONITORING AND CONTROL 19
2.6 DEMONSTRATE COMPLIANCE 22
2.7 MANAGEMENT REVIEW 23
LIST OF ATTACHMENTS
1. HSE Policy
1. a .SONATRACH HSE Policy
1. b. DODSAL HSE, Quality and Security Policy
2. Security Organisation Chart
3. Security Training Matrix for the Project
4. Security Inspection / Audit Schedule
5. Security Standards.
6. Security Arrangements (Layout)
a. Security arrangements (layout) at camp
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
PROJECT SECURITY
PROCEDURE SHEET 3 OF 51
MANAGEMENT PLAN
b. Security arrangements (layout) at work location
c. Security arrangements (layout) during transit
7. Visitors/Vehicle Ledger
1 GENERAL
1.1 INTRODUCTION
This Security Plan contains key Security aspects of SONATRACH, DODSAL and Project
requirements. This document should be read in conjunction with our HSEQ Policy,
Management System Philosophy, Management System Requirements and other
documents referenced herein.
This Security plan describes the security arrangements to ensure effective security
arrangements are applied works/activities of execution of ZCINA Gas Compression and
Reinjection Station in Hassi Messaoud and Gas Pipeline.
1.3 SCOPE
This Plan addresses Security Protection to assets (camp, people, property, material
Transportation, all journeys, works activities etc.) during all phases of the project.
1.4 REFERENCES
446Z B
PROJECT SECURITY
PROCEDURE SHEET 4 OF 51
MANAGEMENT PLAN
Algerian Security Regulation at Hassi Messaoud
1.5 DEFINITIONS
OWNER SONATRACH
CONTRACTOR The party which carries out all or part of Engineering, Procurement,
Construction, Pre-commissioning and Commissioning of the Project
PROJECT Persons, firms, companies or partnerships appointed by COMPANY to
MANAGEMENT perform PROJECT Management Services for the PROJECT on behalf of
CONSULTANTS (PMC) the COMPANY
SECURITY INCIDENT Any planned and desired (by someone) event or condition that
results or could have resulted in harm to people, damage to
property or loss.
HAZARD A danger, usually in the form of unsecure condition or act
SECURITY BADGE The identity card issued by the OWNER security office / Dodsal
security office bearing the specified details of the person.
SECURITY ZONE The perimeter of the area defined by Dodsal where Dodsal
security control / security management exists.
446Z B
PROJECT SECURITY
PROCEDURE SHEET 5 OF 51
MANAGEMENT PLAN
1.6 ABBREVIATIONS
For the Compression Station for Gas Pipeline ZCINA/446Z project, this Security plan
applies to all Dodsal activities including SONATRACH, DODSAL personnel Dodsal’s
Vendors and Subcontractors associated with this project.
This Plan addresses all types of security risks and mitigation measures during all phases of
this project.
This Plan will be reviewed periodically as the project progresses and if any site specific
security requirements are identified, shall be agreed upon and implemented.
In line with the HSE, Quality and Security policy the following objectives are identified to
establish a positive and effective approach to protect the Project assets from security
hazards and threats/vulnerabilities:
To complete the project without sustaining loss to materials, equipment’s and people.
To strengthen the security system by employing highly competent and authorised
security personnel.
To establish an effective access / egress controls to prevent unauthorized individuals
or vehicles from entering camp, construction and pre-commissioning areas.
To establish personal security protection against assailants and deterrents.
To ensure all vehicle travel is covered under journey management.
To establish an effective working relationship and cooperation with the OWN ER,
OWNER and government security personnel.
To ensure effective security operational control by ensuring uninterrupted
communication and intelligence network for threat detection and prompt notification.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
JOB No. REV.
446Z B
PROJECT SECURITY
PROCEDURE SHEET 6 OF 51
MANAGEMENT PLAN
Based upon the above goals/objectives project Security targets have been set.
Project Manager
Ensures that this Site Security Plan and Organization is established and its derivative
programs, procedures and work practices are implemented to provide adequate and
continuous security coverage.
Communicates with local and governmental law enforcement bodies and security
organizations in accordance with both legislative and the OWNER requirements as
and when required.
