Sie sind auf Seite 1von 6

Step 1.

FGD Battery Charger ( Left Panel )

1-1 AC Input Power Breaker ON ( CB1 )

1-2 When Normal Input Voltage ( In touch screen Monitor AC Input )

Battery Line Breaker ON ( CB2 )

1-1 AC Input Power


Breaker ON
( CB1 )

1-2 When Normal Input


Voltage ( In touch screen
Monitor AC Input )

Battery Line Breaker ON


( CB2 )
1-2 When Normal Input
Voltage ( In touch screen
Monitor AC Input )

Battery Line Breaker ON


( CB2 )

1-3 Next DC Output ( UPS ) Breaker ON ( CB3 )

1-4 Next DC Output ( DC DB ) Breaker ON ( CB4 )

1-4 Next DC Output ( DC DB )


Breaker ON ( CB4 )
1-3 Next DC Output ( UPS )
Breaker ON ( CB3 )
1-5 Check Operating Status ( SYS. NORMAL Message in Touch Screen Monitor )

1-3 Check Operating Status ( SYS. NORMAL Message )

Step 2. AVR System ( Right Panel )

1-1 AC Input Power Breaker ON ( CB1 )

1-2 AC Output Breaker ON ( CB2 )

1-1 AC Input Power


Breaker ON ( CB1 )
1-2 AC Output Breaker ON ( CB2 )

1-3 Check Operating Status ( Indicator Lamp and Input / Output Voltage )
1-3 Check Operating Status ( Indicator Lamp and Input /
Output Voltage )

Step 3. UPS System ( Middle Panel )

1-1 Check Manual Transfer S/W Position ( Normal UPS<I> Position )


1-2 When AVR System Normal. UPS Panel Touch Screen will be Running Automatic.

1-3 Press DC CAPACITY Charge Push Button 5 Seconds before DC Input Breaker ON.

And DC Input Breaker ON ( CB1 )

1-3 Press DC CAPACITY Charge


Push Button 5 Seconds
before DC Input Breaker ON.

1-3 And DC Input Breaker ON ( CB1 )

1-4 Check Inverter Normal Status ( If Inverter is not running. Required Inverter Manual Starting )

1-5 Next AC Output ( AC DB ) Breaker ON ( CB2 )

1-6 Next BYPASS Breaker ON ( CB3 )


1-5 Next AC Output ( AC DB ) 1-6 Next BYPASS Breaker ON
Breaker ON ( CB2 ) ( CB3 )

1-7 Check Operating Status ( SYS. NORMAL Message )

1-7 Check Operating Status ( SYS. NORMAL Message )

- END

Das könnte Ihnen auch gefallen