ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND

OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Primary Electric Equipment

to. Capacitor Bank.


b. Circuit breaker.
c. Disconnectors.
d. Apartarayos

7. Technical Standards for Design, Construction, Testing and Commissioning of stations converter and
transformer substations

The Contractor shall design, construct, test and commission the converter stations and transformer substations
according to the technical specifications of CFE indicated in the table below, and in unspecified, following good
engineering practices of generally accepted in the electrical industry and construction. He

Contractor shall also consider he document: RATIO


CFE OFFICIAL SPECIFICATIONS APPLICABLE TO PROJECTS CPTT substations.

Table 1. Technical Regulations and converter stations Substations


Transformation.
Item Specification / Procedure
Transmission Substation Design CFE specification DCDSET01
Transmission Substation Construction
CFE specification DCCSET01

Geotechnical Studies Detailed Engineering in


Specification CPTT DEC EGD-1
Electrical Substations
Specification for Electrical Substation Surveying
Specification CPTT-DSS-002/12

Specification for platform design and interior roads


DEC PCI specification CFE CPTT 01
Electrical Substations

Foundation design for Electrical Substations


Specification CPTT DEC CIM-1

Stand for Diesel Generating Plant Specification Type CFE CPTT DEC CgD-
01
Polymer covers Trenches Stratified for Electrical
Specification CPTT-TTP-1
Substations
General Environmental Specifications for the Design,
Construction and Commissioning of Electrical Substations REV 03 January / 2016

Signal Distribution System Power Control and


Alarms for

Page 169 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


Replacing a Single Phase Autotransformer Transformer or
by the booking stage without disconnection - Signal
Connection

Technical specifications for boards CAY services of


CPTT specification SDLS-02/89
CC
centralizers cabinets potential and current signals
September 2012.

Technical Documents relationship that make up


the Standard Wiring Substation Rev September 2000

Preoperative tests Transmission and Distribution


Substations. Scopes contractor REV 0 SEPTEMBER 2005

Procedure for testing contact resistance


Procedure GGT-027 REV 2002

Procedure for Reception and Commissioning of Power


Procedure GGT-A013-S
Transformers
Test Procedures to nozzles Procedure GGT-A023-S
Test Procedure ohmic resistance to Primary
Procedure PT-SLA-09-19
Equipment
Procedure for Testing Insulation Resistance Electrical
Procedure SGP-A001-S
Equipment "Megger"
Test procedure and time synchronism operation
Procedure SGP-A002-S
Switches
Procedure for testing Power Factor insulation Electrical
Procedure SGP-A003-S
Equipment
Testing Procedure excitation current Power
Transformers "Double" Procedure SGP-A004-S

Procedure for Residual moisture determination in solid


insulation of power transformers Procedure SGP-A005-S

Field testing procedure of insulating oils


Procedure SGP-A009-S

Test Procedure transformation ratio with Team "Ttr"


Procedure SGP-A011-S

Preoperative testing procedure for Reception and


Commissioning of protection schemes, Measurement,
Procedure P-PSS-PT-01
Control and Supervision

Operational testing procedure for Reception and


Commissioning of protection schemes, Measurement,
Procedure P-PSS-PT-02
Control and Supervision

Test Procedure Pre-Operational and Operational


P-IPS-CT-01
"SICLE"

Page 170 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


Test Procedure Pre-Operational and Operational
P-IPS-CT-02
"SIME"
Preoperative procedure and test operations
Communication System "OPLAT" P-IPS-CM-10

Preoperative procedure and operational testing of


Microwave Communications System and UHF P-IPS-CM-11

Preoperative procedure and testing Operating System


Optical Fiber Communication P-IPS-CM-12

Test Procedure Preoperative and Operating System


P-IPS-CM-13
Teleprotection
Test Procedure Preoperative and Operative Telephone
Switching System P-IPS-CM-14

Preoperative procedure and operational testing VHF


Radio System and Trunked P-IPS-CM-15

Preoperative procedure and operational testing of


Administration and Management System P-IPS-CM-16

Quality assurance requirements for contractors Turnkey


Specification CFE-L0000-40
Projects
Guidelines for Preparation of Environmental Management
System applicable to the construction phase of transmission
Review: August 3, 2012
lines and electrical substations

Manual and Safety Requirements


Industrial hygiene Works in Progress Rev Sep 2000
General guidelines and specifications Integrated Physical
Security Systems for Substations SPECIFICATION CPTT-SISF01

