Sie sind auf Seite 1von 1

WEEK 7 REPORT (18-06-2018 to 23-06-2018)

18-06-2018 to 23-06-2018
I was asked to maintain the log book regarding the dispatch of finished
products. The details that I had to record were the vehicle details, dealer to whom
it is delivered, total weight of the product loaded, the composition of different
varieties of the product loaded and the outward carrier expense for the vehicle.

Das könnte Ihnen auch gefallen