Ensures that all recommendations raised and reported by Security Manager from
investigations of incidences (such as theft, sabotage, unauthorized entries etc.) are
supported for close out.
Carrying out regular reviews with all members of the project management team on the
effectiveness of the security arrangements.
Ensures that site security is included on the agenda of the project HSE committee
Meetings.
Takes daily feedback from site Security Manager.
Ensures arrangement of required training and its resources as applicable.
Report any security irregularities or breaches or incident that has taken place
Ensure that the incident investigation is conducted on all security incidences/ issue
Security In-charge
446Z B
PROJECT SECURITY
PROCEDURE SHEET 7 OF 51
MANAGEMENT PLAN
Reports to Project Manager / HR Manager of the site and communicates to HR HO
representative periodically
Manages reviews and develops the security operation to ensure that it fulfils Project
requirements.
Ensures compliance of security needs through security team in accordance with the
planned security procedures.
Monitors the effectiveness and implementation of security management system (i.e.
site/camp security patrols, gate control of works/visitors/vehicles, transit to/from the
site/camp)
Liaises with local authorities, client security head, interested parties, site HSE Manager
and Project manager.
Arranges required training and ensure its compliance
Reports any security irregularities or breaches or incident that has taken place.
Ensures conduct of incident investigation and suggest remedial measure to prevent
such incidences in future. Wherever required provide full support to local authorities as
per management decision.
Ensures that the security resources are adequate to cover all project needs and
site/camp security operations reflect the requirements of the Project.
Provides support to the Security Manager in the management of the project security
team.
Ensure that appropriate Subcontractor and OWNER Staff are made aware of all
security requirements.
Makes report without delay to the Site Manager and Security In-charge when any
security irregularities or breaches or incident have taken place.
Supports in resourcing required information, manpower and training.
Coordinates Journey Management at site level through site Journey co-ordinator.
HSE Manager
Coordinates with Security Manager for the implementation, review and conducting
incident investigation.
Conducts orientation/awareness trainings relevant to Site Security as applicable.
Advises on any security Hazard and legal requirements related to project
Reports any security irregularities or breaches or incident have taken place.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
JOB No. REV.
446Z B
PROJECT SECURITY
PROCEDURE SHEET 8 OF 51
MANAGEMENT PLAN
Conducts journey management review and audit as per schedule.
Security Guards
Shall keep themselves clean and neat and be competent to perform duties as
required.
Attend daily security meetings prior to start of the shift as directed.
Ensure proper handling security gadgets issued
Provide access control and maintain thorough knowledge of emergency responses.
Ensure Compliance with traffic rules and Maintain adequate traffic management as
planned at defined places such as crossings and public places.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
JOB No. REV.
446Z B
PROJECT SECURITY
PROCEDURE SHEET 9 OF 51
MANAGEMENT PLAN
Carry any special or specific orders or instruction as prescribed by Security
Coordinator / Manager.
Confirm Material Passes are signed by designated person, when
CONTRACTOR/SUBCONTRACTORS bring-in or take-out any materials, equipment’s
or tools to/from the site/camp.
Issue visitors Identification (I.D.) cards.
Compile and issues the Daily Security Report submitted to Security In-
Charge/Manager.
Establish a good communication system with providing transceivers, etc., to security
personnel.
Ensure they report daily routine jobs as well as any security matters observed.
Shall fully aware of any orders or instructions given by the Security In-
charge/coordinator and ensure their thorough observance.
Report promptly any security incident to the Security Manager. A written report shall
follow without delay, including the immediate measures taken.
Conduct patrols as nominated and applicable.
Escort visiting vehicles and personnel as required.
Report daily to line manager on topics and status of security and submit a daily report
for review.
Check conformance to project requirements concerning security passes, in relation to
both personnel and vehicles entering the project at all accesses/egress to site/camp.
Ensuring all personnel are checking in and out of site.
Explain all applicable security rules to the visitors
Inform applicable persons or offices of the arrival of a visitor, vehicle and/or equipment
and issue a temporary pass. Keep all records of all visitors, equipment daily.
Patrol and observe those areas to which they have been assigned.