Primary identification signs Equipment in Power


CPTT specification Die-01/07
Substations
Specifications for soil resistivity measurement for Electrical
Rev Aug 2013
Substations
General specifications relating to the protection of the
archaeological, artistic and historical heritage, during the
Rev Jan 2016
design, construction and
commissioning of Electrical Substation
Complements the features set forth in the
General features Boards Protection, Control and
specification CFE V670062
Measurement

List of approved protection systems LSPA No. 84/2016


Guide for the preparation of engineering for
Substation Automation Systems Revision 05 Dec / 2005

Page 171 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


Guidelines for the Development of architectural diagrams
for Substation Automation Systems review December 4, 2015

Guide for development of logic diagrams for substation


automation systems part 1, 2, 3-1-1 and 3-2-1

Installation Guide dielectric optical fiber cable

General characteristics of equipment and software for


comprehensive energy measurement system Revision 0 December 2011

General characteristics applicable to substation


IEC 61850: review 11 August 2014
automation systems (SAS)

Rush distribution circuits and substations arrangements


own services for power substations Furniture Stores goods
substations and transmission lines

Review: September 1, 2016

Part 1 Introduction and General Requirements

Part 2-1 Requirements Components -


General Requirements

Part 2-2 Requirements Components -


Protection Relays

2-3-1 Part Component Requirements -


Gateway - General Requirements Part 2-3-2
Component Requirements - Gateway - Part
2-3-3 Transmission Substations Component
Requirements - Gateway - Distribution
SUBSTATION AUTOMATION Substation part 2- 4 Requirements
Components - Bay Controllers

Part 2-5 Requirements Components -


Interface Man - Machine

Part 2-6 Component Requirements - Input and


Output Modules

Part 2-7 Requirements Components -


Converters

Page 172 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


Contact Part 2-8 Requirements Fiber Optic
Components - Satellite Clock Part 2-9
Requirements Components - Part 2-10 LAN
Switch Requirements Components - Network
Security Equipment Part 2-11 Requirements
Components - Equipment for Backup Supply
voltage Requirements Part 3-1 Communication
Networks - General Requirements Part 3-2
Communication Networks - Networks for data
acquisition Requirements Part 3-3
Communication Networks - Networks for Power
Protection electrical Testing Part 4 Part 5-1
Specific Applications - Transmission Substations
Part 5-1-100 Specific Applications -
Transmission Substations - Tripping by Control
Cable Part 5-1-200 Specific Applications -
Transmission Substations - ShotSwitches with
Input and Output Modules Part 5-1-300 Specific
Applications - Transmission Substations -
Tripping by Fiber Optics Converters Contact to
Part 5-2 Specific Applications - Distribution
Substations Part 6 standard nomenclature for
Devices

8. Technical Standards for Design, Construction, Testing and Commissioning for Line Direct Current

The Contractor shall design, construct, test and commission the HVDC line according to the applicable regulations
of CFE indicated in the following table, and what not

Page 173 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

specified, following good engineering practices, generally accepted in the electrical industry and construction:

Table 2. Technical Standards Line Direct Current.


Item Specification / Procedure
Specification CPTT-DDLT01 / 16: "Transmission Line
Design, construction, testing and commissioning
Design Air direct current"
of the HVDC line

• "General environmental specifications for the


design, construction and commissioning of
transmission lines"
• "Guidelines for preparation of environmental
Environmental aspects
management system applicable to the construction
phase of transmission lines and electrical
substations": Review: August 3, 2012

• "Specification for Surveying transmission lines".

Specification CPTT-DSS-001/05
• You can also use the LiDAR (Light Detection and
Topographical surveys Ranging or Laser Detection and Ranging Im aging),
according to the "Specifications for Topographic
Surveying CFE transmission lines with Airborne LiDAR
Technology"

Geotechnical Studies and Soil Mechanics "Geotechnical studies for transmission line structures":
CFE Specification C0000-43

"Networks Ground Structures Air Lines 69 kV


Apparent Resistivity measurements Land Transmission 400 kV under construction": Specification
CFE-00J00-52

"Design of overhead transmission lines in Direct


Current": Specification CPTT DDLT-01/16
CLARIFICATION No. 04 "Geotechnical studies, analysis
and design of foundations for transmission lines" and
Structural analysis and design of foundations CLARIFICATION No. 01: "Geotechnical Studies in the
preliminary stage for transmission line structures ",
Cement according to Standard NMX-C414-ONNCCE

