Sie sind auf Seite 1von 7

4.8.

5
Document

Design Drawings
132kV Substations
Hinkley Point C Connection Project
Regulation 5(2)(o) of the Infrastructure Planning
(Applications: Prescribed Forms and Procedure)
Regulations 2009

Application Reference EN020001 May 2014


Site Map

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER Dra


in

Dr
ai
n

DESIGN DRAWINGS 10.0m

n
ai
Dr
(REGULATION 5(2)(o))
Pond

Dra
in

E
LA N
n
i
a
r
D

OD
IWO
Track

y
d Bd
Drain

SHEET 35 OF 70 Drain

War
9.7m

RH
NORTH SOMERSET COUNCIL

m
91
0.
Pond

Mast

33kV COMPOUND 12.6m

E TL
Dr
ai
ETL

n
CO M POUND
132kV
ETL

El Sub Sta

Stock

B 3133
B 3133

13.7m 17.1m

STO
CK BS

L
LAN

T
E

E
Gardner's Arms

33kV CONTROL BUILDING

B
19.2m

RH
m
91
0.
Pond

B
31
33

B
31
CG

33
L
T
E

Mead Court
La Chaumiere

EARTHING TRANSFORMER ENCLOSURE Cedar Barn

Willow
Barn
Mead
Cottage

ACCESS ROAD Motel

LB Chestnut
Barn
Stock Farm

Barelli Cottage

Pond Lilac

y
Cottage

Bd
rd
WaRH
91m
17.7m

0.
Pond
Pond

Drain
The White House

Key
9000
EXISTING - BLACK
132kV CONTROL BUILDING EQUIPMENT TO BE REMOVED - GREEN
COMPOUND NEW EQUIPMENT - RED
YN

a2 b2 c2

EXTENSION CSE - CABLE SEALING END

CENTER
CENTER

A13 B13 C13

BS - BUSBAR SUPPORT
DC - DISCONNECTOR
CB - CIRCUIT BREAKER
FC - FLEXIBLE CONDUCTOR SUPPORT
VT - VOLTAGE TRANSFORMER
UNDERGROUND CABLE

DC DC

132kV COMPOUND

CB CB

NE TO BE
NE
NEW FENCLI

REM OVED
BS BS

NG FENCLI
CB

Notes
DC DC
CABLE ROUTE SHOWN IS INDICATIVE ONLY
STI
EXI

FC FC
BS BS

DC DC

DC DC
Reference Drawings
CB CB
CHURCHILL 132kV SUBSTATION
ELEVATIONS 13/NG/0260 (PINS SHEET 36)
CB CB

DC DC CHURCHILL 132kV SUBSTATION 132kV


OVERHEAD LINE AND CABLE ENTRIES
13/NG/0282 (PINS SHEET 69)

VT
DC DC VT
CSE

REPRODUCED FROM ORDNANCE SURVEY MAPS.


BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER HER MAJESTY'S
STATIONERY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471

A REPLACE OLD EQUIPMENT WITH


A
11500
EQUIVALENT NEW
COMPOUND
EXTENSION

B MAY '14 FOR DCO SUBMISSION CFK LD JB

A AUG '13 FOR S.42 & S.47 CONSULTATION GT JB PB

ISSUE DATE COMMENTS DRAWN CHK'D APP'D

TITLE:

CHURCHILL 132kV SUBSTATION


SITE PLAN
PYLON N1

PINS SHEET 35 OF 70

Warwick Technology Park, Gallows Hill, Warwick, CV34 6DA

NG INVESTMENT No. APPLICATION No.


CAD
B

20897 EN020001
A1
NG DRAWING No. DRAWING No. SCALE

1:250
13/NG/0259 A110181
ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

National Grid plc owns the Copyright of this Document. It may not be reproduced or transmitted in any form or for any purpose, without the express written permission of National Grid plc
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
DESIGN DRAWINGS
(REGULATION 5(2)(o))
SHEET 36 OF 70
NORTH SOMERSET COUNCIL

Key

EXISTING - BLACK
EQUIPMENT TO BE REMOVED - GREEN
NEW EQUIPMENT - RED
CSE - CABLE SEALING END
BS - BUSBAR SUPPORT
DC - DISCONNECTOR
CB - CIRCUIT BREAKER
FC - FLEXIBLE CONDUCTOR SUPPORT
VT - VOLTAGE TRANSFORMER