Assist in the control of traffic and supervises smooth ingress and egress of personnel
to and from site.
Conduct searches of all vehicles entering and exiting the project and question
individuals entering or leaving the site, if necessary.
Check Material Passes and Waste Manifests against content in the vehicle.
Respond to alarm signals (fire alarms or other danger signals) and participate in the
emergency response procedures and emergency response team training and
activities.
Communicate adequately with the oncoming shift to ensure smooth turn over an d to
facilitate execution of the duties.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
JOB No. REV.
446Z B
PROJECT SECURITY
PROCEDURE SHEET 10 OF 51
MANAGEMENT PLAN
Ensure compliance with local/site policies such as: no smoking areas, photography,
drugs, alcohol and prohibited firearms.
Shall adhere and abide by the Security Procedures/ Practices at all times.
Always possess an identity card / Professional Badge.
Employees’ personal belongings are the responsibility of the individual.
Report any security irregularities or breaches or incident have taken place.
Participate in incident investigation whenever required.
Provide all required cooperation to Security Guard in discharging his duties.
Dodsal shall follow and implement Algerian security policies and regulations of Hassi
Messaoud region as applicable for this project.
Dodsal shall engage HRM region security authorities “Specialised and Approved Security
Firm” as sub-contractor for internal security i.e., protecting the goods and persons within
the boundaries of the camp and worksite as per the contract.
The engaged specialist security firm shall review and update this internal security plan as
per the Algerian security policies and Hassi Messaoud region security committee
guidelines. This internal plan shall define the field of intervention of the internal security
and assesses the various risks and threats to which the establishment is exposed.
This internal security plan shall be submitted to Hassi Messaoud security Committee for
approval.
(See overleaf)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
446Z B
2.2.1.5 Business Process Improvement DOD-MP-MGT-007 Business Process MD 6 monthly Corporate approved
Plan- ensures opportunities for Improvement Plan review Business Process
improvement are effectively Improvement Plan report.
managed.
446Z B
2.2.1.7 Risk Management DOD-MP-MGT011 Risk Management Project Manager Security Audit Security Risk
Assessment
01-xxxxx-MGT-MP- Security Strategy Project Manager Security Audit Project Security
014-xx Plan and Audit
Report
2.2.1.8 Project Change Control- ensure that all As per project Project execution Project Manager Security Audit Check all
aspects of change are identified, procurement plan change
followed up and closed out Notices
against
Revised
Deliverables.
Audit Report
2.2.2 Core/Support Process and Procedures (Planning and Risk Management)
2.2.2.1 Project Management
Contract review – Project execution
i) Contract Review–Post award DOD-OPR-015/1 Post Award Project Director Quality Audit Plan and
review, clarification and acceptance of /Project Mgr. /Security Audit Procedures.
contract conditions. Planning Audit Report
Planning
ii) Plan activities organise resources DOD-OPR-015/9 Control of production Project Manager / Security Audit sched
and ules
and execute job to deliver the project Planning Manager progre
service provision ss reports
to meet contractual requirements DOD-OPR-015/2 Audit
Report
Activity Activity Description Document / Procedure Compliance Verif
ying
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
vi) Employee Health Programme - DOD-OP-HRD-006 Employee Health Project Security audit Check HR relevant
gives details about medical fitness Programme Manager/P&A document and first aid
required and frequency for medical Manager/RMO registers.
check-up and facilitation on site in
view of health and welfare
programme/procedure.
