1 21-Jul-18 Is
DISTRIBUTION ORDER
XXXXX XXXXX
A Project Manager A Project Manager A Project Manager
A
A Engineering Manager A
A Engineering Manager A
A Asst. Engineering M
A A A
A Procurement Manager A Project Control Manager A Asst. Construction &
A
A Construction Manager A
A Process Lead Engineer A
A Asst. Project Contro
A
A QA/QC Manager A
A Civil Lead Engineer A
A Asst. Start Up Mana
A
A HSE Manager A
A Mechanical Lead Engineer A
A Chief Logistic
A
A Adm & Finance Manager A
A Piping Lead Engineer A
A Chief HSE
CONSORTIUMAPT TWINK INDONESIA AND PTAPERFECT CIRCLE ENGINEERING A
A A A
A A A
A A A
A
A Project Control Manager A
A Electrical Lead Engineer A
A Process Lead Engin
X
A
A Process Lead Engineer A
A Instrument Lead Engineer A
A Civil Lead Engineer
X
A
A Civil Lead Engineer A
A Document Control A
A Mechanical Lead En
A
A Mechanical Lead Engineer A A
A Piping Lead Engine
A Piping Lead Engineer
A A
A Electrical Lead Eng
A Electrical Lead Engineer
A A
A
X
Instrument Lead En
A
A Instrument Lead Engineer A
A Document Control
X
A Document Control
A A
A
CONTENTS
1 GENERAL
1.1 OUTLINE OF STRUCTURE
1.2 APPLICABLE SPECIFICATIONS, CODES AND STANDARD
1.3 ALLOWABLE STRESS AND UNIT WEIGHT OF MATERIAL
1.4 UNIT OF MEASUREMENT
1.5 COMPUTER SOFTWARE
2 CALCULATION
2.1 SPACIFICATION AT BUILDING
2.2 DIMENSIONS
3 LOADING
3.1 DEAD LOAD
3.2 LIVE LOAD
3.3 WIND LOAD
3.4 SEISMIC LOAD
3.4.1 Determine Risk Categories
3.4.2 Determine Ss and S1
3.4.3 Determine the site class (soil type)
3.4.4 Determine the value Fa and Fv
3.4.5 Determine the value SDS and S1
3.4.6 Respon Spektra Desain
3.4.7 Determination of seismic design category (KDG)
3.4.8 Determination of the level of seismic risk
3.4.9 Building Seismic Parameters
3.4.10 Calculation of earthquake forces drawn from the program Staad Pro
4 JOINT CONNECTION
4.1 DC JOINT SHEAR PLATE
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
4.2 DC JOINT AND PLATE
4.3 DC FOR ANCHOR AND BASE PLATE
5 FOUNDATION CALCULATION
5.1 FOOT PLATE OR PILE ARRANGEMENT
5.2 CHECK OF FOOT PLATE OR PILE CAPACITY
5.3 PUNCHING SHEAR CHECK
ATTACHMENTS
1. OUTPUT REPORT CALCULATION BY STAAD PRO
2. OUTPUT REPORT CALCULATION BY AFES
3. SOIL DATA
1 GENERAL
Structural calculation shows the analysis and design for "Air Compressor". This structure is sub
load. The structure framing system for resisting seismic forces is a Ordinary Steel concentrically
Project : XXXXX
Client : XXXXX
Location : XXXXX
Balance Of Plant : XXXXX
Foundation Type : XXXXX
1) Project Specification
ZII-ZP13-00-DC-C-ACH : Design Specification for Civil and Structural
2) Codes and Standards
ASCE 7-2002 : Minimum Design Loads for Buildings and Other St
UBC 1997 : Uniform Building Code
RSNI-03-1726-2010 : Rencana Standar Nasional Indonesia-03-1726-201
ACI 318-2002 : Building Code Requirement for Structural Concrete
2 CALCULATION
This calculation is prepared to explain the detail design of structure for ZII-ZP13-00-C-ACH - Ai
This structure is supported by a foot plate foundation.
