2. Wafer Probing.
As shown previously in Figure 1, this process occurs Figure 3. Description of The Assembly Process.
between wafer fabrication and assembly. This is where the
functionality of the device performing thousands of electrical It is a requirement that wires thinner than a human hair
tests is verified, by means of special microprobes. There are (for microcontrollers, the typical value is 33 microns) must
two different tests in the wafer probing: connect chips to the exterior and enable electronic signals to
be fed through the chip. The process of connecting these thin III. APPLICATION OF IE TOOLS AND TECHNIQUES AND
wires from the chip’s bond pads to the package lead is called POTENTIAL PROBLEMS / IMPROVEMENTS
wire bonding as shown in Figure 4.
Preventive Maintenance
The wirebonding process is the bottleneck, since it has The proposed layout is shown in Figure 7 below. Unlike
the longest cycle that limits the whole assembly line. Thus it the original layout, the display of viands is available prior
dictates the production rate of the company. From the time entry of queue. It means that the employee has already
study appended in Appendices 7 and 8, the average production decided what choice of food he wants upon entry. As
rate is 2,131 units per hour. As shown in the above summary, proposed, there are stainless steel barriers between to
the company has lost 3.60 to 8.65 hours, causing a loss of concessionaires. Employee will need to pay first before he can
around 7,672 to 18,433 units. go to other concessionaires.
Queuing Analysis
B1F2
B2F1
B. Appendix 2 – Time Study for the Preventive Maintenance for ICOS T120 PIR136
STMICROELECTONICS
STMICROELECTONICS
Analyst: Mher Karizze Anne R. Narciso Machine No.: HANSEO BAKE OVEN
Technicians: Frederic Bongolan & Eric Jason Zapanta Machine ID: PBK008
Area of Study: B2F1 - Finish Machine Operation: Curing/Baking
Obs. Date/Time 30-Jun-17 0830H-1730H* Frequency of PM: 13 weeks
*Note: Time study inclusive of non-value adding activities such as travel & idle time
D. Appendix 4 – Time Study for the Preventive Maintenance for ICOS T120 PIR130
STMICROELECTONICS
Pre- Supervisor approval/ Lead tech initial report finding approval, 1:30:00
1:43:11 103.18
1 maintenance CMMS transaction, Perform PM preassessment of machine 8:00:00 AM 9:30:00 AM
2 Activities ICOS, handler, MVS6000 Backup 9:30:00 AM 9:43:11 AM 0:13:11
3 Machine front and back cover removal 9:43:11 AM 9:50:36 AM 0:07:25 0:07:25 7.42
4 Vacuum Cleaning 9:50:36 AM 10:10:31 AM 0:19:55 0:19:55 19.92
Break Time (10:00 AM - 11:00 AM)
5 HDD Backup 11:12:38 AM 12:13:19 PM 1:00:41
6 Travel to PM Room 11:21:40 AM 11:22:59 AM 0:01:19
HDD Backup 0:11:20
7 IDLE 11:22:59 AM 11:34:19 AM
and Filter
8 replacement Travel to machine 11:34:19 AM 11:35:49 AM 0:01:30 1:00:41 60.68