446Z B
ii)Purchase process, from receipt DOD/PIC/013/2 Purchasing Process Project manager Security Audit PO records and MR’s
of material requisition to / Procurement /Quality audit Audit Report
goods/services / receipt ,issue In-charge
and reconciliation
iii) Verification and Traceability of DOD/PIC/013/3 Verification and Project manager Security Audit Audit Report
Purchased Product Traceability of
Purchased Product
iii)Control Suppliers DOD-OPR-015/8 Control of suppliers Project manager Security Audit Approved vendor list
Audit Report
v) Supplier surveillance and DOD-OP-QAC-006 Source Inspection VP Procurement HSE. Quality Inspection report
inspection Management and Security /observation
Audits. Audit Report
vii)Handling, storage and DOD-OPR-015/5 Management of Procurement/ Security Audit Property lease records
preservation of customer Customer property Store Manager and transaction record
issued items Audit Report
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Document / Procedure
Activity Compliance Verifying
Activity Description
No. Number Title Activity Owner Method Document/Activity
2.2.2.3 Construction
i) Security Risk Management: 01-xxxxx-MGT-MP- Security Strategy Project Security Audit Security risk assessments
identify Hazards, assess risks 014-xx Manager/ Audit Report
and implement control measures Construction
for project construction works. Manager
ii)Security arrangement planning: As per Project Project Security Project Security Audit/ Audit Report
to ensure that effective numbering Plan Manager/ Quality audit
arrangement are in place at all procedure Security
work / areas . coordinator
iii)Security– suitable arrangement DOD-OP-HRD-006 Site Security Project Security Audit Security Records
to be made to safe guard Management Manager/P&A Audit Report
personnel, the property and Manager
access control of material
iv) Emergency Plan for Security Project specific Project Project Manager HSE and Project Emergency Plan
emergencies and provide Emergency Plan / HR / HSE Security Audit Audit Report
adequate response (including 01-IMS-CP-0003 Emergency
Rapid Action Force & Medical Preparedness
Evacuation) and Response
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Document / Procedure
Activity Compliance Verifying
Activity Description
No. Number Title Activity Owner Method Document/Activity
2.3 ORGANISATION & RESOURCES
2.3.1 Organisation
2.3.1.1 Dodsal Management Project specific Overall Project Project Manager Security Audit Project approved
Organization organization chart.
Chart Audit Report
2.3.1.2 Security Department See Attachment 02 Project Project Manager Security Audit Project approved
Organization Organisation chart.
Chart-Security Audit Report
2.3.1.3 Mobilisation of required and DOD-HRD-014 Personnel and Project Manger Security audit Project specific manpower
suitable personnel as per Project DOD-OPR-015/7 administration loading chart. Audit Report
specific requirement and loading
chart.
2.3.2 Training and Competency Assurance
2.3.2.1 Security Training Programme – See Attachment 03 Security Training Project Manager Security Audit Training record , reports.
both Internal & External Program Audit Report
maintained to ensure programme
is delivered.
2.3.2.2 Performance Appraisal – carry DOD-HRD-014 Personnel PM/P & A/HR Quality Audit Appraisal Records
out annual appraisal for all Administration Manager Audit Report
personnel and identify training
requirements.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Verifying
Activity Document / Procedure
Compliance
Activity Description Number Title Activity Owner
No. Method Document/ Activity
446Z B
2.3.3.6 Conducting Security workshops Project Specific N/A Project Security Security audit Report on work shop
on subject identified from site In-Charge conducted.
activities. Audit Report
2.3.3.7 Display of sign board and Project Specific N/A Project Security Security audit Site conditions.
posters relevant to activities on In-Charge Audit Report
site.
2.3.3.8 Security Monthly activity report Project Specific Security monthly Project Security Security Audit Security Activity monthly
to PHO and HO report In-Charge reports /records
Audit Report
2.4 IMPLEMENTATION, MONITORING AND CONTROL
Implementation of the work is conducted as per planned arrangements as defined in Section 1,2 and 3
The Plan-Do-Check-Act cycle is an integral mechanism in the implementation of management system control and is implemented
directly by the personnel who operate the process and controlled by the procedures mentioned below.
Measures used for both active and reactive monitoring are supported by formal procedures which ensure that suitable corrective and as necessary preventive
actions are identified.
TYPICA
Procedures referenced in this section focus more on the monitoring/ control / review of the implementation of the work
2.4.1 Active Monitoring and Control
2.4.1.2 Procurement / Material
Management
L
Ensure Safe and Secure transit of DOD-OP-HRD-006 Site Security Security In Journey Management Material movement
materials and equipments Management Charge Procurement / HR report and arrangement
requisition.
Security Audit Audit Report
446Z B
2.4.1.3 Construction
General – Project specific Security Project Manager Security audit Inspection reports.
