DURATION
PROCESS (WORKING DAYS)
FROM TO
ENGAGEMENT OF GENERATION COMPANIES IN  ENERGY 
REGULATIONS NO. 1‐94 PROGRAM 68 48
(THROUGH THE ESTABLISHMENT OF TRUST ACCOUNTS)
68 + 4.5
CERTIFICATE OF ENDORSEMENT (COE)
24
TO THE ENERGY REGULATORY COMMISSION (ERC)

GRANTING OF FINANCIAL BENEFITS TO HOST 
76 45 DAYS 
COMMUNITIES UNDER ER 1‐94, AS AMENDED PROCESS 
per Project Proposal
FLOW IN ACCESSING DLF AND RWMHEEF
GRANTING OF FINANCIAL BENEFITS TO HOST 
COMMUNITIES UNDER ELECTRIFICATION FUND OF ER 1‐ 64 57 DAYS
94, AS AMENDED
AVAILMENT OF SUBSIDY UNDER THE NATIONWIDE 
INTENSIFICATION OF HOUSEHOLD ELECTRIFICATION  51 44 Days per Project 
Proposal
(NIHE) PROGRAM
QUALIFIED THIRD PARTY APPLICATIONS FOR  New 57.5
ENDORSEMENT TO ERC

APPLICATIONS FOR PV MAINSTREAMING PROGRAM  New 64
UNDER ELECTRIFICATION FUND OF ER1‐94, AS AMENDED

1ST ENDORSEMENT TO THE SECURITIES AND EXCHANGE  New 2.5


COMMISSION (SEC)
CLEARANCE TO  UNDERTAKE SYSTEM IMPACT STUDY (SIS) 
ENDORSEMENT  TO THE NATIONAL GRID CORPORATION  New 2.5 (Non – RE)
OF THE PHILIPPINES (NGCP)
CLEARANCE TO  UNDERTAKE SYSTEM IMPACT STUDY (SIS) 
ENDORSEMENT  TO THE NATIONAL GRID CORPORATION  New 4.5 (RE)
OF THE PHILIPPINES (NGCP)
ENDORSEMENT OF CERTIFICATE OF NON‐OVERLAP (CNO)  
& CERTIFICATION PRECONDITION (CP) TO THE NATIONAL  New 2.5
COMMISSION ON INDIGENOUS PEOPLES (NCIP)
CERTIFICATION TO THE PHILIPPINE NATIONAL POLICE 
(PNP) AS A REQUIREMENT FOR THE ISSUANCE OF THE  New 2.5
LICENSE TO POSSESS EXPLOSIVES/EXPLOSIVE 
INGREDIENTS/CONTROLLED CHEMICALS AS PURCHASER
APPLICATION FOR DIRECT CONNECTION  New 65
ENGAGEMENT OF GENERATION COMPANIES IN ENERGY REGULATIONS NO. 1-94 PROGRAM
(THROUGH THE ESTABLISHMENT OF TRUST ACCOUNTS)

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of application with 
complete supporting documents

Receipt/Endorsement of the application to Power  TL:  4792900 
Planning & Development Division (PPDD) and Rural  Loc. 414 4F, DOE Main Building
Office of the Director, EPIMB 1
Electrification and Management Division (REAMD)

Sr. SRS, REAMD/PPDD/REMB Evaluation of Application and Determine the 
completeness of documentations 4

REAMD coordinate with GENCOs for the transmittal  Loc. 417 4F, DOE Main Building


Sr. SRS‐REAMD of E‐Copy Template MOA 2

Forging / Review of MOA 10
REAMD / Legal Services

Submission of signed 
Sr. SRS‐REAMD / GENCOs and notarized MOA/Review 22
of Legal

OSEC / USEC / OD/IAS / FS  Approval and Signing of memorandum to the  3
secretary endorsing *

Legal Services Notarization of MOA 5 Loc. 403 ERL Building 3

Sr. SRS, REAMD/PPDD
Releasing of MOA to PPDD 1

LEGEND REQUIREMENTS CHARGES & FEES LEGAL BASES


1.) Letter Request addressed to the Office of the Secretary, Attention to the Office of the Undersecretary, copy
Applicant furnished Office of Director of Electric Power Industry Management Bureau
No fees ‐ Sec. 5(i) of 
DOE 2.) Company Profile of the Generation Company RA7638
3.) Articles of Incorporation ‐ Rule 29 Part A of 
4.) By-Laws
For  Signing/Approval of MOA 5.) Project Background/Description RA9136‐IRR
 Office of the Secretary  6.) Official name of the Generation Facility
7.) Exact Location/Address of the Generation Facility 48 DAYS
8.)Commissioning Target/Date
* MOA signing will be scheduled 3  9.) Off-taker of Electricity as confirmed with the signed PSA
times a week in a designated room 
at Power Bureau. A Memo will be 
10.) Host Community/ies and/or People affected while on Commercial Operations
11.) Installed Capacity/Dependable Capacity
12.) Historical Power Generation Data (for existing Generation Facility)
(68 Days)
issued to the concerned DOE  13.) Service/Operating Contract (for Renewable Energy-Based Generation Facility)
officials informing them of the  14.) Certificate of Assumption of Accountability (applicable to the Successor Generation Company that takes on
scheduled MOA signing the Ownership/Operatorship of the Previous Generation Company whether under a new name or using the
same company name as the case maybe)
15.) Contact details of the Generation Company to include the name, designation, telephone
numbers and e-mail address of its designated contact person/s
CERTIFICATE OF ENDORSEMENT (COE) TO THE ENERGY REGULATORY COMMISSION (ERC)