FC FC

10100
7800

CSE CSE CSE VT VT VT


4500

Notes

SUBSTATION FENCE PART


SHOWN FOR CLARITY
SECTION A - A

PYLON N1

Reference Drawings

CHURCHILL 132kV SUBSTATION SITE PLAN


13/NG/0259 (PINS SHEET 35)
23300

FC
DC
10100

EARTHING
VT DC BS
DC CB BS CB TRANSFORMER
ENCLOSURE

B MAY '14 FOR DCO SUBMISSION CFK LD JB

FOR S.42 & S.47


A AUG '13 GT JB PB
CONSULTATION

ISSUE DATE COMMENTS DRAWN CHK'D APP'D


SECTION B - B
TITLE:

CHURCHILL 132kV SUBSTATION


SITE ELEVATIONS

PINS SHEET 36 OF 70

NG INVESTMENT No. APPLICATION No.


CAD
20897 EN020001
A1
NG DRAWING No. WPD DRAWING No. SCALE

1:250
13/NG/0260 A110182
ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

COPYRIGHT NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION PLC.
n
rai
D
El Sub Sta

Site Map
Tank Tank

Tank
Tanks

Drain

D
ra
i
n

D
ra
in
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
Slag Heap

6.4m
D
rai
n

n
ai
Dr

DESIGN DRAWINGS
D
ra
in

Ne

E
LAN
w
L
T
E

LAST
hi

in
ne

ra

BAL
D

n
ai
Dr
(REGULATION 5(2)(o))

