Beruflich Dokumente
Kultur Dokumente
Balance Full PO
ATTACHMENTS: NCR Punchlist Partial Release
Release Release
RECORD OF HOURS
Vendor / Report Hours: 1 Visit Travelling Hours: Distance Travelled:
Inspecting Engineer: Rahul M Reviewed by: Girish Kumar HM Agreed Expenses: Yes No
L5-FMT-046 Rev. 03
1.Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback
on the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos
Witnessed Burst Test for the below mentioned cylinders with Achieved Result :-
Burst Standard
Cylinder
Pressure
Capacity Serial No.
Achieved
(Liter)
(Bar)
48 L 48277 87.12 OS : 120
48 L 48666 84.62 OS : 120
48 L 49090 86.12 OS : 120
48 L 52225 84.12 GSO ISO 22991
48 L 52825 86.12 GSO ISO 22991
48 L 53323 85.12 GSO ISO 22991
48 L 53838 87.62 GSO ISO 22991
Burst test pressure value for above all meets the standard requirements - Found accepted.
Verified & Reviewed calibration certificate of pressure gauge – Found valid.
8.0 NEXT VISIT / EXIT CALL (must give estimated date if no fixed date; include stage/activity details): TBA
L5-FMT-046 Rev. 03
1.Report Headings: 2.Persons Present 3.Documentation Used /Approval Status 4.Inspection Carried Out 5.HSE Feedback
on the Vendor 6.Results/Conclusions 7.Overall Order Status 8.Next Visit/Exit Call 9.Attachments/Photos
- End of Report –
L5-FMT-046 Rev. 03