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE
Submission of application with 
complete  supporting  documents
TL: 4792900
0.5 Loc. 202/386 4F, DOE Main Building
SRS II, Power Planning & Development  Evaluation of  application
Division (PPDD)
For  Renewable Energy (RE) projects
REMB endorsement  2

MOA on the establishment
Senior SRS, REAMD 15
of trust accounts  

SRS II, PPDD Preparation of COE and memorandum 
0.5
Chief SRS, PPDD Review and endorsement of COE and MOA

EPIMB Director  Review & Signing of memorandum, endorsing the  Loc. 414 4F, DOE Main Building


Assistant Secretary MOA and COE for his approval and signature
Undersecretary 
Approval & Signing of COE & MOA 
DOE Secretary 3 

Transmittal to EPIMB‐PPDD of signed COE & MOA
Office of the DOE Secretary 0.5 

Senior SRS, REAMD / Legal Services Notarization of MOA  1 

Payment of Processing Fee for  COE 
0.5
Release of  notarized MOA and COE 
Clerk, PPDD
to Applicant 

LEGEND REQUIREMENTS CHARGES & FEES LEGAL BASES


Applicant 1. Letter of Request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB   Minimum of P500.00 (<1MW) ERC Guidelines for the issuance of 
DOE
Director (parallel submission to  DOE Records Division and EPIMB‐PPDD)  P1,000.00 (1MW to <10MW)  Certificate of Compliance for 
2. Company Profile  Maximum of P10,000.00 or   Generating Companies/Facilities
3. Project Background/Description  to include the installed capacity, plant type, exact location/address of the  P100.00 per MW of installed 
power‐ generating  facility, official  name of the power‐generating facility, target commissioning date, off‐ capacity whichever is higher for 
taker of the electricity, host  community/ies, etc.)
4. Articles of Incorporation of Company
5. By‐Laws of the Company
10MW and above 
24 DAYS
6. Certificate of Assumption of Accountability (applicable to the successor company that takes on the 

(68 + 4.5 Days)


Ownership and/or takes‐over the operations of the previous generation company whether under a new 
name or using the same company name as the case maybe)
Additional for Renewable Energy Power Projects:
7. Copy of the Service Contract
8. Copy of Certificate of Registration of Proponent as RE developer
9. DOE‐approval on the transfer of assignment
10. DOE‐REMB endorsement of the project (status of service contract, transfer of assignment,
increase/decrease in capacity
GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ER 1-94, AS AMENDED
PROCESS FLOW IN ACCESSING DLF AND RWMHEEF

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of project proposal

TL: 4792900
Loc. 416/417 4F, DOE Main Building
Office of the Director, EPIMB / Receive / Verify application / Checking of 
Documents  1
NEPMAS, REAMD

SRS / SSRS, REAMD Evaluate complete project proposal 5

Chief, REAMD / Office of the Director, EPIMB /  Review / endorsement of project proposal 3
USEC

OSEC Approval of project proposal* 5 

Chief, REAMD / Legal Services Preparation / Review of MOA on project 
implementation 9

LGU/Region/GENCOs Endorsement of MOA for Signature and  20 WD **** 


Notarization by GENCOs and LGU Signing of  required for the 
MOA GENCOs & HC’s

OSEC / USEC / IAS / Financial Services / EPIMB  3 Loc. 221 (Acctg.) 2F, DOE Annex Building


Signing and Notarization of MOA***  Loc. 373 (FS – OD) 2F, DOE Annex Building
/ Legal
Loc. 233 (TD) GF, DOE Annex Building

Chief, Accounting Division /  OD /  Releasing of fund**
DV and OS Preparation 19
Treasury Division
(upon receipt of complete bid docs)