9 (Simultaneous) Vacuum Cleaning 11:35:49 AM 11:37:08 AM 0:01:19
10 Pickup cleaning, servicing 11:37:08 AM 11:45:24 AM 0:08:16
11 YZ1 & YZ2 Filter replacement 11:45:24 AM 12:13:19 PM 0:27:55
12 LM guide cleaning and lubrication at X1-X5, Y and Z1 & Z2 12:13:19 PM 12:58:25 PM 0:45:06 0:45:06 45.10
13 Taper maintenance (taper track, seal shoe and cutter checking) 12:58:25 PM 1:07:59 PM 0:09:34 0:09:34 9.57
14 End of shift 5S 1:07:59 PM 1:20:00 PM 0:12:01
15 activities Make report, etc. 1:20:00 PM 2:00:00 PM 0:40:00 0:52:01 52.02
B Shift, Technician: Eric Jason Zapanta
16 Taper maintenance (taper track, seal shoe and cutter checking) 2:29:21 PM 2:57:39 PM 0:28:18 0:28:18 28.30
17 Get tools from PM Room 2:57:39 PM 3:05:51 PM 0:08:12 0:08:12 8.20
18 Fitting replacement Y1 3:05:51 PM 3:33:44 PM 0:27:53 0:27:53 27.88
19 QRM/Mechanical Condition Checking 3:33:44 PM 4:24:09 PM 0:50:25 0:50:25 50.42
20 Belt tension checking 4:24:09 PM 4:35:00 PM 0:10:51 0:10:51 10.85
21 Cleaning/removal of excess lubrication, installation of cover 4:35:00 PM 4:41:55 PM 0:06:55 0:06:55 6.92
22 Machine power-up 4:41:55 PM 4:50:31 PM 0:08:36 0:08:36 8.60
23 Initialization 4:50:31 PM 4:55:31 PM 0:05:00 0:05:00 5.00
Break Time (5:00 PM - 6:00 PM)
72 Checking of Reference Point 5:55:00 PM 6:35:00 PM 0:40:00 0:40:00 40.00
73 Reference Mechanical alignment/teaching 6:35:00 PM 7:15:00 PM 0:40:00 0:40:00 40.00
74 Vision checking in preparation for wizzard 7:15:00 PM 8:15:00 PM 1:00:00 1:00:00 60.00
75 Full handler callibration 8:15:00 PM 9:35:00 PM 1:20:00 1:20:00 80.00
76 Checking of individual pickup and vacuum readings 9:35:00 PM 10:05:00 PM 0:30:00 0:30:00 30.00
77 PBFT Testing 10:05:00 PM 10:25:00 PM 0:20:00 0:20:00 20.00
78 Initial buy-off/checking of pick-up tray 10:25:00 PM 11:25:00 PM 1:00:00 1:00:00 60.00
79 Vision teaching (with process group) bottom/Mark/VA/OC/TCI/TSI 11:25:00 PM 12:25:00 AM 1:00:00 1:00:00 60.00
80 Checking of pick-up at X3 and drop at taper 12:25:00 AM 12:45:00 AM 0:20:00 0:20:00 20.00
81 Fine tuning/adjustments of af delay, offset 12:45:00 AM 1:25:00 AM 0:40:00 0:40:00 40.00
82 MUBA checking and data gathering 1:25:00 AM 3:25:00 AM 2:00:00 2:00:00 120.00
83 1st reel checking at VMI 3:25:00 AM 3:45:00 AM 0:20:00 0:20:00 20.00
84 Online checking with setup checklist 3:45:00 AM 4:05:00 AM 0:20:00 0:20:00 20.00
85 LS certification release to production 4:05:00 AM 5:25:00 AM 1:20:00 1:20:00 80.00
Total Working Time 19:45:42
Less IDLE Time 19:36:08
Total Working Time (HOURS) 19.6022
Total Working Time (MINUTES) 1176.13
Total Machine per day 1.2244
*Note: Time study inclusive of non-value adding activities such as travel & idle time, data captured is only from 8:00 AM - 5:30 PM thus incomplete since the process exceeded regular shift
