LEGRAND
BUILD SUSTAINABILITY IN
LEED 2009 AND V4:
NEW CONSTRUCTION
October 2016
designed to be better.TM
1
High Performance Buildings in the Market
The LEED® (Leadership in Energy and Environmental
Design) Rating System and certification program,
developed by the U.S. Green Building Council,
is the most prominent pathway for the design,
construction, and operation of high performance
sustainable buildings in the market today.
2
Legrand Product Contribution to LEED
This guide is specific to LEED 2009 and v4 for Building Design and Construction: New Construction and
Major Renovation.
Users of this Guide are encouraged to take advantage of the “check-list” design throughout and Wish List at
the end as shown below. As you review the categories and credits Legrand’s products contribute to, mark “Your
Choice” to build your list of desirable products (pages 6-12). You can then use the Wish List (pages 16-18) to
summarize your product selection and contact a Legrand sales representative with your order.
*additional 10 points accounts for 6 Innovation points and 4 Regional Priority points
3
SUMMARY OF
POINTS
Points
SUSTAINABLE SITES
Light pollution reduction (2009) 1
INNOVATION
To provide design teams and projects the opportunity to be awarded points for
exceptional performance above the requirements. Click here for more details. 1
4
DETERMINING Sustainable Sites
PROJECT GOALS
• Does your project seek to reduce lighting’s impact on
the surrounding nocturnal environment?
•How will you control lighting levels for your building’s
outdoor footprint?
5
SUSTAINABLE SITES
GOAL: Reduce Site Impact on the Surrounding Area
Your Your
Point(s) Point(s)
Choice Choice
1 1
For a whole-room or building solution, Legrand’s Our outdoor motion sensors provide lighting only
Digital Lighting Management (DLM) system can when needed and can reduce light levels by 50%
turn off all luminaries in direct line of sight by when there are no occupants, reducing overall light
using a scheduling feature. pollution from your project.
Your Your
Point(s) Point(s)
Choice Choice
1 1
Our astronomic 24 hour programmable timers Legrand’s motorized shades offering by QMotion
automatically calculate sunrise and sunset times and Solarfective can be programmed to close at the
based on latitude and longitude to ensure no end of the work day, minimizing excess light passing
excess light reaches the perimeter of the space through to the building’s exterior.
after dark.
Note: Choosing one or more Legrand products will only contribute to the Max. Potential Points as indicated on the top right of the page.
Use of multiple products under one specific credit does not equate to the achievement of multiple points in all cases.
6
ENERGY AND ATMOSPHERE
GOAL: Reduce Overall Energy Use
System Approach
Your Your
Point(s) Point(s)
Choice Choice
1-18 1-18
q q
Our universal dimmer module and system Our Digital Lighting Management (DLM) system allows for full dimming control (including on,
controllers, offered by Vantage, can reduce off, midlevel) in multi-occupant spaces, along with digital switches that can be programmed
unnecessary electrical loads through for precise control of all loads, reducing or eliminating load levels when they aren’t needed. In
programming, therefore reducing energy usage in addition, our IR dimmer remote control provides occupants with adjustable light levels based on
the facility. their needs, to achieve energy savings but not at the expense of the occupant.
Your
Our plug load controllable receptacles and wireless plug load RF Point(s)
Choice
receptacles reduce vampire loads from devices that consume power
even when in the “off” position.
These receptacles are also code compliant with National Electrical
3
Code®, CA Title 24, and ASHRAE Energy Efficiency Standard 90.1. (50% (estimated 10% reduction) 2
of receptacles must be controlled)
Note: Choosing one or more Legrand products will only contribute to the Max. Potential Points as indicated on the top right of the page.
Use of multiple products under one specific credit does not equate to the achievement of multiple points in all cases.
1
Lighting load has been determined to be 20% of the building’s energy use, as analyzed by NREL and the Department of
Energy. By combining use of all 3 technologies, lighting load can be significantly reduced by an estimated 70%
2
Plug and process loads have been determined to be 33% of overall building energy use by NREL and the Dept of Energy. Use of plug load controls
can reduce this by 1/3rd. http://www.nrel.gov/docs/fy13osti/54175.pdf
7
ENERGY AND ATMOSPHERE
GOAL: Reduce Overall Energy Use
Passive Solutions
Your Your
Point(s) Point(s)
Choice Choice
13 1-18 q
(33% reduction according to Legrand case study) 3 q # of points achieved is dependent on building
owner ability to reduce temperature set points
Legrand’s Contain-IT™ aisle containment prevents the mixing in data center or server room
of hot exhaust air with cold supply air - a critical element in
proper data center airflow management - to help your facility Our Mighty Mo® cabinet airflow baffle
to achieve significant energy savings and improved server room system is designed to redirect airflow from
energy efficiency. side venting equipment from the cold aisle to
the hot aisle to maintain maximum cooling.