LEGEND REQUIREMENTS CHARGES & FEES


Applicant DOE For Approval of Projects No fees
 Pls refer to Schedules A, B, & C
* For Approval of Projects
 Office of the Secretary (regardless of amount) For approval of project fund transfer LEGAL BASES 45 DAYS
** For approval of project fund transfer  Pls refer to Schedule D
 Bureau Director for projects < 1M Php
 DOE Undersecretary for projects < 5M Php ER 1-94 FUNDS ‐ Sec. 5(i) of  (76 Days)
 DOE Secretary for projects = / > 5M Php DLF – Development and Livelihood Fund RA7638
*** Energy Project: DOE & Distribution Utilities Non-Energy Project: DOE / LGU / RWMHEEF – Reforestation, Watershed Management, Health and/or ‐ Rule 29 Part A of 
Generating Companies (regardless of project cost)
*** MOA signing will be scheduled 3 times a week in a designated room at
Environmental Enhancement Fund the RA9136‐IRR per Project Proposal
Power Bureau. A Memo will be issued to the concerned DOE officials
informing them of the scheduled MOA signing
****60 WD required for NPC‐Mindanao generation of
Agus 1, 2, 4, 5, 6, 7 (Facilities & Resources)
“ANNEX A” “ANNEX B”
ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY
REQUIREMENTS REQUIREMENTS

A. DEVELOPMENT AND LIVELIHOOD FUND: A. REFORESTATION WATERSHED MANAGEMENT HEALTH AND


ENVIRONMENTAL ENHANCEMENT FUND:
TYPE OF PROJECT
Income  TYPE OF PROJECT
DOCUMENTS
Generating
Infrastructure Training***

Reforestation

Management
Water Supply
Livelihood 

Agroforestry

Solid Waste

Equipment)
Equipment

Communal
Structural
Measures

Medical 

Training 
Nursery/

Erosion 
DOCUMENTS

Facility/
Health 
Center/

System
Projects

Toilets

Needs
(IEC 
/
Resolution from the concerned Sanggunian
1 endorsing the project identified during the LGU  ✓ ✓ ✓
consultation
Resolution from the concerned sanggunian
2 Feasibility study for projects* ✓ ✓ ✓ 1 endorsing the project identified during the LGU ✓ ✓ ✓ ✓ ✓ ✓ ✓
3 Sketch/location map of the project ✓ ✓ ✓ consultation

Disbursement schedule, detailed cost estimate, bill 
2 Feasibility Study for projects* ✓ ✓ ✓ ✓ ✓ ✓ ✓
of materials, plans, drawings, specifications, 
4
program of work duly signed by the  ✓ ✓ ✓ Justification of the project to include the following 
Municipal/Provincial Engineer and Mayor/Governor
3 which should be stipulated and/or attached in the ✓ ✓ ✓ ✓ ✓ ✓ ✓
Project
List of cooperative/association members/borrowers 
5 with corresponding amount to be borrowed and  ✓ 3.1
Total areas to be planted & type and

purpose* number of flora species to be planted
Cooperative/association's latest financial statement  List of existing medical and/or health personnel in 
6
(6 mos – 1 yr prior to project application)** ✓ ✓ ✓ 3.2 the area and existing proposed health and/or  ✓
medical related activities
7 Three ‐ Five year projected income statement ✓ 3.3
Certification from local water utility

of the adequacy of water supply
8 Training design ✓ Certification from DOH/local water
3.4
utility for the potability of water

Notarized copy of Deed of Donation/Proof of 
Transfer of Private Property/Transfer Certificate of 
9
Title or equivalent legal documents justifying public  ✓ 3.5 List of existing number of dump/garbage trucks ✓
ownership of lot/site
Certification from the LGU of the
3.6
existing dump site

Sanggunian resolution stipulating date of transfer of 
10
property, existing use of transferred property ✓
3.7 Average daily volume of garbage ✓
Certification of road classification from the 
11
concerned host LGU's engineer's office ✓ 3.8 Target beneficiaries ✓ ✓ ✓ ✓ ✓ ✓ ✓
Certified True Copy of SEC/CDA/DOLE
12
Certificate of Registration** ✓ ✓ ✓ 3.9 Project location sketch map ✓ ✓ ✓ ✓ ✓ ✓
13 Relevant permits from concerned agencies** ✓ ✓ ✓
* as applicable
* as applicable
** for projects with cooperative/association as project implementor
** for projects with cooperative/association as project implementor
*** training as a component of a project or solely training
*** training as a component of a project or solely training
“ANNEX C” “ANNEX D”
ER 1-94 NON-ELECTRIFICATION PROJECTS DOCUMENTARY Check list of Bidding Documents for submission to DOE
REQUIREMENTS
1) Invitation to Apply To Bid/PHILGEPS 
A. REFORESTATION WATERSHED MANAGEMENT HEALTH AND 2) PHILGEPS/Copy of News Clipping with project cost 
ENVIRONMENTAL ENHANCEMENT FUND: of 500 Thousand and above
3) Evaluation Result/Evaluation Report of Bidders/Suppliers
TYPE OF PROJECT ___ 3.a  Pre‐Qualification
___ 3.b Post Qualification

