Metso Minerals
CERTIFIED
FINAL
INDEX PAGE
1.0 Scope 4
2.0 Purpose 4
1.0 SCOPE
2.0 PURPOSE
The purpose of this Quality Plan is to outline a system of controls, which will assure the
quality of the products manufactured by Metso Grinding.
3.1 General
The organizational structure of the Metso Project is illustrated (see Attachment A). This
chart depicts communication paths and relationships of the Project Team.
4.1.2 The Contract Manager will direct and control the Project within the limitations imposed by
the budget, schedule and Project specifications.
4.1.3 The Contract Manager, in conjunction with Marketing will define the requirements of the
contract. The Contract Manager will coordinate contract related activities with relevant
department heads contract related activities.
4.1.4 The Contract Manager is responsible for overall business decisions related to the planning
and control of the Project.
4.1.5 The Contract Manager will establish communications with the client and report progress
within the timeframe specified in the contract.
4.2.1 The Engineering Manager will provide department resources required to effectively meet
the contract requirements.
4.2.2 The Engineering Manager, with assistance of the Quality Assurance Department, reviews
and establishes what actions to be taken when deviations are found.
_______________________________________________________________________________
STD NO.: E-0029
PROJECT PAGE: 5 OF 7
QUALITY APPROVED BY: RLW
PLAN ISSUE DATE: 10 Oct 2001
SUPERSEDED BY:
_______________________________________________________________________________
4.3.1 The Project Design Engineer will be responsible for those tasks assigned by the
Engineering Manager.
4.3.2 Coordinate and monitor the overall design and drawing activities for the project.
4.3.3 Notify the Contract Manager to ensure effective communication by distribution of reports,
correspondence and personal contact.
4.3.4 Ensure that Project records are maintained by the established filing system.
4.3.5 Ensure that the design of the equipment is compatible with the agreed contract
requirements and is completed within time specified.
4.3.6 Issue engineering and material specifications, including all quality requirements for
Purchase Orders.
4.4.1 The Quality Manager is responsible for carrying out scheduled Quality Audits.
4.4.5 Coordinate and monitor Quality Assurance activities for the Project.
4.4.6 Issue relevant Quality Inspection Plans (QIPS) for the Project.
4.5.1 The Purchasing Manager will coordinate and supervise Project purchasing activities.
4.5.2 Ensure that quotes are reviewed for compliance with scheduling, delivery and budget
considerations. Coordinate compliance with technical specifications through Engineering.
4.5.3 Ensure Metso and client quality, technical and commercial requirements for goods and
services are passed on to vendors as applicable through purchasing documents.
4.5.4 Ensure potential subcontracts are reviewed relevant to the scope of work described in the
contract documents to ensure:
_______________________________________________________________________________
STD NO.: E-0029
PROJECT PAGE: 6 OF 7
QUALITY APPROVED BY: RLW
PLAN ISSUE DATE: 10 Oct 2001
SUPERSEDED BY:
_______________________________________________________________________________
d) The subcontractor has a quality system acceptable by Metso for the scope of
supply.
The contract and tender documents will be reviewed to verify concurrence. Any
discrepancies will be addressed with the client and resolved. Contract review will be
conducted in accordance with Metso STD E-0002 Section 19.0.
6.1 Design and verification activities are planned and will be reviewed during the course of the
contract.
6.2 Design changes originating from the Client will be reviewed upon receipt by the relevant
personnel.
6.3 Design changes/queries originating from the Project team and/or subcontractors will be
addressed to the client through the Contract Manager.
6.4 All design changes will be reviewed and approved by the Project Design Engineer before
the change is implemented.
7.1 All Project documentation subject to document control will be processed through the
Contract Manager.
7.2 Drawings are checked and released under authorization of the Project Design Engineer.
7.3 Drawings released from the York office are issued under cover of a Document Transmittal
Form.
8.1 Specific material, which requires identification and traceability, will be marked or tagged.
Specific material, which requires identification and traceability, will be marked or tagged in
accordance with the subcontractors’ procedures.
_______________________________________________________________________________
STD NO.: E-0029
PROJECT PAGE: 7 OF 7
QUALITY APPROVED BY: RLW
PLAN ISSUE DATE: 10 Oct 2001
SUPERSEDED BY:
_______________________________________________________________________________
9.1 Quality Inspection Plans (QIPs) will be developed in accordance with requirements of each
contract. QIPs will be reviewed by Metso and the client prior to use.
9.2 Inspection surveillance points required by Metso and the customer will be identified on the
QIP.
10.1 All inspection, measuring and test equipment to be used on the Project by Metso will be
verified as calibrated in accordance with Metso Procedure E-0002 Section 16 and D-0028.
10.2 All inspection, measuring and test equipment to be used on the Project by subcontractors
will be verified as calibrated to recognized national standards and supported by copies of
calibration certificates.
11.1 Quality Inspection Plans (QIPs) and other quality records will be maintained to provide
identification of inspection and test status. The availability and compliance of such
documentation will be verified before release of the product.
13.1 Corrective action relating to product non-conformances will be reviewed by the Quality
Assurance Manager and the Engineering Manager.
