CONSERVATION OF OLD FREE MASON’S
LODGE / ESTABLISHMENT OF WILD LIFE
MUSEUM KARACHI
Masonry Walls
Servant Quarters
Wash Rooms
Marble & Mosaic Tiles
RCC ceilings
Replacement of Grills
Electrification, Plumbers & Sewerage Work
Wash Rooms, Servant Quarters
Newly concrete Structure
12
Existing Ground Floor
14
15
16
Proposed Site Plan 17
Proposed Ground Plan
18
Proposed First Floor
19
Proposed First Floor
(Flooring) 20
Proposed Roof Top21
Proposed Section 1
22
Proposed Section 2
23
Cafeteria, Lecture Hall ,Rest Rooms
24
Work Plan for Entire Building
STONE WORK
PLUMBING WORK
ALTERATION OF ARCHES
26
ISSUE: PILASTER REMOVING
27
REMOVING OF INNER LIBARAY’S
PILASTER
28
LIME PILASTER
1. Lime
2. Jute
3. Sand
4. Water
29
APPLYING NEW LIME PILASTER
ISSUE: TRACES of RISING DAMPNESS
31
DRAIN FOR CONTROLLING A drain was excavated to control rising
dampness in parallel with the foundation
RISING DAMP of the building
32
REMOVAL OF WOODEN PARTITION
BEFORE AFTER
33
REMOVAL OF CORRUGATED GI SHEET
Additional roof of GI sheets at verandah or passages are removed
and it will serve as open to sky which was its original form
AFTER BEFORE
34
Removal of improper Installation of Air Conditioning Units:
35
REMOVAL OF WASH ROOM AREA
AFTER BEFORE
37
REMOVING OF EXISTING
ECLECTIC CHANNELING
WIRING
Removing of existing
eclectic
channeling wiring is
happening from the library
as the wires are damage and
new installation will be done
of electric wiring
38
UNWANTED VEGETATIONS CUTTING
39
BEFORE
AFTER UNWANTED VEGETATIONS CUTTING
REPLACING PLINTH’S STONE
After Before
MANUAL CHIESELING OF DRESSED STONE
AFTER BEFORE
46
MORTAR POINTING
Causes to the erosion of Three types of Sampling of grouting is done
mortar joint is presence of between the stone block
salt, crystallization, scouring 1. Flash
action of winds; and 2. Recessed
disintegrating effect of 3. Ejected
plants growing on a wall and One of it will be applied on the walls wherever
water penetration leading to necessary
the concentration of
moisture and dampness.
47
POINTING OF STONE MASONRY
Due to later intervention a
layer of cement pilaster
which was used earlier is
removed now
48
ARCHES ALTERATION
BEFORE
49
DURING WORKING
AFTER BEFORE
JEFFERY DESIGN
AFTER BEFORE
STONE CHIESELING AT FACADE
AFTER BEFORE
NEW FLOOR IS INSTALL
Before After
FLOORING
AFTER
BEFORE
57
TERMITE ATTACKS WOOD:
Insect or termite attack is a major
problem in wild life building it happens
in a damp and digestible timber. It
causes soften a timber and form
further cracks
it is dangerous to leave the timber
which may insects or termite hole
because they may soften the timber
and form further cracks.
The decayed timber is removed and
new frames were fixed with anti termite
solution
58
NEW FRAMES OF DOORS & WINDOW’S
Some of the frames are badly
abused with serious damaged
on surfaces and deteriorated;
leading to further structural
problem and unsafe to
occupants the main cause to the
deterioration are insects and
termite attacks and unqualified
human intervention
59
NEW PANELS AND FRAMES FOR WINDOWS
BEFORE
DURING WORKING
62
PARAPET AT FIRST FLOOR
63
AFTER BEFORE
WATER OUTLET PIPE
USED AT THE PARAPET
BEFORE
DURING WORKING 65
Removing of inner library's pilaster
AFTER BEFORE
66
CENTRAL HALL OPENING ON TOP OF
DOOR
Before After
RE-CREATION OF MISSING
ARCHITECTURAL FEATURES
RE-STRENGTHING OF CENTRAL STAIRCASE
Temporary support for central
staircase
Is provided as the staircase is leaning
along one side
BEFORE AFTER
CLEANING OF PLAQUE
AFTER BEFORE
THANK YOU