Managemen
Agroforestry
Reforestatio

Solid Waste

Equipment)
4) Instruction to Bidders/Suppliers

Equipment

Communal
Structural
Measures

Medical 

Training 
Nursery/

Erosion 

Facility/
Health 
DOCUMENTS

Center/

Water 
System
Supply

Toilets

Needs
(IEC 
5) Bidder's Bond with specified date

n/

t
6) Performance Bond and Bank Guarantee with specified date
7) Minutes of BAC meeting/ Minutes of Bidding 
Disbursement schedule, detailed cost  containing the Name and signatures of the BAC attendees
estimate/bill of materials/detailed  8) BAC Resolutions duly signed by BAC and the 
3.10 specifications/program of work/plans/ drawing  ✓ ✓ ✓ ✓ ✓ ✓ ✓ concerned LGU Official.
duly signed by the Municipal/Provincial Engineer  9.a Recommending Mode of Procurement 
and Mayor/Governor 9.b Resolution of Award
Cooperative/association's latest 9.c Declaring LCRB and Recommending Approval 
duly approved by the concerned LGU official.
3.11 financial audit (6 mos. to 1 year prior to project  ✓ ✓ ✓ ✓ ✓ ✓
10) Bid Form/Bid Price/Bidded Cost /Detailed Estimated Cost
application)**
10.a Detailed Estimate
Three ‐ Five ‐ year projected income
3.12 10.b Bid Price in the Bill of Quantities
statement
10.c Bid Evaluation Report
SEC/CDA/DOLE Certificate of
3.13
Registration**
✓ ✓ ✓ 10.d Bid Schedule
10.e Cash Flow/Payment Schedule
3.14 Training design ✓ 11) Abstract of Bids signed by BAC
12) Contract Agreement by LGU and winning Bidder
Notarized copy of Deed of Donation/Proof of  13) Notice of Award signed by LGU and winning bidder
Transfer of Private Property/Transfer Certificate  Notice to Proceed duly acknowledge by Contractor indicating actual date of 
3.15
of Title or equivalent legal documents justifying
✓ ✓ ✓ ✓ ✓ ✓ ✓ 14)
receipt
public ownership of lot/site
15) Land Bank Certificate
Municipal Helath Officer/DOH endorsement to 
16) DOE Notice to Proceed
manage the project and Certification that there 
17) MOA among DOE, LGU and Power Plant
3.16 is no existing health center in the  ✓ 18) Sangguniang Resolution proposing and
area/feasibility& standard of 
endorsing the Project 
equipment/facilities
19) Sangguniang Resolution authorizing the concerned Gov't Officials 
Endorsement/Certification from the concerned 
3.17 DENR Office/Watershed Administrator as to the  ✓ re:  to enter and sign all contracts/aggreements concerning ER 1‐94 projects
feasibility of the project
Relevant permits from concerned
3.18
agencies
✓ ✓ ✓ ✓ ✓ ✓ ✓
Note:   

For photocopied documents‐ all copies submitted should bear the full name and signature 
of the person certifying that the same are true, complete, exact, and unaltered copies from 
the orginal document.
*    as applicable
**  for projects with cooperative/association as project  
implementor
***  training as a component of a project or solely training
“Annex E”
ER 1-94 NON-ELECTRIFICATION PROJECTS
SAMPLE FORMAT OF PROJECT PROPOSAL
GRANTING OF FINANCIAL BENEFITS TO HOST COMMUNITIES UNDER ELECTRIFICATION FUND OF
ER 1-94, AS AMENDED

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of project proposal*

Receiving/Verification/ TL: 4792900
Director‐EPIMB/Chief/Supvg. SRS, REAMD Checking of Document 1 Loc. 418 4F, DOE Main Building

Sr. SRS/SRS II‐REAMD Evaluation of COMPLETE  project proposal 5

Chief‐REAMD/Director‐EPIMB/Assistant  Endorsement of project proposal for funding approval 3
Secretary/Undersecretary

Secretary Funding approval of project proposal 5

REAMD/Legal Services (LS) Preparation of Memorandum of Agreement (MOA) on  10
project implementation

Distribution Utility (DU)/ Signing and Notarization of  by DUs and GenCos
Generation Company (GenCo) (20Days)

REAMD/EPIMB/Financial Service(FS)/Assistant  Signing and Notarization of MOA by DOE** 3
Secretary/ Undersecretary/Secretary/LS

REAMD/EPIMB/FS/Assistant  Processing of Disbursement Voucher*** (DV) and 
Secretary/Undersecretary/ releasing of the Initial Fund equivalent to 15% of  15
Secretary/Treasury Division Approved project cost) upon signing of MOA

DU to conduct the Public Bidding and Submit to DOE 
Distribution Utility (DU) the pertinent Bidding Documents (28‐144Days as per 
RA 9184)

Processing of DV*** and releasing of the remaining 
REAMD/EPIMB/FS/Assistant  85% of the project fund (based on the result of  15
Secretary/Undersecretary/ competitive public bidding****) upon receipt of 
Secretary/Treasury Division COMPLETE documents
from DU/Project Implementor

