Sie sind auf Seite 1von 3

TAJUK MODULE TASK STATEMENT

NO

PENETRATION 02.01 Perform work place protection activities


PREPARATION WORKS 01.01 Prepare refrigerant piping penetration works
COS /C-010-1-(LP1) 01.05 Prepare wiring penetration works

REFRIGERANT PIPING 01.02 Prepare refrigerant piping installation works


INSTALLATION WORKS 05.01 Perform refrigerant piping bracket installation works
COS/ACMV-C-010-1 (LP2) 05.03 Perform refrigerant pipe bending works
05.02 Perform refrigerant pipe insulation works
05.04 Perform refrigerant piping installation works

ACMV EQUIPMENTS 02.03 Remove ACMV protective mater


INSTALLATION WORKS 01.04 Prepare ACMV equipment installation works
COS / C-010-1-(LP3) 04.01 Perform air conditioning bracket installation works
05.05 Perform air conditioning drain pipe installation works
04.02 Perform air conditioning equipment installation works

ELECRICAL INSTALLATION
01.03 Prepare ACMV wiring installation works
WORKS
03.02 Perform ACMV power supply wiring installation works
COS/ACMV-C-010-1(LP4)
03.01 Perform ACMV control wiring installation works

02.05 Carry out cleaning works


FINISHING WORKS
02.02 Provide rubbish disposal
COS1/-C-010-1-(LP5)
02.04 Carry out touch up works

07.01 Perform air conditioning routine service and


SERVICING ACTIVITIES
maintenance works
COS / C-010-1-(LP6)
TAJUK MODULE TASK STATEMENT
NO

MATERIAL STORAGE 02.06 Prepare material and equipment storage area


PREPARATION
COS/C-010-2 (LP2)

AIR CONDITIONING PIPING 05.06 Perform Refrigerant Swaging Joint


INSTALLATION 05.07 Perform Refrigerant Flaring Joint
COS/C-010-2 (LP3) 05.08 Perform Refrigerant pipe brazing joint
04.04 Perform air conditioning refrigerant pipe final &
connection works

AIR CONDITIONING 03.03 Install Electrical Starter Panel


ELECTRICAL 03.04 Perform Wiring Termination
INSTALLATION
COS/C-010-2 (LP4)

AIR CONDITIONING 06.01 Perform air conditioning refrigerant system leak


TESTING & 06.02 Perform air conditioning refrigerant system purging
COMMISIONING 06.03 Perform air conditioning refrigerant system vacuuming
COS/ C-010-2 (LP5) 06.04 Perform refrigerant system charging

AIR CONDITIONING 07.03 Perform ACMV corrective maintenance works


MAINTENANCE WORKS 07.02 Perform ACMV trouble shooting
COS/C-010-2 (LP6)

AIR CONDITIONING 07.02 Prepare ACMV system and maintenance report


MAINTENANCE REPORT
COS/C-010-2 (LP7)

Das könnte Ihnen auch gefallen