Grounding Network "Network Grounding structures of overhead transmission


lines of 69 kV to 400 kV under construction": Specification
CFE 00J00-52

Page 174 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


structures Specification CPTT-DDLT01 / 16: "Design of overhead
transmission lines in Direct Current"

Optical fiber cables for poles "Cable concentric aluminum wiring and core steel wires
coated brazed aluminum (ACSR / AS): CFE E100018"

Guarda cables "Wire and Cable coated steel welded aluminum (AAS)":
CFE A1000-01; and specification CFE E0000-22 "Cables
Guard".

• "Hardware and Hardware sets of overhead


transmission lines with voltages of 69 kV to 400
kV A": Specification CFE 2C301-15

• International Standard IEC 61284 "Overhead Lines-


Hardware
requirement is possible and Test for Fittings".
• "Hardware, Hardware sets and accessories
Guard Cable with Optical Fibers" CFE E110021

• "NMX-I-274-NYCE" Telecommunications - Cables -


Optical fiber cables for outdoor use - specifications
and test methods ",

Cable with integrated fiber optics


• IEC 60794-1-2 "Optical Fiber Cables - Part. 1-2:
Generic Specification - Cross Reference Table For
Optical Cable Test Procedures, Edition 3.0, 2013-09 ".

International Standard IEC 61325 Ed 1.0 b.:


1995, "Insulators for Overhead Lines with a Nominal
Voltage above 1000 V - Ceramic or Glass Insulator
insulators
Units for DC Systems Definitions, Test Methods and
Acceptance Criteria."

• International Standard IEC 61897 Overhead Lines -


Requirements and tests for Stockbridge type Vibration
Dampers Aeolian.

Shock absorbers, Polos and guard cable • International Standard IEC 61854, "Overhead Lines -
Requirements and test for Spacers".
• "Vibration dampers for overhead transmission lines
with operating voltages of 69 kV to 400 kV" CFE
511B1-36 specification.

• "Standard Specification for Concentric-LayStranded


Metallic Earth return
aluminum conductors, aluminum-

Page 175 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


clad steel reinforced ": ASTM B549 Especifición

• "Conductors - Aluminum Cable wiring and concentric


steel core (ACSR) - Specifications".
NMX-J058-ANCE-2007

• "Cable concentric aluminum wiring and core steel wires


coated brazed aluminum (ACSR / AS)". CFE E100018
Specification:

• International ASTM B549 "Standard Specification for


Concentric-Lay-Stranded aluminum conductors,
aluminum-clad steel reinforced"

Earth electrode
• "Conductors - Aluminum Cable with concentric wiring
and steel core (ACSR) - Specifications".
NMX-J058-ANCE-2007

Ground electrode structures • "Torres for transmission and subtransmission


lines." CFE specification J1000-50

• "Metal poles for transmission and


subtransmission lines." CFE specification
J6100-54
• "Wooden Poles". CFE specification J6200-01

• "Reinforced concrete poles Section I". CFE


specification J6301-53
Earth rod Earth Electrode "Electrodes for improving systems grounding resistance
greater than 10 Ω Malla": Specification CFE-5610002

"Electrodes Earth": Specification CFE 56100-16

Wire and cable copper coated steel welded to "Wire and cable coated steel welded Copper (ACS) or
the ground electrode Coating
Electrolytic ": Specification CFE-E0000_33
"Exothermic welding connections for system grounding
lines, electrical substations and underground networks
Exothermic welding connections for ground
Distribution and Transmission": Specification CFE
electrode
DY70026

Previous Energizing Physical Specification for construction of overhead transmission


inspection lines: CFE DCCLTA01
• IEC PAS 61975 "Systems Test for Highvoltage
Energizing pre-tests
Direct Current (HVDC)

Page 176 from 411


ANNEX 3 OF THE TENDER FOR THE AWARD OF CONTRACT MANAGEMENT AND
OPERATION OF TRANSMISSION INFRASTRUCTURE FOR INTERONEXIÓN between the National Interconnected System (SIN)
and electrical system BAJA CALIFORNIA (BC)

Item Specification / Procedure


Installations "
• IEEE 1378 "Guide for the comissioning High
Voltage Direct-Current-(HVDC) Converter Stations
and Associated Transmission Systems" in its
latest editions.