LEGEND ****LIST OF BIDDING DOCUMENTS AS PER DOE‐ACCOUNTING CHARGES & FEES


Applicant 1. Invitation to Apply for Eligibility and to Bid OR Notice of Bidding/ PhilGEPS Invitation to Bid No Fees
DOE 2. Copy of News Clipping with project cost of 500 thousand and above and/or posted in conspicuous place
pursuant to IRR R.A. No. 9184
* PROJECT PROPOSAL
LEGAL BASES 57 DAYS
1. Staking Sheets/Plans/Design / 3. Evaluation Result / Evaluation Report of Bidders/Suppliers
Project Cost Estimate 4. Instruction to Bidders/Suppliers
2. Resolution from LGU 5. Bidder's Bond/Security Bond &Performance Bond
6. Complete copy of Minutes of BAC Meeting / Bidding & Attendance Sheet
** Signatorites on the MOA 
DOE, DU/Project Implimentor and 
7. BAC Resolution for Recommending Mode of Procurement, Resolution of Award, Declaring Lowest Calculated
and Responsive Bid (LCRB) and Recommending Approval
‐ Sec. 5(i) of RA7638
‐ Rule 29 Part A of the (64 Days)
Generation Company RA9136 ‐IRR
8. Bid Form – Detail Estimate, Bid Price in Bill of Quantities, Evaluation Report
***  For approval of project fund transfer 9. Abstract of Bids signed by Bids and Awards Committee
 Bureau Director for projects < 1M Php 10. Contract/ Memorandum of Agreement between Distribution Utility and the winning Public Bidder
 DOE Undersecretary for projects = 1M  11. Notice Award and Notice to Proceed duly Acknowledge by Contractor indicating date of receipt
/ < 5M Php
 DOE Secretary for projects = / > 5M 
Php
AVAILMENT OF SUBSIDY UNDER THE NATIONWIDE INTENSIFICATION OF HOUSEHOLD ELECTRIFICATION (NIHE) PROGRAM

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of project proposal*
TL: 479‐2900
Receiving/Verification/ Loc. 418 4F, DOE Main Building
Director‐EPIMB/Chief/Supvg. SRS, REAMD Checking of Document 1

Sr. SRS/SRSII‐REAMD Evaluation of COMPLETE  project proposal 5

Chief‐REAMD/Director‐EPIMB/Assistant  Endorsement of project proposal for funding approval 3
Secretary/Undersecretary

Secretary Funding approval of project proposal 5

Preparation of Memorandum of Agreement (MOA) on 
REAMD/Legal Services (LS) project implementation 10

Distribution Utility (DU) Signing and Notarization of MOA by DU (10 Days)
REAMD/EPIMB/Financial 
Service(FS)/Assistant Secretary/  Signing and Notarization of MOA by DOE** 3
Undersecretary/Secretary/LS
DU to conduct the Public Bidding and Submit to DOE the 
Distribution Utility (DU) pertinent Bidding Documents (28‐144Days as per RA 9184)

REAMD/EPIMB/FS/Assistant  Processing of Disbursement Voucher*** for the release of 
Project Fund (based on the result of competitive public 
Secretary/Undersecretary/ bidding****) upon receipt of COMPLETE Bidding  15
Documents 
Secretary from Distribution Utility (DU)

Request for Issuance of Letter of Introduction (LOI) from 
FS Bank where DU opened an account  1 Loc. 373 2F, DOE Annex Building

Release of Project Fund to DU’s Bank Account to proceed  1
Treasury Division Project Implementation

LEGEND ****LIST OF BIDDING DOCUMENTS AS PER DOE‐ACCOUNTING CHARGES & FEES


1. Invitation to Apply for Eligibility and to Bid OR Notice of Bidding/ PhilGEPS Invitation to Bid
Applicant 2. Copy of News Clipping with project cost of 500 thousand and above and/or posted in No fees
DOE conspicuous place pursuant to IRR R.A. No. 9184
3. Evaluation Result / Evaluation Report of Bidders/Suppliers
* PROJECT PROPOSAL 4. Instruction to Bidders/Suppliers LEGAL BASES
44 DAYS
1. Project Briefer from DU 5. Bidder's Bond/Security Bond &Performance Bond
2. Resolution from LGU on the list of eligible potential  6. Complete copy of Minutes of BAC Meeting / Bidding & Attendance Sheet
households 7. BAC Resolution for Recommending Mode of Procurement, Resolution of Award, Declaring - Sec. 5(i) of RA7638
** Signatorites on the MOA  Lowest Calculated and Responsive Bid (LCRB) and Recommending Approval - Rule 29 Part A of the
DOE, Distribution Utility (DU) 8. Bid Form – Detail Estimate, Bid Price in Bill of Quantities, Evaluation Report
9. Abstract of Bids signed by Bids and Awards Committee
RA9136 -IRR
(51 Days)
***  For approval of project fund transfer 10. Contract/ Memorandum of Agreement between Distribution Utility and the winning Public
 Bureau Director for projects < 1M Php Bidder
 DOE Undersecretary for projects = 1M / < 5M Php 11. Notice Award and Notice to Proceed duly Acknowledge by Contractor indicating date of receipt
 DOE Secretary for projects = / > 5M Php
QUALIFIED THIRD PARTY APPLICATIONS FOR ENDORSEMENT TO ERC

