Same as in item A-1(a) but for excavation done at all depths with
A-1( b) the help of excavator provided with hydraulically operated rock
breaker ranging aboveEX-300uptoEX-700 an equivalent or for
excavation done by any other mechanical means as approved by
the Engineer, all tools, plant and labour complete in all respect:
Rate
b)back filling in layers not exceeding 300mm thickness Cum only
including dozing, levelling, dressing and compacting
complete in all respects as directed by the Engineer
Cum Rate
c) plinth filling in layers of 150mm thickness where only
special compaction is required including water in
gland consolidating by mechanical means as per
specification and directions of the Engineer.
A. Within Works
Cum Rate
a) foraleadbeyond1kmbutnotexceeding4km only
A-4
Cum Rate
b) for a lead beyond 4km but not exceeding 8km only.0.0
B. Outside Works
Cum Rate only
a)For a lead up to 10km.
4. All concreting work except fly ash concrete shall be done with Portland
slag cement conforming to IS: 455. For fly ash concrete 43/53 grade
OPC shall be used.
7)Cement and aggregates shall be supplied free of cost to the party for all
items
Rock must be clean, sufficiently durable, hard, non friable and not show
any signs of weathering .Gabion fill is normally a graded fill of between
100 to 200mm in diameter with a nominal 6% smaller or larger. The
grading can be tightened to 80 to 150mm providing the control of the
grading is tight. Stones smaller than the mesh will not be contained by it.
The grading is important to ensure that voids within the unit are
minimized otherwise settlements can occur.
1. Mechanical Properties:
2. Physical Properties:
a. Zinc Coating: The coating weight shall be heavily coated and soft
type conforming to the requirements of specification IS 4826:1972.
e) Salt spray exposure — The PVC shall show no effect after 3 000 h of
salt spray exposure in accordance with IS 13360 (Part 8/Sec 14).
SQM 5100
E-3 GABION GEOTEXTILE FILTER
660
UNPLASTICIZED POLYVINYL CHLORIDE (UPVC) SINGLE WALL CORRUGATEDRMT
PIPES FOR DRAINAGE or equivalent conforming IS 9271:2004.
E-4
PRIME COAT
75mm thick in two layers shall be laid over granular sub-base conforming
F-2 CUM 375
clause 502.2 MORTH specifications for Roads and Bridge Works.
Bituminous Macadam
65mm thick with coarse and fine aggregate bound with bitumen
F-3 conforming clause 504.2 MORTH specifications for Roads and Bridge CUM 160
Works.
Cast in situ CC of grade M20 as per section 1700 of MORTH specifications 505
SQM
for Roads and Bridge Works. The minimum size of the panels shall be
specified as per drawings
F-4