15.1 Project records will be stored and retained for 10 years from time of delivery.
___________________________________________________________________________________
STD NO.: E-0029 ATTACHMENT A
PROJECT PAGE: 1 OF 1
QUALITY APPROVED BY: RLW
PLAN ISSUE DATE: 10 Oct 2001
SUPERSEDED BY:
____________________________________________________________________________________________________
PROJECT ORGANIZATION
PROJECT
ORGANIZATION
MANAGER OF PROJECTS
Jeffery Claycomb
MECHANICAL ELECTRICAL
ENGR ENGR
Joshua Wills David Suskie
STRUCTURAL ANALYSIS
Ken Schultz
CONTRACT
ADMINISTRATION
Annette Wilt
Q.A. TECHNICIANS
INSTALLATION SERVICE
Supplier Quality Audit Questionnaire
Bafor Construction, which was started to operate in Izmit bay Industrial Zone in 1994, has undertaken
execution of large projects by its customer-focused quality policy and obtained ISO 9001 quality
management system certificate in 2003.
It continues to operate in its factory established in Izmit/ Ac su with 6.000 m² indoor and 16.000m²
open working area and its expert staff.
The base of Bafor’s quality policy is consist of organizing and using of our sources efficiently to satisfy our
customers altering and developing demands and needs on time and in a required manner, being a reliable and
constant make by establishing a friendship with our customers, which never ends at the end of the business,
maintaining our operation by following the applicable technical standards and codes as well as in a manner that
labor health and occupational security and environmental protection requirements are met, recovering our
management system structure continuously to adapt to our sector’s altering requirements in the quickest way
and keeping a structure, which presents the highest guarantee at every stage of our production and service;
and these are declared as an undertaking.
BAFOR aat, considers the people and the environment to be the most valuable asset in all
activities. In this respect, in order to minimize loss of any kind regarding our environment, our employees and
related parties;
1/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
GENERAL
Item Requirement / Query Circumstance
Has the company got a valid ISO 9001
GEN-1 certification? Yes, valid till 23rd December 2015.
(if yes, please submit the copy)
Has the company got any manufacturer ISO 3834-2, Expire date: 13.03.2017
GEN-2 approval? ISO 1090-2: Expire date: 10.06.2015
(if yes, please submit the copy)
Has the company got organization chart per Yes, submitted in Turkish only. Also tasks and
GEN-5 specified tasks and responsibilities? responsibilities is attached.
(if yes, please submit the copy)
How are failed products defined and Each unit has scrap stations for sem-finished items,
GEN-13
seperated? Assembled parts are corrected at work place.
2/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
Conventional Measurement
Which inspection processes are availble in Non-destructive Tests (all in-house except RT)
INS-2
the company? Hydrostatic Pressure Test
Surface Treatment Inspections (blasting and paint)
One welding engineer per ISO 14731
Has the company got inspector(s) certified
One inspector for MT, one for UT and VT inspections
INS-3 by notified body?
per ISO 9712.
(if yes, please list and submit copy certificates)
Two inspectors for paint.
Have the company outsourced inspection For RT, Deka Inspection Co and Imkosan AS
INS-4 services? For destructive testings, END Inspection Co
(if yes, please list outsourced services and suppliers)
Who is the responsible for quality All QC inspector documents their activities,
INS-10
documentation preparation and approval? QA/QC Manager approve them at the end of projects.
3/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
Mechanical Cutting
Oxyfuel Cutting
Plasma Cutting
Plate Bending
Plate Rolling
Pipe and Beam Bending Machine
Which production processes are available Welding Edge Bevelling
PRO-2
inhouse? Welding Processes (+ UP / SAW Boom)
Local Heat Treatment Machine (6 channel resistant)
Beam CNC drilling machine
Automatic Blasting Machine
Manual Blasting Machine and seperated shop
Manual Painting and seperated paint shop
PRO-3 What is the capability of above processes? Please see attached equipments list.
111 - E / SMAW
141 - TIG / GTAW
Which welding processes are in usage at 131 + 135 - MIG + MAG / GMAW
PRO-4
the company? 136 - FCAW
121 - UP / SAW
78 - B / SW (Stud weld)
Who is responsible person for the welding Fatih Kam (Welding Engineer)
PRO-5
work? Ayhan Mamak (Welding Foreman)
4/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
Has the company carried out audits at No, the company makes supplier evaluation at
PRO-21 suppliers? the begining and during each outsourced item
(if yes, please submit reports) inspections.
Are any inspection activies done before or Outsourced items be checked at the supplier
PRO-22
after recieving the outsourced items? workshop when delivered.
5/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
Which HSE eqipments for employess are All required HSE equipments are being provided
HSE-5
provided by the company? by Bafor.
Has the company got penalty regulation for Punishments are being declared to workers
HSE-6 the employees don't follow HSE program? by Board.
(if yes, please submit)
6/7
Created by: Ali Osman Karsan (SQM), 21.02.2014
Supplier Quality Audit Questionnaire
CONCLUSION
General
Bafor has started to work with Metso for RCS tanks manufacturing for Process Equipment, Sala at end of 2012.
First they made RCS tanks for Garpenberg project. They made very good job in very tight schedule except some
minor issues. And then some more RCS tanks for Rotem and El-Halasa projects, process tanks for Majdanpek
project, cone thickeners for LKAB which made by duplex stainless steel plates. They are mainly the first choice
supplier of Process Equipment, Sala for projects locates close to Turkey. They made one project for Pyro,
Danville. It was very urgent order for Russia and a combustion chamber and its ducts completed in very short
time. Also Bafor is a approved supplier of System, Macon. They make a flotation column for Mondo project
nowadays. As far as Bafor made satisfactory jobs for mentioned PLs above.
- Bafor Quality Control team is very experienced about various production processes.
- They are familiar work with ASME code criterias besides European standards.
- Only enlargement of Quality Team looks necessary for quality. They need to work over capacity during rush
periods.
7/7
Created by: Ali Osman Karsan (SQM), 21.02.2014