Ensure work is carried out in Security Strategy Arrangement Construction Security planning of
secure environment with Proposed Manager / Project areas
adequate security Security In Audit Report
arrangement such as static / Charge
mobile / patrolling security.
DOD-OP-HSE-021 Personal Security audit Observation Reports
ii) Provision and use of Project Specific Protective Project Manager/
PPE’s and uniform as Equipment Security Manager
defined. Project specific Site Traffic Security audit Traffic Management
Management Project Manager/ plan
Site Traffic Management Security Manager Audit Report
arrangement.
.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Document / Procedure
Activity Compliance Verifying
Activity Description
No. Activity Method Document/ Activity
Number Title
Owner
2.4.2 Reactive Monitoring and Control (’Reactive Activities’ are applicable to all phases of the work.)
2.4.2.1 Incident/Accident DOD-OP-IMS-003 Incident Notification Project Security Audit Incident/Accident report
Reporting/Monitoring – Manager/ and investigation
Recognition and consideration of Project records.
injuries and causes of property Security Audit Report
damage, loss, near misses and In-Charge
complaints
2.4.2.2 Incident/Accident Follow up – Project specific Incident Reporting & Project Security Audit Incident/Accident
Track and follow up all actions to a Investigation security Report and
satisfactory close out. Procedure In-Charge Investigation Records
Issuances of monthly reports of and Incident investigation
incident investigation, Project recommendations close
recommendation, close out. Manager out reports on monthly
basis Audit Report
2.4.2.3 Non Conformance – non DOD-CP-QAC- Control of Project Security Audit Closeout to
conformity to supplied 001 Nonconforming Manager / Observations & NCR's
materials/equipment, Product Project raised
specifications, approved security Audit Report
documents, and procedures, etc. coordinato
is recorded and resolved. r
2.4.2.4 Corrective Actions – all audit DOD-CP-IMS-001 Audit Programmes Project Security audit Corrective actions and
corrective actions and observation Manager observation register
are followed up and closed out. and follow up of
tracking actions ,
Report Audit
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
446Z B
2.6.2 Security Management Review – DOD-MP-MGT-002 Management DMD and Security Audit Yearly Review Report
Yearly management review report. Section 6.2 System Security Audit Report
Requirements Committee
(MSR)
The procedures referenced in this Project Security Activity Plan are primarily Dodsal Corporate Procedures which can be adopted for any
project by covering with Instruction to procedure, DOD-FM-HSEQ-001.
446Z B
446Z B
446Z B
TYPICA
L
`
Attachment 1.b
&
(02 Sheets)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
446Z B
TYPICA
L
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
TYPICA
L
Attachment 2
(01 Sheet)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Project Manager/
Director
Security Manager
Security Super-
visor - Camp YPIC Security Supervisor
Work front -1
Security Super -
visor – work front-
2
Security
Supervisor –
Patrolling team
446Z B
(1 Sheet)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
09 Other specific Yes Yes Yes Yes Yes Yes Yes Yes As applicable
Note: This all training will be given by competent persons/ third party as applicable. In case of in house training competence
required will be similar work experience of 10 yrs., Training experience of 02 yrs and approval from client / project manager.
This schedule is subject to change as per project requirement and client directive.
446Z B
(1 Sheet)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Week
Week
Week
Week 1
Week 2
Week 3
Week 4
Week 5
Week 9
Week 6
Week 7
Week 8
SL. Types of Inspections /Audits STATUS REMARKS
10
12
11
1 Communication system inspection x x x x x x x x x x x x
2 Security of storage yard, Materials and Plant x x x x x x x x x x x x
3 Periphery Surveillance Inspection x x x x x x x x x x x x
YEAR:
Month
Month
Month
Month 1
Month 3
Month 5
Month 9
Month 2
Month 4
Month 8
Month 6
Month 7
SL. Types of Inspections /Audits STATUS REMARKS
10
12
11
4 Worksite security x x x x x x x x x x x x
5 Drug /Alcohol Inspection x x x x x x x x x x x x
6 Security Vehicle Inspection x x x x x x x x x x x x
7 Security Equipment Inspection x x x x x x x x x x x x
8 Camp Security Inspection x x x x x x x x x x x x
9 Access / Gate Control Inspection x x x x x x x x x x x x
10 Corporate Security Management System Audit x x x x
11 Emergency Preparedness Drill x x x x
446Z B
Security Standards.