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of complete set of 
requirements

TL: 4792900
1 Loc. 417 4F, DOE Main Building
Science Research Specialist, REAMD  Checking of submitted documents

No
Complete?
Yes

Request evaluation / assessment from concerned  1
Office of the Director, EPIMB bureau/s and institution/s Loc. 414 4F, DOE Main Building

Legal Services, Internal Audit Services, Legal, Financial, and Technical Evaluation of the Project Loc. 403 (LS) ERL Building 3


Loc. 271 (IAS) 3F, DOE Annex Building
REAMD ‐ EPIMB
40
No
Acceptable?
Yes
Office of the Director, EPIMB Review of Evaluation Report 5

Issuance of recommendation to NPC for signing of QTP  1
Office of the Director, EPIMB Subsidy and Service Contract

NPC 30

Office of the Director, EPIMB Review and Endorsement of Project for Assistant 
Secretary/ Undersecretary’s approval 5

Assistant Secretary Recommendation of the Endorsement to the Secretary for 
Undersecretary Signature 1‐3

Secretary 1
Signing of Endorsement

Science Research Specialist, REAMD Recording and Release of Endorsement 1/2

LEGEND REQUIREMENTS CHARGES & FEES LEGAL BASES


Applicant As prescribed under DOE Circulars No. 2004‐06‐006 and 2005‐ No fees EPIRA IRR Rule 14
DOE Circular No. 2004‐06‐006
DOE 12‐011 (See details in “Annex F”)
DOE Circular No. 2005‐12‐011 57.5 DAYS
“ANNEX F”

As prescribed under DOE Circulars No. 2004-06-006 and No. 2005-12-011

General

Official Letter of Intent

Profile of Company or Organization

Relevant registration from Securities and Exchange Commission, Department of Trade and Industry, NEA or
Cooperative Development Authority

Technical Requirements

Full details of the technical skills and experience of the key management team responsible for the operation of
the system. These details should include relevant technical and business management qualifications as well as
full descriptions of experience relevant to the technical and commercial operation of electric power generation
and supply systems.

Details of the proposed arrangements for the acquisition, training and contracting of the necessary expertise that
the applicant does not possess at the time of application.

Details of how the applicant proposes to design, construct, operate, and maintain the generation and associated
distribution system to be used in its operations, including its proposed plans for dealing with major operating
contingencies such as a failure of its generating plant or a major fault on its distribution system.

Details of the procedures that the applicant proposes to put in place for the billing to and collection of payment
from customers and maintain accounting records of its commercial operations. An undertaking that the applicant
will allow DOE and/or ERC to open its accounting records relating to its operations, when necessary.

A statement certifying that the applicant intends to design, construct, operate and maintain its generation and
distribution systems in full compliance with the relevant requirements prescribed under the applicable laws
including EPIRA and its attendant rules and regulations.

Other information as may be requested by DOE to demonstrate technical capacity.

Financial Requirements

Evidence of the total net assets of the organization.

A letter of credit or letter of intent to invest from a bank or another organization provided that the DOE is satisfied
that the other party has adequate financial capacity and indeed has the intent to invest or provide credit.

The most recent annual report or financial accounts of the applicant duly certified as correct by a registered
auditor or accountant.

Proof of adequate insurance coverage and compliance with all Philippine labor laws.

Good Standing

Proof of Good Standing


APPLICATIONS FOR PV MAINSTREAMING PROGRAM UNDER
ELECTRIFICATION FUND OF ER1-94, AS AMENDED

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of complete set of 
Project Proposal*

TL: 4792900
Office of the Director/ Chief/ Supvg. SRS,  1 Loc. 414 / 417 4F, DOE Main Building
REAMD Receiving/Verification/ Checking of Documents

Sr. SRS/ SRS II, REAMD Evaluation of COMPLETE Project Proposal 5

Chief, REAMD/ Director/ Asst . Secretary/  Endorsement of Project Proposal for funding approval 5


Undersecretary

Secretary 10
Funding Approval of Project Proposal

Preparation of Memorandum of Agreement (MOA) on  10
REAMD/Legal Services (LS) Project Implementation

REAMD/EPIMB/Financial Service(FS)/Asst Signing of MOA** 3
Secretary/ Undersecrdetary/ LS

Processing of Disbursement Voucher*** (DV) and 
REAMD/EPIMB/FS/Asst Secretary/  releasing of the Initial Fund equivalent to 15% of  15
Undersecrdetary/ Secretary/ Treasury Division Approved project cost) upon signing of MOA

REAMD/EPIMB/FS/Asst Secretary/  Processing of DV*** and releasing of the remaining  15


Undersecrdetary/ Secretary/ Treasury Division 85% of the project fund (based on the result of 
competitive public bidding****) upon receipt of 
COMPLETE documents

