The mission of Infinite Consulting Corp (ICC) is to safely build tomorrow's building and
infrastructure projects by providing the highest level of construction, safety, and quality
management services. ICC promotes a culture of safety and education as part of these
overarching goals. ICC is committed to creating opportunities for continuing education to our
employees to ensure the highest level of value added services to our clients and society.
I nfinite P ossibilities.
Infinite Consulting Corp Capabilities Statement
Certifications:
Certified MBE/DBE/SBE
CLIENT The Enhanced Station Initiative (ESI) improves the reliability, capacity and
ECCO III customer experience inside the subway system. Stations will be
temporarily closed during the project in order to complete the repairs
PROJECT VALUE
$111 Million and enhancements as quickly as possible. The enhancements planned for
the stations also include:
COMPLETION
End of 2018 • Improved signage for easier navigation, including digital, real-time
SERVICES PROVIDED
train arrival information at subway entrances;
Safety Management • Glass and wire mesh platform windscreens to protect riders from
Quality Management the elements;
CPM Scheduling
• New security cameras and railings for improved safety;
REFERENCE • New glass barriers and LED lighting throughout for increased light
Gerard D'Ambrosio and transparency; and
Project Manager
• New artwork, and durable granite flooring.
201 Saw Mill River Road
Yonkers, NY 10701
gdambrosio@eccoiii.com
917-807-6102
MTA New York City Transit -
Rehab of the East 180th Street
Station White Plains Road Line
(IRT), Bronx
New York, NY
OWNER
MTA NYCT
The 180th Street Station involved the historic restoration of the
administration building and the renovation of an above ground station,
CLIENT new RTO building exterior above tracks, nstallation of two elevators for
SAI Services, Inc. ADA compliance, electrical power upgrade, signal modification as well as
PROJECT VALUE installation of four track edges, replacement of tracks, platform sections
$44,932,468.00 and platform canopies. The station remained fully operational
COMPLETION
throughout the entire construction.
2013
Infinite Consulting Corp provided Safety Management Services by
SERVICES PROVIDED
Safety Management
dispatching Construction Safety Engineers on the project.
REFERENCE
SAI Services, Inc.
265 US Hwy 46 Suite 3B
Totowa, NJ 07512-1812
E-mail: office@saiserviceinc.com
Tel: 973-837-8400
Fax: 973-837-8402
MTA New York City Transit -
Dyckman St and Broadway
Station Tunnel Lighting
New York, NY
COMPLETION
Infinite Consulting Corp was responsible for the Quality Management and
2017 Oversight on the project. Infinite staffed the project with a full-time
quality manager, ensuring the contractor’s quality control program and
SERVICES PROVIDED
the design standards and specifications were met during construction. To
Quality Management
date, the Infinite Quality Management team has received several perfect
REFERENCE scores during the quarterly examination and review performed by the
Alex Pulla
MTA.
Project Manager
apulla@smallselectrical.com
646-319-7883
MTA Long Island Rail Road -
Double Track from Farmingdale
to Ronkonkoma
The Double Track Project will improve service and reliability on the LIRR’s
OWNER
Metropolitan Transportation Ronkonkoma Branch, spur economic activity, provide hundreds of
Authority (MTA) Long Island Rail construction jobs and improve LIRR service to Long Island MacArthur
Road (LIRR) Airport. Ridership on the LIRR’s Ronkonkoma Branch has doubled over
CLIENT the last 25 years, growing in popularity since the line was electrified in
LK Comstock/RailWorks 1988. With only one track along the 18-mile stretch between
Ronkonkoma and Farmingdale, there is very little flexibility in the event
PROJECT VALUE
$387.2 Million of a service disruption. If one train becomes disabled, all other trains
(east and west) have no way around the problem. This project will
COMPLETION
construction an uninterrupted second track between Farmingdale and
End of 2018
Ronkonkoma.
SERVICES PROVIDED
Site Safety Management
The Double Track Project will result in increased train service to
REFERENCE employment centers on Long Island and in New York City, train service
Michael Balzano every 30 minutes to Ronkonkoma, improved train service to and from
Project Manager
Long Island MacArthur Airport, improved train service between Queens,
mbalzano@railworks.com
917-596-0072 Nassau, and Suffolk, new residential and commercial development
around existing LIRR stations, and paves the way for a possible reopening
of Republic Station to serve busy Route 110.
REFERENCE
Mark DeBois
Lead Estimator/Project Engineer
MDebois@MassElec.com
201-571-2728
MTA Long Island Rail Road –
DPM Office Fit-Out at LIRR's
Hillside Support Facility
Hollis, Queens, NY
PROJECT VALUE
$2.51 Million
COMPLETION
2017
SERVICES PROVIDED
Safety Management
CPM Scheduling
REFERENCE
Marko Bistakis
Owner, All-Con Contracting