D
ra
in
D
ra
in
s
n
rai
D
6.4m

D
n

ra
rai

in
D

SHEET 37 OF 70
n
i
a
Dr

n
ai
Dr
U
ni
tA

Ne
w
Rh
ine
E
N
LA
ST
LLA
BA
Uni
tB
6.4m
7.6m

BRISTOL CITY COUNCIL El Sub Sta

Depot

ton
Pump House
A
VO
N
M
O
U
T
H
W
AY

amp

ain
reh

Dr
hihn
i e
SR

ETL
Depot

F
IF
T
H
Tank

W
AY
ai
Dr n
Depot

ain
Dr
Warehouse

Depot
Warehouse
Depot
AY
W
H
UT
O
NM
O
AV

Dr
Depot

ain
RD W AY

ain
2

Dr
Warehouse

THI
Warehouse

AY W
Depot

LLM ENT
WI

FOU
o5
D
ra

3t

RT
in
s

H
W
Warehouse

AY
6b

6a

Richmond House 5

10
7.6m
El
Sub Sta
1
Depot

The Polygon

7.6m

10
AVONMO
UTHWAY

L
T
E
LESCREN W AY
ehouse
ry

FOU
K
AN

nt
AB
SE
TO

1
Ga

RT
H
W ar
Electricity Transmission Station

W
7

AY
Warehouse
Depot Tank

2-
4

El
Su
bS
5

ta
Warehouse

SECO ND W AY
Warehouse

Warehouse
5
L M
ET

ry
nt
Ga

Warehouse

Y
WA
H
RT
FOU

Platforms

1
Depot
9 10 11

Bakery

Drain

Depot

8
Warehouse
7

L
ET
El Sub Sta

FB
Drain

Gantry

y
Subwa

Shi
reha
Tank

m pt
Gantry

on Rh
Gantry
M5
Drain

ine
5
M

Avonbridge Trading Traffic Beacon

1
Estate
3t
o1
5

D
rai
n

D
A
RO
IC
T
AN
16t

L
o1
7 Gantry

T
A

Dr
L
ET

ai
M 5

n
Gantry
ain
Tank Dr

ain
Dr

Dr
Tank

ai
El Sub Sta

n
Drain
Chimney

ank
T ank
T

19

ry
nt
AD

Ga
RO
IC
y
tr

NT
n
a

LA
G

AT
Club

Drain

Sports Ground
Bowling Green
Floodlights
n
i
a
Dr

Works

k
ac
Tr

L
ET
AV
RO
ON
AD

k
MO

an
UT Works

T
H 5
M

in
ra
Allotment Gardens

D
Dr
ain
DW

55

in
ra

NE
D

LA
Cycl

S
eT

'
Tank r
ac

K
k

C
A
Sl

R
R
A
B
Dr
ain

FB
43

Pond

33

7.0m

th
Pa

27
Pavilion

Avon Primary School


P AV (junior mixed and infants)
at
h ON 26
(
um) School
MO House

21
UT
H
RO
AD

20
1
6
13

Football Ground
Drain

42
40
Key

EXISTING - BLACK
EQUIPMENT TO BE REMOVED - GREEN
WEATHER BEATER GEAR NEW EQUIPMENT - RED
CSE - CABLE SEALING END
BS - BUSBAR SUPPORT
DC - DISCONNECTOR
REACTORS
OH - OVERHEAD TERMINATION
UNDERGROUND CABLE

C
D

GRID T2 BAY GRID T1 BAY

YN YN
a2 b2 c2 a2 b2 c2

Notes

CABLE ROUTE SHOWN IS INDICATIVE


ONLY

B B
BS DC
CSE

CSE
TO SEABANK

CSE Reference Drawings

AVONMOUTH 132kV SUBSTATION SITE


BS
BS BS BS ELEVATIONS 13/NG/0262 (PINS SHEET 38)

K
AN
DC
DC DC BS

AB
SE
CSE CSE CSE

BS

BS
REPRODUCED FROM ORDNANCE SURVEY MAPS.
OH
BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER HER MAJESTY'S
PYLON G24 STATIONERY OFFICE. © CROWN COPYRIGHT
ORDNANCE SURVEY. OS LICENCE NO. 100048471

LL
URCHI
CH OH

BS

TON
DC DC B MAY '14 FOR DCO SUBMISSION CFK LD JB
PYLON G23A
WES OH A AUG '13 FOR S.42 & S.47 GT JB PB
CONSULTATION

ISSUE DATE COMMENTS DRAWN CHK'D APP'D

TITLE:

A SUBSTATION FENCE
A
AVONMOUTH 132kV SUBSTATION
D

C
SITE PLAN

PINS SHEET 37 OF 70

NG INVESTMENT No. APPLICATION No.


CAD
20897 EN020001
A1
NG DRAWING No. DRAWING No. SCALE

1:250
13/NG/0261 A110184
ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

COPYRIGHT NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION PLC.
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
DESIGN DRAWINGS
(REGULATION 5(2)(o))
SHEET 38 OF 70
BRISTOL CITY COUNCIL

Key

EXISTING - BLACK
EQUIPMENT TO BE REMOVED - GREEN
NEW EQUIPMENT - RED
CSE - CABLE SEALING END
DC - DISCONNECTOR

C
L C
L C
L

CSE CSE CSE CSE

SUBSTATION FENCE PART


SECTION A - A SHOWN FOR CLARITY

Notes

Reference Drawings

AVONMOUTH 132kV SUBSTATION SITE


PLAN 13/NG/0261 (PINS SHEET 37)

C
L C
L C
L

CSE DC CSE CSE CSE

SECTION B - B

B MAY '14 FOR DCO SUBMISSION CFK LD JB

A AUG '13 FOR S.42 & S.47 GT JB PB


CONSULTATION

ISSUE DATE COMMENTS DRAWN CHK'D APP'D

TITLE:

AVONMOUTH 132kV SUBSTATION


SITE ELEVATIONS

PINS SHEET 38 OF 70

NG INVESTMENT No. APPLICATION No.


CAD
C
L C
L C
L

20897 EN020001
A1
CSE CSE CSE DC CSE
NG DRAWING No. WPD DRAWING No. SCALE

1:250
13/NG/0262 A110186
SECTION C - C SECTION D - D ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

COPYRIGHT NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION PLC.
Site Map
Mud
Mud

NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER


Mud

Mud

Mud

Mud

DESIGN DRAWINGS
MLW

a
Drin
Mud

MLWS

ai
Dr n
Mud
an
Me HighWa MLW
t
er
Mud

Dr
ai
n
oConstBdy
Bor

D
ai

ra
Dr
Bdy

i
UA&CP

n
(REGULATION 5(2)(o))
ns,
t
CoCo

MLW

ai
Dr n
SHEET 39 OF 70
NORTH SOMERSET COUNCIL Drain
8.2m

FB
Pond
Portbury Wharf
Drain

Tk

Tk
Sewage Treatment Works

Dr
ain
Tr
ack
Pond
Dr
ain
Pond

45

D
rai
n

37
5
Pond

WREN GARDENS

13
41

24
39 47
6

23
Pond

33
7.3m

21

31
20

6
n
15 ai

n
Dr

ai
Dr

Dr
SHER RO AD

ai
ETL

n
27

21
El Sub Sta Pond

2
D
ra

Tr
in

NGFI

ack
14
DUNLIN DRIVE

KI
Pond
1

4
15 10

Def
9
FIELDFARE AVENUE

5
Track

1
FB

BRAM BLI
124

1
128

Playground
Portbury Wharf

NG LANE
PHOENIX WAY
ETL
Pond
177 169 133

4
139
STONECHAT GREEN

ain
Dr
120a
1
159 8
165

Water
143

120

Dr
123

116

ai
Dr

n
ain
PHOENI
STRAINER
11
13 15
5 1
9

Tr
TEAL WAY Stone

X W AY
Drain

ac
3 Pond
1

k
6 2
10 12
REDPOLL DRIVE

110
R ain
Dr

STRUCTURE
121 E
D
P
O Water Pond
2 L
L
D
R

1
11
IV
E

0
2
Stones
C
U 5

100
R 11
L
E 1
W Linnet 2

n
rai
4
3
P
LA Gardens

D
C 1 7
14
E 1
0
2 THE MARTINS

CSE
7.6m

2
8

5
10 1
1 14 Stone
1
5
1
0

ns
de
ar
G 23
et

ain
2
1

7
nn

5
2

n
rai
H
Li

Dr
Stone Camp Site

D
F

29
6 3

IN

11
A
Y (disused)

C
15 W

H
Und
3

ES
T 4

7
13
3

CSE
6
ES

4
1 R 38
C
LD

6
5
O 2
G 8
AY

14
3
W
0

12
T

6
1
S
E
R

18
0
C

1
LD
O
G
ka
ne

5
2a
E

3
S S
da
1
O
C
L B
l
IN O
K

CSE
IS
S

15
Stone

12
7
2
Stone Pond

68
19 27

in

Dr
ra
16
5

ai
D
11

n
NCHES

o
HEFI

6t
T

Pond

1
7

ai
Dr n
19

Atherton House
Stone
15
29

Pond
FENNEL ROAD

4
Stone

SORREL
10

1
27

OAD
ELR
ENN 12.5m

GARDENS
F

PYLON

3
7
14

Dr
ain

5
Pond

Wa
BW39

rdB

18
20
26

dy
16
Springfield

20

ETL
Cottage

3
5
90
24

Def
Pond

ETL
SO a
Drin
RR
28 26
EL Pond
GARDENS

30

41
28
17
S
DEN
13
GAR
49
REL 19
SOR

CSE El Sub Sta

45
64

FENNEL ROAD
34
38

51
62
CSE

42

53
67
CSE

2.
Key

4m hi

1.
WORKS PROPOSED

2m hi
EXISTING - BLACK
FOR 400kV ROUTE

gh PALI
EQUIPMENT TO BE REMOVED - GREEN

gh CATTLE FENCE
OPTION B ONLY
NEW EQUIPMENT - RED

SADE FENCE
CSE - CABLE SEALING END
UNDERGROUND CABLE

D
A A

PYLON
F5

Notes
PYLON
C

G5
CABLE ROUTE SHOWN IS INDICATIVE
1.2m high CATTLE FENCE
ONLY
132kVG
ROU
2.4m high PALISADE FENCE TE
1.
2mhi
ghCA
TTLEFENC
E
SWEDAT
2.
4mh
MAST i
ghPA
LI
SAD
EFENC
E

D
2.
4m hi

CONTROL/
gh PALI
1.

132/
2m hi

Reference Drawings
RELAYROOM
SADE FENCE

33kV

STRAINER
STRUCTURE
gh CATTLE FENCE

CSE PORTISHEAD 132kV SUBSTATION SITE


CSE ELEVATIONS 13/NG/0264 (PINS SHEET 40)
CSE
ACCESS ROAD

PYLON

CSE BW39
400kV ROUTE
CSE
OPTION A - NO
PYLON CSE
W3A WORKS PROPOSED
C

2.
(REFER TO

1.
4m hi

2m hi
EXTRACT FOR

gh PALI

gh CATTLE FENCE
OPTION B)

REPRODUCED FROM ORDNANCE SURVEY MAPS.

