Beruflich Dokumente
Kultur Dokumente
8000
7000
A
6000
L2
B
5000
4000
H
2000
0
Double Arm
ARCHED SUITE
welding processes.
• Built-in control box with cast aluminium service door and
safety rope.
• The control gear tray is prewired with MCB, terminal connec-
tors for loop-in loop-out arrangement.
Fixture Options
Mounting Details
Junction box
Cable Entry No.of holes/ Electrical junction
Pole Height Base plate (A) CC (D) Bolt (E) Length ( F) from base plate
Hole (B) bolts (C) box (H)
(G)
H E
5000 □250 x 12thk Ø70 4 180 M16 500 300 295 x 85