2.2 DIMENSIONS
3 LOADING
3.1 Dead Load
Self Weight Structure : 4334
distance Span (L)
Weight of purlin C 125x50X20X2.3 (bp)
Weight Roof of Zincalumunium (bz)
distance antar purlin (L')
bp
L
bz
'L
V2
P=
16
Based on the structure used is the usual form of the saddle without a wall at an angle of the sad
is 10 0
Karegori Faktor
Jenis Pemanfaatan Keutamaan
Resiko
(I)
Gedung dan struktur lainnya yang memiliki resiko
rendah terhadap jiwa manusia pada saat terjadi I 1.0
kegagalan
Gedung dan struktur lain, kecuali yang termasuk
dalam kategori resiko I, II, dan IV, termasuk, tetapi tidak
dibatasi untuk:
II 1.0
- Perumahan
- Rumah Toko dan Rumah Kantor
- Gedung Perkantoran
Gedung dan struktur lainnya yang memiliki resiko
rendah terhadap jiwa manusia pada saat terjadi III 1.25
kegagalan
Gedung dan struktur lainnya yang ditunjukan sebagai
IV 1.5
fasilitas penting
S1 = 0.6 g
0.45
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
0.40
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.000
0.081
0.405
0.500
0.600
0.700
0.800
0.900
1.000
1.100
1.200
1.300
1.400
1.500
1.600
1.700
1.800
1.900
2.000
2.100
2.200
2.300
2.400
2.500
Kategori Resiko
Nilai SD1
I stsu II atau III IV
SD1<0.067 A A
0.067<SD1<0.133 B B
0.133<SD1<0.20 C C
0.20 ≤ SD1 D D
3.4.10 Calculation of earthquake forces drawn from the program Staad Pro
1 5353.167 5353.167 57 4
3 5594.419 5594.419 59 4
6 11134.813 11134.813 19 4
8 11501.389 11501.389 21 4
11 2478.675 2478.675 10 4
13 2529.209 2529.209 18 4
22 2972.665 2972.665 23 4
24 3083.177 3083.177 25 4
27 3218.534 3218.534 28 4
29 3361.961 3361.961 30 4
32 3092.897 3092.897 33 4
34 3213.724 3213.724 35 4
37 3234.689 3234.689 38 4
39 3378.358 3378.358 40 4
42 3108.577 3108.577 43 4
44 3231.63 3231.63 45 4
47 3237.137 3237.137 46 4
49 3377.065 3377.065 50 4
52 1283.643 1283.643 53 4
54 1451.966 1451.966 55 4
61 1898.939 1898.939 62 4
64 1936.871 1936.871 65 4
113 4605.204 4605.204 114 4
116 4508.105 4508.105 117 4
1 5353.167 5353.167 2 11
3 5594.419 5594.419 4 11
6 11134.81 11134.81 7 11
8 11501.39 11501.39 9 11
61 1898.939 1898.939 67 11
64 1936.871 1936.871 68 11
113 4605.204 4605.204 115 11
116 4508.105 4508.105 118 11
113 4605.204 4605.204 106 13.1
116 4508.105 4508.105 105 12.97
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
CALCULATION SHEET FOR ZII-Z
BALANCE OF PLANT ZII-ZP13-00-C-ACH
AIR COMPRESSOR DATE
21-Jul-18
DOC. NO : REV.
