Date : --------------------- Checklist No.

:-----------
Project : Modular Skid For Saudi Aramco
Company :Oil and Gas Equipment Industries

INSPECTION REPORT FOR S.S. TUBING OF TRANSMITTERS, ETC.

Plant No. Inspection Date


Observation No.

Area/Location No. Inspection Time

Descriptions Def. Remarks


Found

Ensure the material as per the specification

Check S.S. lines are constructed with the slop as per the hook
up

Ensure upstream / downstream lines are connected properly


with the transmitter

Check S.S. tube is supported and clamped properly

Ensure smooth bending and free flow of fluid

Ensure all fittings are tightened with ferrules

Check for usage of approved sealing compound

OSC Inspector SA Inspector

Name

Signature