II. Installation of support for lower part of filter (including frame beam)
2. Select and install individual members according to the order and the
install anchor bolts, wood bar is used for temporarily supporting column
after it is positioned, screw the bolts, then install the prepared cross beam
and diagonal brace for support, two columns are connected together,
to lift and install, after the lifting and installing connection completion, all
the bolts should not be tightened, the centre distance and column top
drawing, the plane parallelism column top can’t be over 5 mm, the centre
distance should not exceed 3 mm, the column top diagonal line should
unscrew anchor bolts and place shim under the column foot plate for
adjustment. After all the supports are adjusted and qualified, tighten the
bolts for individual connecting pieces, start to lift and install the frame
beam. The lifting and installation is made according to the order as shown
in the drawing.
3. First lift and install the row beam A, the member is placed on the column
top plate, the positioning hole is fixed with the bolts so as to prevent the
member from slipping down, two beams are connected with the joint
plate, and fixed with the erection bolts, the rest may be deduced by
analogy, lift and install according to the order, after completion of lifting
parallelism should not exceed ±3 mm, the centre distance should not
tightening, after the bolts are tightened, check them once, confirm that all
the bolts are tightened, spot welding nuts with electric welding, and all the
welding slag on the installation locations of the frame beam, middle box
body and dust bin should be ground flat with manual grinding wheel.
2. Connect two sections of dust bin with the bolts on the construction
installation site, adjust the centricity between upper mouth of dust bin and
dust outlet to±3mm, after adjustment, the seam inside the dust bin is
welded.
3. Mark the assembly centre line reference point of dust bin and flange outer
frame at upper mouth of dust bin on upper plane of frame beam before
4. Dust bins are lifted onto the frame beam one after another, the dust bin is
5. From the flange centre at upper mouth of dust bin on both ends,
respectively place two plumbs, the tip of the plumb should be coincided
with the flange centre line of dust outlet of dust bin on the centre line of
AB and BC axial line, if there is misplacement, move the dust bin fro
adjustment.
6. Adjustment of flange centre line of dust outlet between ①~⑥ axial lines is
7. After the location centre and verticality of dust bin are adjusted and
qualified, continuously weld the flange outer edge on dust bin and frame
1. Transport the wall plates of middle box to the installation site, place
2. Mark the number of each wall plate on upper plane of frame beam (the
box wall plate), mark the fixed location of each wall plate. The installation
onto respective location and the connecting fixing is made with bolts.
(the bolt should not be got too tight so as to be easy for adjustment).
3. After individual wall plates of middle box body are erected, the middle box
compartment is provided with two 500 x 800 air inlets, which are also
4. Adjust the flange centre distance at upper mouth of middle box body and
Upper box (I): 2 sets; upper box (II): 6 sets; upper box (III): two sets;
3. Installed on the plan by order of the cabinet, lifting the box placed in the
appropriate location.
4. After lifting and erection, the position is adjusted, adjust the centre distance
of air outlet of upper box body, after confirmed that the centre distance is OK,
weld all the connecting joint, the joint location of upper box body, the joint
face between upper box body and middle box body should be continuously
body and middle box body, otherwise the filtering effect will be influenced,
the blind plate should be erected as shown in the drawing. Before installation
of the blind plate, remove the trace produced during lifting and grind it flat,
5. Lift and erect upper box body, after welding work is completed, other
erection work for upper box body can’t be made temporally, until hot work for
1. Mark the standard height line of the position on each support and wall plate
handrail and protection fence, after the support is positioned and leveled,
weld the support, assemble individual ladders and platforms with bolts. After
the position and standard height are adjusted, tighten the bolts, weld ladder
and platform as well as platform and support, never place platform without
welding on support.
fencing of ladder and platform, the fencing of handrail and top of filter by
welding.
1. Mark the location of pipe bracket according to the location shown in the
drawing, fix pipe bracket onto the wall plates of air bags.
2. Before installing the main pipe, all the foreign matters and ferric oxide in
pipe should be removed, place main pipe on pipe bracket and assemble
them. The bolts at the flange connecting location should be tightened, the
pipe is installed and qualified by test, it can be connected with air receiver
VIII. Miscellaneous:
1. After the filter is installed, its inside should be thoroughly cleaned, the
scattered bolts and nuts should be picked up. The welding rod and
impurities must be cleaned away, open Ф200 inspection hole of dust bin,
clean inside foreign objects, never let impurities get into dust delivery
equipment.
2. Installation of filter bag: before install the jet pipe, bag is inserted into the
hole of plate with openings, the elastic ring at upper mouth of bag is clipped
in the hole of plate with openings, get tight at edge of hole of plate with
openings, never let air leakage, otherwise the filtering effect would be
influenced.
3. After bag is placed into the cage, put the cage into the bag (if there is
it must be fixed.), when placing the cage, you should keep it straight, avoid
4. Installation of jet pipe: when installing jet pipe, first place jet pipe onto the
cone pipe with 90゜ bend, the other end is placed onto jet pipe support,
fixed with bolts, 14 jet holes must be pointed to the centre of bags, care
check must be made, if there is tolerance, the fixed bolts on support of jet
pipe can be adjusted until it is OK, then tighten the bolts to prevent them
from loosening.
5. After installation of filtering bag, cage and jet pipe, put the cover, and press
the cover with the hand wheel, it is not allowed to have air leakage.