SOP INDEX -T3 POWER TANKING

Sr. SOP NO. Name of SOP Issue/Rev Last Issue/


NO Rev Date

1 T3SOP5010 Tank preparation(a) 0/0 05-08-04


2 T3SOP5020 Core coil assembly loading in VPD chamber. 0/0 05-08-04
3 T3SOP5030 Core coil assembly, tanking & tank blanking- 0/0 05-08-04
and vacuum pulling
4 T3SOP5040 Tank preparation(b)-CT assembly in turret. 0/0 05-08-04
5 T3SOP5050 Turrets and bushing fitting. 0/0 05-08-04
6 T3SOP5060 Shunt fitting. 0/0 05-08-04
7 T3SOP5070 OLTC head dismantling. 0/0 05-08-04
8 T3SOP5080 Leak rate of transformer in VPD chamber, core NOT IN USE
coil assembly tanking & tank blanking.
9 T3SOP5090 Clamping of core coil assembly (conventional). NOT IN USE
10 T3SOP5100 Coil clamping with hydraulic jack. NOT IN USE
11 T3SOP5110 Single phase 420kv reactor clamping. NOT IN USE
12 T3SOP5120 3Phase,3limb reactor clamping. NOT IN USE
13 T3SOP5130 Final tanking & core coil assembly. NOT IN USE
14 T3SOP5140 Attaching OLTC on tank after final tanking 0/0 05-08-04
(BHEL mtype).
15 T3SOP5150 Motor drive unit fitting & coupling with OLTC. 0/0 05-08-04
16 T3SOP5160 Alignment of motor drive unit with OLTC to 0/0 05-08-04
avoid rotational lap (for 3 pole OLTC).
17 T3SOP5170 Bushing fitting &jumper rope connection ( i.e. 0/0 05-08-04
2000A/3150A)
18 T3SOP5180 Bushing fitting & connection ( Draw through 0/0 05-08-04
lead type )
19 T3SOP5190 Oil leakage test of a fully assembled transformer 0/0 05-08-04
20 T3SOP5200 Oil leakage test after cover welding NOT IN USE
21 T3SOP5210 Dismantling / Blanking & Pressure test 0/0 05-08-04
22 T3SOP5220 Making main unit ready for despatch 0/0 05-08-04
23 T3SOP5230 Preparation for cover welding NOT IN USE
24 T3SOP5240 Tank oil measurement during oil filling 0/0 05-08-04