SADE FENCE
BY PERMISSION OF THE ORDNANCE SURVEY ON
BEHALF OF THE CONTROLLER HER MAJESTY'S
STATIONERY OFFICE. © CROWN COPYRIGHT
SURF TELECOMS
ORDNANCE SURVEY. OS LICENCE NO. 100048471
COMPOUND

D
GATES
PALI
GATE
FI

SADE
ELD

B MAY '14 FOR DCO SUBMISSION CFK LD JB


ACCESS ROAD ACCESS ROAD
A AUG '13 FOR S.42 & S.47 GT JB PB
CONSULTATION
2.4m high PALISADE FENCE

ISSUE DATE COMMENTS DRAWN CHK'D APP'D


1.2m high CATTLE FENCE
TITLE:

PORTISHEAD 132kV SUBSTATION


SITE PLAN

PINS SHEET 39 OF 70

B B

NG INVESTMENT No. APPLICATION No.


CAD
20897 EN020001
A1
NG DRAWING No. WPD DRAWING No. SCALE

1:500
13/NG/0263 A110188
ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

COPYRIGHT NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION PLC.
NATIONAL GRID (HINKLEY POINT C CONNECTION PROJECT) ORDER
DESIGN DRAWINGS
(REGULATION 5(2)(o))
SHEET 40 OF 70
NORTH SOMERSET COUNCIL

PYLON
PYLON PYLON
W3A
BW39 BW39

400kV ROUTE OPTION A - NO PYLON G5 REMOVED FOR CLARITY


WORKS PROPOSED FOR
WORKS PROPOSED (REFER
400kV ROUTE OPTION B ONLY
TO EXTRACT FOR OPTION B)

Key

EXISTING - BLACK
EQUIPMENT TO BE REMOVED - GREEN
NEW EQUIPMENT - RED
CSE - CABLE SEALING END

CSE CSE

SECTION A - A SECTION A - A SUBSTATION FENCE PART


(OPTION B) (OPTION A)
SHOWN FOR CLARITY

PYLON
PYLON PYLON
W3A
BW39 BW39 Notes

400kV ROUTE OPTION A - NO WORKS PROPOSED FOR


WORKS PROPOSED (REFER 400kV ROUTE OPTION B ONLY
PYLON G5 REMOVED FOR CLARITY
TO EXTRACT FOR OPTION B)

Reference Drawings

PORTISHEAD 132kV SUBSTATION SITE


PLAN 13/NG/0263 (PINS SHEET 39)

CSE CSE
SECTION B - B SECTION B - B
(OPTION A) (OPTION B)

PYLON
W3A

PYLON PYLON
BW39 BW39
400kV ROUTE OPTION A - NO WORKS PROPOSED FOR B MAY '14 FOR DCO SUBMISSION CFK LD JB
WORKS PROPOSED 400kV ROUTE OPTION B ONLY A AUG '13 FOR S.42 & S.47 GT JB PB

PYLON G5 REMOVED FOR CLARITY CONSULTATION

ISSUE DATE COMMENTS DRAWN CHK'D APP'D

TITLE:

PORTISHEAD 132kV SUBSTATION


SITE ELEVTIONS

PINS SHEET 40 OF 70

NG INVESTMENT No. APPLICATION No.


CAD
C
L C
L C
L
C
L C
L C
L C
L C
L C
L C
L C
L C
L

20897 EN020001
A1
CSE CSE CSE CSE CSE CSE CSE CSE CSE CSE CSE CSE
NG DRAWING No. DRAWING No. SCALE
SECTION C - C SECTION D - D SECTION D - D
1:250
(OPTION A) (OPTION B) 13/NG/0264 A110190
ISSUE

SHEET 1 OF 1 SHEET 1 OF 1 B

COPYRIGHT NOT TO BE REPRODUCED WITHOUT WRITTEN PERMISSION OF THE NATIONAL GRID ELECTRICITY TRANSMISSION PLC.

Das könnte Ihnen auch gefallen