(10 Sheets)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
The camp security will be continuous for 24hrs and shift duty timing shall be as per
the local requirement.
Night work duty timing will be as per requirement and shall be in line with legal duty
schedule.
446Z B
Any personnel losing their badge must immediately notify their supervisor and
such supervisor shall immediately work with Security Manager to investigate
the matter.
In the interest of safety and security, the number of vehicles permitted entry into the
site shall be minimized. This will be achieved by the use of vehicle permits issued by
the Security Manager/ security supervisor, only after a full inspection the vehicle will
be allowed. Visitors vehicles will be parked in a parking area at the site, buses will be
parked in a designated parking area as identified by CONTRACTOR/OWNER
Security Manager.
446Z B
Personnel Access
Vehicle Access
In the interest of both safety and security, the number of vehicles permitted entry
onto the worksite shall be limited.
This shall be achieved by the use of vehicle permits, which shall be issued by the
security office only after successfully undergoing inspection and receiving full
insurance details of the vehicles in question.
In the event that a driver breaches any worksite rules and regulations relating to
vehicles on the project, this may result in suspension or confiscation of the pass.
Only drivers possessing an appropriate national driving qualification and a project
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Visitors
The following requirements shall apply to all visitors, visitor vehicles and their drivers:
Visitors or their host shall inform the Security Officer of the date of visit prior to
arrival.
Visitors shall sign in the Visitors/Vehicle Ledger at the gate and will be issued
a temporary visitor pass. The temporary pass shall be surrendered when
leaving the site. See the Attachment – 7, “Visitor / Vehicle Ledger”.
Visitor shall not be allowed access into the site unless the person whom the
visitor wishes to see has agreed to the visit. The project person (visited
person) shall assume full responsibility for the actions of his visitor whilst on
the site.
Visitors shall take only instructed routes to their destination. Under no
circumstances are visitors allowed to drive on the construction site.
The vehicle of the visitor shall not be allowed to enter into the project
premises. Visitors shall travel only in DODSAL vehicles to enter inside of the
project premises.
Visitors shall not be allowed access inside the construction area without
permission of the Security In-charge/HSE Manager and must at all times be
escorted by construction personnel.
The security guards should handle unannounced visitors such as government
officers and community representatives in an appropriate and courteous
manner.
Entry of such persons as mentioned below is prohibited unless otherwise
authorized by the CONTRACTOR Security In-charge/Manager and/or
OWNER Security Manager.
o Visitors carrying a camera or video camera, without permission, this
includes mobile phones fitted with a camera. (Visitor shall be allowed
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
s.
o Visitors to workmen during working hours.
Bringing his own personal materials/equipment into the construction site shall
register it with the Security Officer at the gate if he wishes to remove it later.
Materials / Waste
Materials including equipment’s and tools shall not be allowed to be removed from
the construction site without a “Material Gate Pass”, issued and signed by an
authorized person
The security guards at the gate shall check Material Passes and Waste
Manifests against contents in the vehicle.
Whenever any discrepancies are found, the vehicle shall not be allowed to
leave the site. The guard shall immediately inform the Security In-
charge/Manager.
Photographs / Camera
All vehicles entering and leaving the site may be subject to search by
the Security Guards at the gate. Carrying of weapons of any form
anywhere on the project is prohibited.
Random searches of personnel may, as necessary be carried out by
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
da
, if
applicable, shall be notified and required to come to the gate, where the
person will again be requested to allow for the search. Where such a request
is again refused by the individual, the CONTRACTOR Security In-
charge/Manager may notify the OWNER/OWNER or Local Police authorities
of the situation, requesting their attendance at the site and possible further
actions.
446Z B
The warehouses and lay down yards are recognized as potential areas of
significant security risk areas and appropriate safeguarding facilities including
fencing and lighting shall be provided.
Utilize a system of identification on all of their tools, equipment and plant, and
provide secure containers and fencing.