0
ZII-ZP13-00-DC-C-ACH
DATE BY CHKD APVD
21-Jul-18 DP DP Hy
N HISTORICAL SHEET
Description
RIBUTION ORDER
XXXXX
Project Manager
Asst. Engineering Manager
Asst. Construction & QA/QC
Asst. Project Control Manager
Asst. Start Up Manager
Chief Logistic
Chief HSE
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
Process Lead Engineer
Civil Lead Engineer
Mechanical Lead Engineer
Piping Lead Engineer
Electrical Lead Engineer
Instrument Lead Engineer
Document Control
CONTENTS
gn for "Air Compressor". This structure is subjected to the gravity, wind, earthquake
smic forces is a Ordinary Steel concentrically Braced Frames (OSBF)
kg/cm2
kg/cm2
kg/m3
kg/m3
kg/m3
12.00 m'
6.00 m'
4.00 m'
: 20 Kg/m2
: 100 kg
: 6 m'
: 120 kg/m'
DOC. NO : REV
ZII-ZP13-00-DC-C-ACH
3 : 108 kg/m'
3 : -48 kg/m'
3 : -48 kg/m'
3 : -48 kg/m'
6 : 216 kg/m'
6 : -96 kg/m'
6 : -96 kg/m'
6 : -96 kg/m'
Wind loads on the roof in
the middle
g
g
0
DATE BY CHKD APVD
21-Jul-18 DP DP Hy
(Interpolasi)
in
T(s) A(g)
0.000 0.16
0.081 0.39
0.405 0.39
0.500 0.32
CONSORTIUM PT TWINK INDONESIA AND PT PERFECT CIRCLE ENGINEERING
0.600 0.27
0.700 0.23
0.800 0.20
0.900 0.18
1.000 0.16
1.100 0.15
1.200 0.13
1.300 0.12
1.400 0.11
1.500 0.11
1.600 0.10
1.700 0.09
1.800 0.09
1.900 0.08
2.000 0.08
2.100 0.08
2.200 0.07
2.300 0.07
2.400 0.07
2.500 0.06
2.600 0.06
2.000
2.100
2.200
2.300
2.400
2.500
2.600
0
DATE BY CHKD APVD
21-Jul-18 DP DP Hy
0.405 Second
1.5 Important buildings such as power plants
8.5 Steel with steel SRPMK
6.5 Steel with steel SRPMK
Moment-X Moment-Y
Moment-Z kNm
kNm kNm
-1.061 0.004 -0.991
-1.066 -0.008 1.003
1.184 -0.03 -8.711
1.197 0.04 10.33
-0.082 0.001 -24.608
-0.081 -0.001 24.881
-0.016 0.001 -40.841
-0.019 -0.001 41.451
-0.075 0 -46.987
-0.082 0 48.216
-0.104 0 -43.535
-0.114 0 44.199
-0.125 0 -47.68
-0.137 0 48.781
-0.15 0 -44.14
-0.164 0 44.819
-0.136 -0.001 -46.919
-0.149 0.001 47.918
-0.202 -0.001 -1.985
-0.214 0.001 2.019
-0.251 0.001 0.187
-0.258 -0.001 -0.101
0.038 0 0.203
0.057 0 0.064
Cd X-dir 0.070 V X-dir 313.98
Cd Z-dir 0.091 V Z-dir 410.58
Wi * Hi
Wi * Hi Sx Sz
S Wi.hi
21412.668 0.058 57 FX 18.12 57 FZ 23.69
22377.676 0.060 59 FX 18.94 59 FZ 24.76
44539.252 0.120 19 FX 37.68 19 FZ 49.28
46005.556 0.124 21 FX 38.92 21 FZ 50.9
9914.7 0.027 10 FX 8.39 10 FZ 10.97
10116.836 0.027 18 FX 8.56 18 FZ 11.2
11890.66 0.032 23 FX 10.06 23 FZ 13.16
12332.708 0.033 25 FX 10.44 25 FZ 13.65
12874.136 0.035 28 FX 10.9 28 FZ 14.25
13447.844 0.036 30 FX 11.38 30 FZ 14.88
12371.588 0.033 33 FX 10.47 33 FZ 13.69
12854.896 0.035 35 FX 10.88 35 FZ 14.23
12938.756 0.035 38 FX 10.95 38 FZ 14.32
13513.432 0.036 40 FX 11.44 40 FZ 14.95
12434.308 0.034 43 FX 10.52 43 FZ 13.76
12926.52 0.035 45 FX 10.94 45 FZ 14.31
12948.548 0.035 46 FX 10.96 46 FZ 14.33
13508.26 0.036 50 FX 11.43 50 FZ 14.95
5134.572 0.014 53 FX 4.35 53 FZ 5.69
5807.864 0.016 55 FX 4.92 55 FZ 6.43
7595.756 0.020 62 FX 6.43 62 FZ 8.41
7747.484 0.021 65 FX 6.56 65 FZ 8.58
18420.816 0.050 114 FX 15.59 114 FZ 20.38
18032.42 0.049 117 FX 15.26 117 FZ 19.95
371147.256