Maryland State Highway Administration

District 3 - Project Updates

System Preservation
Projects

Legislative District 16

Montgomery County
July 2018

Maryland Department of Transportation


State Highway Administration
District 3● 9300 Kenilworth Avenue● Greenbelt, MD 20770
RESURFACE/REHABILITATE

MO1575177: MD 187 from Johnson Avenue to I-495


WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY20

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 190 from Seven Locks Road to I-495


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY19

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 189 from MD 190 to Wootton Parkway


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY19

COST: Under $3 Million (Engineer’s Construction Estimate)

XY5155177: MD 190 from Marwood Hill to Gary Road


WHAT: Maintenance patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY20

COST: Under $3 Million (Engineer’s Construction Estimate)

2
MO1845177: I-270 Ramp 2 (Ramp from MD 355 NB to IS 270 WB) to Mile Marker 6.0
(Ramp from MD 28 WB to IS 270 NB)
WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: Candidate for Resurfacing Project for FY22

COST: Over $5 Million (Engineer’s Construction Estimate)

GEOMETRIC IMPROVEMENTS

MO9815187: MD 190 at Braeburn Parkway_


WHAT: Installation of concrete curb to channelize left turn movement from MD 190 onto
Braeburn Parkway. Installation of pedestrian signals on eastbound and
westbound MD 190 at the existing marked pedestrian crossing.

WHY: Improve traffic operations for motorists and enhancing pedestrian safety within
this segment of roadway.

WHEN: In design
Funded for Construction

COST: Under $3 Million (Engineer’s Construction Estimate)

CONSTRUCTION

MO1865177: I-495 from I-270 to Seminary Road (Outer Loop)

WHAT: Patch, grind, and overlay existing roadway with asphalt.

WHY: The existing pavement condition is deteriorated and is in need of repair.

WHEN: In Construction (91% complete)


Estimated completion – Summer 2018

COST: $6,997,446.30 (Bid Amount)