Note: Not applicable to all commercial buildings. Dependent on
size and function of the facility. Note: Not applicable to all commercial
buildings. Dependent on size and function of
the facility.
Your Your
Choice Choice
Legrand’s high performance LED fixtures, offered by Pinnacle Your data room may also be an opportunity to optimize energy
Architectural Lighting, complement your lighting control use. The PX-5000 Intelligent Rack PDU series, offered by
strategies by being the most energy efficient luminaire choice Raritan, provides reliable power distribution for IT equipment
available while still meeting aesthetic design requirements. cabinets by metering at the inlet, outlet, and PDU circuit
Adeo, Linero 6 and Edge Evolution 3 provide a diverse collection breaker level. It uses latching bistable relays that only require
of mounting and shielding solutions to meet your project energy when switching from one state to another, eliminating
requirements. unnecessary power loads.
Note: Not applicable to all commercial buildings. Dependent on
size and function of the facility.
1
https://www.legrand.us/electrorack/contain-it/hostdime-case-study.aspx#.V359NfkrK00
8
ENERGY AND ATMOSPHERE
GOAL: Reduce Overall Energy Use
Your Your
Point(s) Point(s)
Choice Choice
1 1
Legrand’s system controller offering supports Our DLM technology platform controls and
demand response by acting as the brain for all monitors every switch, outlet and lighting load to
your subsystems and can be programmed with optimize energy performance during a demand
variable power profiles to match daily variations response event. Built on open standards, DLM
in utility demand and energy rates. makes every control point accessible, in real
time, and integrates with a building’s existing
BAS and is adjustable from a central location.
Fundamental Commissioning and Verification (prerequisite for 2009 and v4): To support
the design, construction, and eventual operation of a project that meets the owner’s project Max. Potential
requirements for energy, water, indoor environmental quality, and durability. Point(s) = 4
CREDIT(S) Enhanced Commissioning (v4): To further support the design, construction, and eventual
operation of a project that meets the owner’s project requirements for energy, water, indoor
environmental quality, and durability.
Your Your
Point(s) Point(s)
Choice Choice
4 4
Our Digital Lighting Management experts support Legrand’s RackLink™ Power Management System,
the CxA and facility manager to ensure our systems offered by Middle Atlantic Products, provides integrators
meet the needs of the building. Legrand provides O&M with real-time visibility and control over the power
documentation and occupant training to support the distribution and status of any installation from anywhere
project’s commissioning needs. in the world.
Additionally, DLM provides autonomous, distributed
control at the load-level, allowing you to better
manage energy consumption points. Our products
support M&V by capturing data points at the load-
level and analyzing usage through our user-friendly
dashboard tool.
9
MATERIALS AND RESOURCES
GOAL: Materials Used to Build, Retrofit and Operate the Building
have a Reduced Environmental Impact
1 1 1
Middle Atlantic Products’ technical furniture Our metal enclosures Our Cablofil® ladder tray and wire mesh
offering consists of credenzas, studio furniture, and racks, including our are made from recycled aluminum.
console systems and display carts, which are Mighty Mo 20 assembly, Contact your sales representative for
made of 100% post-industrial (pre-consumer) are made from recycled additional information.
recycled wood residuals (MDF). steel. Contact your
sales representative for
additional information.
2 2 2 2
Our Electrorack® enclosures, racks EZ Patch provides The Walkerflex Modular Wiring Our prewired
and cabinets deliver complete an environmentally System is a factory assembled, aluminum raceway
cabinets with optional accessories friendly way to pre-manufactured connector and is manufactured
fully assembled, reducing setup time dispense and cable set system with a plug- in our U.S.- based
and unnecessary construction waste manage patch cords for a quick n-play feature, providing wire Wiremold factory, cut to the
in your data center. and easy installation. There are no management flexibility and labor specified job site lengths,
bags to open, tie wraps to undo or savings vs. traditional pipe and electrically prewired, and delivered
straightening necessary reducing on- box wiring methods or MC Cable to your project with minimal
site construction waste at installation. wiring methods. on-site waste.
EZ Patch contains Ortronics Clarity
patch cords and is offered in Category
6a, 6 and 5e in a variety of standard
lengths and colors.
Note: Choosing one or more Legrand products will only contribute to the Max. Potential Points as indicated on the top right of the
page. Use of multiple products under one specific credit does not equate to the achievement of multiple points in all cases. 10
MATERIALS AND RESOURCES
GOAL: Materials Used to Build, Retrofit and Operate the Building
have a Reduced Environmental Impact
1
Program. Visit our Environmental Product Declarations
Resource Library to download Legrand’s PEPs for your
next project.