Maintain an inventory of all such tools and equipment’s.
In support of this, security personnel shall not allow any materials, tools or
equipment to be taken from the worksite, unless accompanied by a Material Gate
Pass authorized by the relevant CONTRACTOR approved person.
446Z B
The timing, frequency and routes of patrol shall vary and shall not develop
into a regular pattern.
Fence lines shall be adequately patrolled daily to ensure that there is no
breach. Where a beach is noted, immediately action shall be taken to re-
secure.
Before a perimeter fence may be opened for construction purposes approval
of OWNER must be sought. All such openings shall be manned at all times.
All gate accesses shall be secured by guards and other areas shall be
secured by patrolling periodically.
The results of the patrol shall be documented using the Attachment – 7,
“Security Patrol Log”, and a copy produced to the Security In-charge/Manager
for his review.
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
1. The complete project team and work force will be residing at the camp.
2. The Project Site Office/ Client Site Office will be located at camp in the same
premises
3. The fabrication yard, warehouse, lay down area and equipment storage
vehicle fuelling, vehicle maintenance, car parking, clinic and others will be
located at camp.
The camp/site office and Temp facilities will be constructed as per the
OWNER guidelines, with all security arrangements i.e. proper barricading,
Single Gate entry, Access control system, General Alarm system etc.
This establishment will be manned by a 24 hours round the clock Security
provided for the duration of Project execution at site.
(For typical lay out please refer Attachment 5a)
Security shall be provided at various work locations while work is being executed.
There will be more than one work front in a given time, in this scenario each work
front shall be secured by the team of security guards leaded by the security
supervisor.
There will be access control for man and material maintained and related logs will
be maintained
All work place shall be barricaded with suitable arrangement as applicable and
decided by the Security Manager and Project Manager.
In case of the work related to road crossings and the work near to public access, in
addition to security guard there will be adequate arrangement for traffic control.
Each work front / bubble will be monitor by security patrol in addition to local work
place security guard.
446Z B
hall
ical
response team, OWNER, local authorities and police. A procedure for contacting
such authorities shall be set-up in advance to avoid confusion at the outbreak of an
emergency. Names and telephone numbers of personnel and authorities to be
contacted in case of an emergency shall be displayed conspicuously.
Fire
Any guard who discovers a fire shall first raise the alarm, then, if able without any risk
to himself, try to put it out with a nearby fire extinguisher or other suitable means. If
the fire is uncontrollable he shall immediately inform the emergency contact number
and then the Project HSE or Security In-charge/Manager for further action. Refer
Attachment 6. and project specific emergency response plan.
Thefts
Any guards, who find thieves, shall take efforts to stop or arrest or drive away
thieves. An immediate call to police or report to P&A Manager and HSE Manager or
OWNER Security Manager of the case shall be made for his decision for further
actions.
Troubles
In the event of a quarrel or other troubles, the guards shall immediately intervene to
pacify the matter. Immediate report shall be made to Security In-charge/Manager for
necessary action.
Accident
Any guard who witnesses an accident shall make an immediate report to HSE /
Security Manager or P&A Manager. If the accident results in personnel being injured,
inform the First Aid Clinic for medical help. “Emergency Preparedness and Response
Procedure”,
Strike
446Z B
Arrangements (Layout)
(3Sheets)
446Z B
Security Patrol
Fencing of height .
Camp and office location
TYPICA
L
446Z B
Temporary barrier
Work area and ROW
Mobile patrol
Security Guard
TYPICA
Temporary security check point entry/ exit
L
Note: The arrangement of Entry exit point may vary depending on work location, there may be entry and point separate depending upon
space constrain. The entry exit point shall look for access control and material in out log from site location. The mobile patrol is not
permanent it will be done on Adhock basis for full site.
446Z B
7OO KM
ICAL Pipeline
Pipeline
Expat vehicle
Local Airport
Escort vehicle
Attachment 7
(1 Sheet)
COMPANY’S DOC. NO. 446Z-SCZCINA-X-X-00002
446Z B
Vehicle Permit
Vehicle No. / Driver’s Name
No.
Purpose of Visit
Time Entered
Time Left
Remarks: