KEY PLAN

DRAINAGE LAY OUT


329 330 1

320
331
328 ABBREVIATIONS AND SYMBOLS LEGEND

319 327 M11 - ASP: -0.252


321
326 MHT: -0.207 DESIGN AND SURVEY LEVELS LEGEND:
DRAIN POINT 312 318
M12 - ASP: -0.165 325
-0.238 311 313 MHT: -0.110 324
322
310 317
323
X
314 ROAD SETTINGOUT COORDINATES

305 309 316


LEVELS ARE IN METER, LEVEL DIFFERENCE ARE IN MILLIMETER

304 315 REFERENCED DESIGN DRAWING:


COORDINATES COORDINATES 308
6004-0000-WSP-3100-DG-0401
6004-0000-WSP-3100-DG-0402

POINTS EASTING NORTHING POINTS EASTING NORTHING 303 306 REFERENCED ERI:-
240 478680.093 2774985.074 286 478707.927 2775044.158 307
ERI / 82

241 478682.927 2774994.028 287 478701.838 2775048.383 293 DRAIN POINT


302 -0.159
242 478676.248 2774996.123 288 478700.606 2775049.238 294
243 478671.205 2774997.628 289 478697.525 2775051.376 DRAIN POINT 295 301
292 296
244 478666.229 2774999.267 290 478694.444 2775053.514 -0.159
297
245 478659.55 2775001.363 291 478693.212 2775054.369 291 298 MAIN CONTRACTOR::-

C E R T I F I C A T I O N (Contract No.: 37446370)


246 478662.983 2775011.409 292 478687.050 2775058.645 290289 299 THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED
ON CONTRACT DOCUMENTS
THE MAIN CONTRACTOR REVIEWED THE DRAWING BASED
ON CONTRACT DOCUMENTS

247 478669.548 2775008.979 293 478693.164 2775067.365


APPROVED SIGNATORY: (ARCH. & STRUCT. REVIEW) APPROVED SIGNATORY: (MEP REVIEW)

278 288
V.V ARUN KUMAR
NAME:..................................................................................................... NAME:.....................................................................................................

SIGNATURE:........................................................................................... SIGNATURE:...........................................................................................

248 478670.956 2775008.458 294 478699.274 2775062.651 287 300


279
249 478674.443 2775007.101 295 478700.462 2775061.735 280 286 3

250 478677.989 2775005.855 296 478703.440 2775059.456 276 281 2


1
ITEM SPECIFICATION No. DESCRIPTION

251 478679.395 2775005.335 297 478706.400 2775057.154 275 283 SPECIFICATIONS REFERENCE

282
252 478685.96 2775002.905 298 478707.587 2775056.238 274 284
253 478691.598 2775007.092 299 478713.109 2775051.978 277 272 285
273
254 478689.437 2775011.618 300 478713.908 2775046.793 271
261 270
255 478683.003 2775014.376 301 478717.287 2775060.747 DRAIN POINT
262 269
256 478681.625 2775014.966 302 478713.725 2775063.793 263 -0.256 ITEM DRAWING TITLE DRAWING NO. REV

264 CONTRACT DRAWINGS REFERENCE


257 478678.154 2775016.4 303 478705.746 2775070.617 DRAIN POINT 265
258 478674.732 2775017.921 304 478699.617 2775075.859 -0.227 260 266 DRAIN POINT
259 267 -0.240
259 478673.352 2775018.512 305 478712.611 2775078.247 ITEM DRAWING TITLE DRAWING NO. REV

SHOP DRAWINGS REFERENCE


260 478666.919 2775021.27 306 478720.237 2775071.029 257
258 268
261 478671.292 2775030.945 307 478723.505 2775067.936 256 255
262 478677.632 2775027.841 308 478730.340 2775074.540 246 254 00 KERB TOP LVL ADDED 27.05.2018 NM AH

REV DESCRIPTION DATE DRAWN CHKD

263 478678.98 2775027.181 309 478727.104 2775077.928 247 DRAWING REVISIONS

248 249 PROJECT:

264 478682.123 2775025.642 310 478719.852 2775085.521 251 253 BLUEWATERS WHARF RETAIL
DRAIN POINT 250 DUBAI, U.A.E.
265 478685.716 2775023.882 311 478716.679 2775088.843 252
-0.239 OWNER
266 478687.062 2775023.223 312 478718.471 2775091.299 245
244 DRAIN POINT
267 478693.349 2775020.145 313 478722.148 2775087.713 -0.229
243 242 EMAAR SQUARE, BUILDING 1, LEVEL 3 & 5
268 478694.887 2775014.671 314 478730.936 2775081.122 P.O. BOX 123311, DUBAI, U.A.E.
241 T 04 511 4500

269 478697.686 2775028.463 315 478733.870 2775076.372 CLIENT:

270 478691.562 2775031.855 316 478736.991 2775077.180 237


238
271 478690.251 2775032.581 317 478735.545 2775083.000 239
EMAAR BUISINESS PARK, OFFICE 302, THE GREENS, SHEIKH ZAYED ROAD
P.O. BOX 54094, DUBAI, U.A.E.
T +971(0)4 453 8835
272 478686.957 2775034.377 318 478725.158 2775091.689 240
CONSULTANT:
273 478683.69 2775036.215 319 478720.114 2775094.597
274 478682.377 2775036.942 320 478723.087 2775099.980 236
235 234 P.O.Box. 7497 Dubai, U.A.E
275 478675.941 2775040.506 321 478727.597 2775096.033 Tel: +971 4 350 5000 Fax: +971 4 350 5001
233 DRAIN POINT
www.wspgroup.com

276 478673.27 2775042.619 322 478739.723 2775085.596 MAIN CONTRACTOR:

-0.117 ALEC
277 478669.192 2775035.034 323 478744.304 2775081.719
231 232 ALEC Engineering & Contracting L.L.C.
P.O.Box 27639 Dubai-U.A.E
278 478681.205 2775049.752 324 478747.567 2775089.683 230 229 Tel: 04-429 0599 Fax: 04-429 0216

279 478687.575 2775045.792 325 478741.593 2775090.146 228 DRAWN: NM CHECKED: AH DATE: 27.05.2018

280 478688.849 2775045.000 326 478740.447 2775094.930 SCALE: AS SHOWN @ A1 sheet APPROVED: AK

DRAWING TITLE:

281 478692.026 2775043.010 327 478736.718 2775098.139 DRAIN POINT ROAD GRADING PLAN AS PER CURRENT
-0.267 223 SITE CONDITION INCLUDING 50MM KIER
282 478695.218 2775041.040 328 478731.817 2775098.560 224 225 227
226 SCOPE OF WORK
283 478696.492 2775040.249 329 478730.468 2775104.405
DRAIN POINT (SHEET 3 OF3)
284 478702.479 2775036.526 330 478739.042 2775103.664
-0.243 6 0 0 4 0 1 0 0 A L E
285 478705.710 2775034.736 331 478745.569 2775098.054 Project Code Plot / Zone Originator