11
INDOOR ENVIRONMENTAL QUALITY
GOAL: Improve indoor air quality and thermal, visual,
and acoustic comfort for building occupants
1 1 1
(LEED v4 only)
Our DLM system provides dimming capable Legrand’s lighting control offering consists of Middle Atlantic Products’ technical furniture
room controllers that allow for full dimming dimmers, including rotary, toggle, toggle plus, products provide the Light Reflectance Value
control (including on, off, midlevel) in multi- and short-slide, occupancy/vacancy sensors, (LRV) for the finishes, enabling customers
occupant spaces, along with digital switches time-switches and room controls to meet your to calculate the weighted average surface
that can be programmed for precise control individual occupant control needs. Additionally, reflectance for work surfaces.
of all loads. In addition, the IR dimmer remote once installed, these devices can offer energy
control provides occupants with adjustable savings by giving occupants the ability to reduce
light levels based on their current needs. the lighting load when it is unnecessary.
Daylight and views – daylight (2009): To provide building occupants with a connection
between indoor spaces and the outdoors through the introduction of daylight via manual or
Max. Potential
automatic glare control devices. Point(s) = 1
CREDIT(S) Daylight (v4): To connect building occupants with the outdoors, reinforce circadian rhythms, and
reduce the use of electrical lighting by introducing daylight into the space.
INNOVATION
GOAL: Earn Points for Exceptional Performance
To provide design teams and projects the opportunity to be awarded points for exceptional
performance above the requirements set by the LEED Rating System and/or for innovative Max. Potential
performance in green building categories not specifically addressed by the LEED Rating System. Point(s) = 1
CREDIT(S)
Legrand solutions may be combined to bring power, light, data, and AV to your outdoor space, extending
the usable space of your sustainable building, further improving site sustainability, enhancing energy
management and increasing occupant well-being. The design and development of safe and productive
outdoor spaces may qualify for an innovation credit. We are always receptive to working with our customers
to help them achieve innovation credits. Contact a Legrand representative to find out more about how you
can implement this concept in your LEED project.
Note: Choosing one or more Legrand products will only contribute to the Max. Potential Points as indicated on the top right of the
page. Use of multiple products under one specific credit does not equate to the achievement of multiple points in all cases. 12
At Legrand, commitment to performance and sustainability is at our core. We build
energy and water efficiency and waste reduction into everything we manufacture.
We continually monitor and reduce our resource use and evaluate the environmental
impact of our products through their life cycle. The result: Our innovative products
and systems enable high-performance buildings to reach exceptional levels of
efficiency and productivity – and equally high sustainability standards.
Reduction of Hazardous
Product Transparency Supplier Engagement
Materials
At Legrand, we strive to manage energy, waste and water better. 34% better.
That’s how much we reduced our energy intensity across 14 US sites from
2009–2013. We want to get even better so we set new goals for all North
American sites: reduce energy intensity by another 25%; reduce water
consumption by 25%; and achieve zero waste to landfill by 2022. Better for us
and the environment.
13
CONTINUING EDUCATION MODULES
LEED professionals are required to complete Continuing Education Hours in
order to maintain their LEED accreditation. To that end, Legrand offers
2 learning modules that are approved for CEU hours by GBCI.
Module 1
The expectation for better products, better systems, and better buildings has created
demand for reliable disclosure methods for the health and environmental impacts of
building materials. This course will explore the product transparency movement in terms of
environmental product declarations, in particular the product environmental profile (PEP).
An overview of how a PEP is created, the basic terms used in a PEP, and a part-by-part
review of a sample PEP are presented.
1 hour
Module 2
1 hour
14
Legrand North American Manufacturing Facilities
Professional Resources
Legrand’s LEED professionals are available to offer additional support and services. For specific product or project
support, please contact your nearest sales representative. If there is not a sales representative near you, please
contact one of Legrand’s other LEED professionals with “National” responsibility and they will be able to assist you.
Your
Energy and Atmosphere Choice
Minimum Energy Performance (2009 and v4)
Max. Potential Point(s) = 3-13
Optimize Energy Performance (2009 and v4)
Dimmer
Option 2:
1 point
Timer
Plug Load Controllable Receptacles and Wireless Plug Load RF Receptacles 3 points
LED fixtures
q # of points achieved is dependent on building owner usage and % load reduction achieved
16
MY WISH LIST Page 2
System Controller
Your
Materials and Resources Choice
Recycled content (2009)
Max. Potential Point(s) = 1
Building product disclosure and optimization-sourcing of raw materials (v4)
17
MY WISH LIST Page 3
Your
Materials and Resources (continued) Choice
Building product disclosure and optimization - environmental product declarations (v4) Max. Potential Point(s) = 1
Your
Indoor Environmental Quality Choice
Controllability of systems - lighting EQc6.1 (2009)
Max. Potential Point(s) = 1
Interior Lighting
Your
Innovation Max. Potential Point(s) = 1
Choice
18
©2016 Legrand All Rights Reserved