LEGEND LIST OF THE REQUIREMENTS CHARGES & FEES


Applicant DOE PROJECT PROPOSAL
No fees
* PROJECT PROPOSAL 1. Board Resolution  adaption of PVM 
1. Board Resolution  adaption of PVM  2. Complete List of Beneficiaries as result of Household Survey LEGAL BASES
2. Complete List of Beneficiaries as result of Hhold Survey 3. Business Plan
3. Business Plan
4. Project Implementation Plan
5. Signed Policy Manual with corresponding Board Resolution
4.
5.
6.
Project Implementation Plan
Signed Policy Manual with corresponding Board Resolution
Proposed Monthly Tariff ER 1‐94, as 
64 DAYS
6. Proposed Monthly Tariff amended/
**MOA Signatories ****Refer to “Annex D” EPIRA‐IRR 
1. DOE
2. DU/Project Implementor Generation Company
***DV SIGNATORY
1. EPIMB Director <1M Php
2. DOE Undersecretary = 1M / <5M Php
3. DOE Secretary = / > 5M Php
Matrix of Changes of Processing of
PV Mainstreaming Program ELECTRIFICATION FUND OF
ER1-94, AS AMENDED

First submission Second Submission Reason for Changes

“Preparation of OS and DV upon receipt  Amended to “Processing of Disbursement  Providing the details of the process 


of COMPLETE documents” Voucher (DV) and releasing of the Initial  considering up to 10‐15 days as 
Fund equivalent to 15% of Approved  harmonized to the process under ER1‐94
project cost) upon signing of MOA”

“Release of Funds for Project  Amended to “Processing of DV and  Providing the details of the process 


Implementation (Based on the result of  releasing of the remaining 85% of the  considering up to 10‐15 days as 
competitive public bidding)” project fund (based on the result of  harmonized to the process under ER1‐94
competitive public bidding) upon receipt 
of COMPLETE documents”
1ST ENDORSEMENT TO THE SECURITIES AND EXCHANGE COMMISSION (SEC)

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of application with 
complete supporting documents

TL:  4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD Evaluation of  application 0.5

SRS II, PPDD
Preparation of  SEC  1st endorsement 

0.5

Chief SRS, PPDD
Review/Endorsement 

Loc. 414 4F, DOE Main Building
Director, EPIMB Approval/Signing  1

Payment of Processing Fee 

0.5

Clerk, PPDD
Release of  1st endorsement  

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES


Applicant 1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power  Php 500.00 SEC Requirements for 
and EPIMB Director (parallel submission to DOE Records Division and EPIMB‐PPDD); Primary Registration for 
DOE 2. SEC prescribed Cover Sheet;  
Corporation & Partnerships 
3. Draft Articles of Incorporation (AOI) or  Articles of  Limited Partnership of the Company; and 
4. By‐Laws of the Company 2.5 DAYS
For Amendment of AOI or  Articles of  Limited Partnership of the Company
1. Draft AOI  or Articles of  Limited Partnership of the Company; and 
2. Directors’ Certificate
CLEARANCE TO UNDERTAKE SYSTEM IMPACT STUDY (SIS) ENDORSEMENT TO
THE NATIONAL GRID CORPORATION OF THE PHILIPPINES (NGCP)

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of application  
with  complete  supporting documents

TL:  4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD Evaluation of  application 0.5

For Renewable Energy (RE) Projects 

REMB endorsement  2  

SRS II, PPDD
Preparation of  SIS endorsement 

0.5

Chief SRS, PPDD
Review/Endorsement

Director, EPIMB Signing of SIS endorsement 1 Loc. 414 4F, DOE Main Building

Clerk, PPDD Release of  SIS  0.5


endorsement  to Applicant and NGCP

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES


Applicant
1. Letter of Request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB No Fees Internal arrangement
DOE Director (parallel submission to DOE Records Division and EPIMB-PPDD) between DOE & NGCP
2. Company Profile 2.5 DAYS (Non-RE)
3. Project Background/Description to include the following: exact location, official name of the power-
generating facility, commissioning date, off-taker of the electricity, etc.)
Additional for Renewable Energy Power Projects: 4.5 DAYS (RE)
4. Copy of the Service Contract
5. Copy of Certificate of Registration of Proponent as RE developer
ENDORSEMENT OF CERTIFICATE OF NON-OVERLAP (CNO) & CERTIFICATION PRECONDITION (CP) TO THE NATIONAL COMMISSION ON
INDIGENOUS PEOPLES (NCIP)

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of application with 
complete  supporting documents

TL: 4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD Evaluation of  application 0.5

SRS II, PPDD
Preparation of  letter of endorsement

0.5

Chief SRS, PPDD Review and initial on the letter 
of endorsement 

Director, EPIMB Signing of letter of endorsement 1 Loc. 414 4F, DOE Main Building

Clerk, PPDD Release of  letter of endorsement  0.5


to Applicant 

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES


1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power 
Applicant No Fees NCIP Administrative Order 
and EPIMB Director (parallel submission to  DOE Records Division and EPIMB‐PPDD); 
No.1, Series of 2006 
DOE 2. Letter of request addressed to NCIP; 
3. Company Profile; 2.5 DAYS
4. Project Background; and 
5. Vicinity Map
CERTIFICATION TO THE PHILIPPINE NATIONAL POLICE (PNP) AS A REQUIREMENT FOR THE ISSUANCE OF THE LICENSE TO POSSESS
EXPLOSIVES/EXPLOSIVE INGREDIENTS/CONTROLLED CHEMICALS AS PURCHASER

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of application with 
complete  supporting  documents

TL: 4792900
Loc. 202 4F, DOE Main Building
SRS II, PPDD
Evaluation of  application 0.5

SRS II, PPDD
Preparation of  Certification to PNP

0.5

Chief SRS, PPDD
Review and initial on the 
Certification to PNP

Director, EPIMB Loc. 414 4F, DOE Main Building


Signing of Certification to PNP
1

Clerk, PPDD
Release to Applicant of Certification to PNP
0.5

LEGEND LIST OF REQUIREMENTS CHARGES & FEES


1. Letter of request addressed to the DOE Secretary, Attention to the Undersecretary for Power and EPIMB Director (parallel submission to DOE Records Division No Fees
Applicant and EPIMB‐PPDD) indicating the specific purpose to purchase/possession the explosives/explosive ingredients/ controlled chemicals and the detailed
information on the name of chemicals/explosive ingredients/explosives, quantities, etc., which will be used in the power generation;
DOE 2. Letter of request addressed to the PNP Chief, Attention to the Chief of Firearms and Explosives Office for the issuance of license to possess
explosives/explosive ingredients/controlled chemicals as a PURCHASER including the information on the tentative date of delivery, quantity for delivery and
LEGAL BASES
the name of chemicals;
3. Accomplished Form from PNP Explosives Management Division for the Request to Possess/Purchase Explosives/Explosive Ingredients/Controlled Chemicals;
4. Copy of DOE Certificate of Endorsement to the Energy Regulatory Commission for the issuance of the Certificate of Compliance;
PNP‐Explosives Management 
Division Requirements for 
2.5 DAYS
5. If the company is the winning bidder of NPC‐PSALM’s assets for privatization, the company must submit copy of any notarized pertinent documents related to Issuance of License to Possess 
the transfers of assets from NPC – PSALM to the winning bidder such as Asset Purchase Agreement (APA), Land Lease Agreement (LLA) Amendment, Explosives/Explosive 
Accession and Assumption Agreement (AAAA), Deed of Absolute Sales (DOAS), etc; and Ingredients/Controlled 
6. Proof of Registration of the requesting company and the name of the resource facility registered in the Wholesale Electricity Spot Market Chemicals 
APPLICATION FOR DIRECT CONNECTION

RESPONSIBLE PERSONNEL/ PROCEDURES NORMAL PROCESSING TIME CONTACT  LOCATION OF 


OFFICE / UNIT (WORKING DAYS) NUMBERS OFFICE

Submission of written 
application with complete 
requirements

Payment of processing fee

Direct Connection Review and Evaluation 
Committee (DREC) – Chairperson  Referring the application
(Undersecretary for Power)
2
TL: 4792900
Loc. 387 4F, DOE Main Building
DREC Secretariat, PMDD Checking of submitted requirements

No 3
Complete?
Yes

Conduct of consultation, group 
DREC TWG discussion, validation and/or ocular  45
inspection, evaluation and 
recommendation

DREC TWG Endorsement to DREC

Endorsement to the Secretary of  15
DREC DREC’s Approval/ Disapproval

Secretary Approval of DREC’s Endorsement

LEGEND LIST OF REQUIREMENTS CHARGES & FEES LEGAL BASES


1. Letter of Application addressed to DOE Secretary, Attention Undersecretary  for Power, D‐REC 
Chairperson (subject to approval by the ‐ Supreme Court Decision (G.R. 
Applicant 2. Corporate/ Business Profile DOE Committee on Fees No.172960)
3. Location of Installation, plant or factory which direct supply is sought, including the nearest NGCP/  and Charges) ‐ House Rules  Governing the 
DOE Distribution Utility substation PhP3, 052.00
4. Delivery Voltage
5. Requested Schedule for connection
Review and   Evaluation Of Direct 
Connection Applications of 
Industrial, Commercial and Other 
65 DAYS
6. Load Demand for the past 12months Qualified Electricity End‐ Users, 
7. Certification from NGCP Economic Zones and Ecozone
8. Cost Benefit Analysis Enterprises
9. Information on Intent and/or Arrangement for a PSA ‐ Electric Power Industry Reform 
10. Certificate of Contestability Act (R.A. No.   9136)
11. Other relevant technical information/documents that may support the application

Das könnte Ihnen auch gefallen