E. Appendix 5 – Time Study for the Preventive Maintenance for ICOS T640 PIR641.
STMICROELECTONICS
0:26:25
1 Pre- Supervisor approval/ Lead tech initial report finding approval 8:00:00 AM 8:26:25 AM
0:32:50 32.83
2 maintenance Pre-PM assessment - Check TPM alarm history 8:26:25 AM 8:32:50 AM 0:06:25
Activities CMMS transaction 8:32:50 AM 8:34:36 AM 0:01:46
3 Replace Z1, Z2, Z4 & idle Station vacuum filters 8:34:36 AM 8:55:24 AM 0:20:48 0:20:48 20.80
4 Temp. Get pyrometer to callibrate temperature 8:55:24 AM 8:59:40 AM 0:04:16
0:30:36 30.60
callibration Check taper temperature 8:59:40 AM 9:26:00 AM 0:26:20
5 Machine power down 9:26:00 AM 9:27:05 AM 0:01:05 0:01:05 1.08
6 Hard disk backup 9:27:05 AM 10:37:05 AM 1:10:00 1:10:00 70.00
Break Time (10:00 AM - 11:00 AM)
7 Phonecall 10:37:05 AM 10:48:09 AM 0:11:04 0:11:04 11.07
8 Continue replacing Z1, Z2, Z4 & idle Station vacuum filters 10:48:09 AM 11:05:13 AM 0:17:04 0:17:04 17.07
9 Vacuum Cleaning 11:05:13 AM 11:35:49 AM 0:30:36 0:30:36 30.60
10 LM guide cleaning and lubrication at X1-X5, Y and Z1, Z2 & Z4 11:35:49 AM 11:50:00 AM 0:14:11 0:14:11 14.18
11 Cleaning, scanning for virus 11:50:00 AM 1:08:22 PM 1:18:22 1:18:22 78.37
12 Ionizer cleaning and ESD checking, Mahine power up 1:08:22 PM 1:47:44 PM 0:39:22 0:39:22 39.37
14 End of shift 5S 1:47:44 PM 1:49:29 PM 0:01:45
16.75
15 activities Make report, etc. 1:49:29 PM 2:04:29 PM 0:15:00 0:16:45
B Shift, Technician: Eric Jason Zapanta
16 Idle, other activities, i.e. checking of email 2:04:29 PM 2:20:56 PM 0:16:27 0:16:27
17 Travel to machine 2:20:56 PM 2:22:38 PM 0:01:42 0:01:42 1.70
18 Continue scanning, AV, patch update and Anti-malware update 2:22:38 PM 3:24:21 PM 1:01:43 1:01:43 61.72
19 Continue ionizer cleaning and ESD checking 3:24:21 PM 3:42:29 PM 0:18:08 0:18:08 18.13
20 Left taper maintenance 3:42:29 PM 4:02:56 PM 0:20:27 0:20:27 20.45
21 Right taper maintenance 4:02:56 PM 4:18:16 PM 0:15:20 0:15:20 15.33
22 Other activities, taper maintenance 4:18:16 PM 4:27:37 PM 0:09:21 0:09:21 9.35
23 Continue scanning 4:27:37 PM 4:37:43 PM 0:10:06 0:10:06 10.10
24 ESD/ionizer checking 4:37:43 PM 4:48:28 PM 0:10:45 0:10:45 10.75
25 Writing in Checklist, other activities 4:48:28 PM 4:51:00 PM 0:02:32 0:02:32 2.53
26 Withdraw parts from CSR (Central Storage Room) 4:51:00 PM 5:11:35 PM 0:20:35 0:20:35 20.58
27 ESD/ionizer checking 5:11:35 PM 5:25:38 PM 0:14:03 0:14:03 14.05
Break Time (5:00 PM - 6:00 AM)
28 Checking of Reference Point 6:25:00 PM 7:05:00 PM 0:40:00 0:40:00 40.00
29 Reference Mechanical alignment/teaching 7:05:00 PM 7:45:00 PM 0:40:00 0:40:00 40.00
30 Vision checking in preparation for wizzard 7:45:00 PM 8:45:00 PM 1:00:00 1:00:00 60.00
31 Full handler callibration 8:45:00 PM 10:05:00 PM 1:20:00 1:20:00 80.00
32 Checking of individual pickup and vacuum readings 10:05:00 PM 10:35:00 PM 0:30:00 0:30:00 30.00
33 PBFT Testing 10:35:00 PM 10:55:00 PM 0:20:00 0:20:00 20.00
34 Initial buy-off/checking of pick-up tray 10:55:00 PM 11:55:00 PM 1:00:00 1:00:00 60.00
35 Vision teaching (with process group) bottom/Mark/VA/OC/TCI/TSI 11:55:00 PM 12:55:00 AM 1:00:00 1:00:00 60.00
36 Checking of pick-up at X3 and drop at taper 12:55:00 AM 1:15:00 AM 0:20:00 0:20:00 20.00
37 Fine tuning/adjustments of af delay, offset 1:15:00 AM 1:55:00 AM 0:40:00 0:40:00 40.00
38 MUBA checking and data gathering 1:55:00 AM 3:55:00 AM 2:00:00 2:00:00 120.00
39 1st reel checking at VMI 3:55:00 AM 4:15:00 AM 0:20:00 0:20:00 20.00
40 Online checking with setup checklist 4:15:00 AM 4:35:00 AM 0:20:00 0:20:00 20.00
41 LS certification release to production 4:35:00 AM 5:55:00 AM 1:20:00 1:20:00 80.00
Total Working Time 20:55:38
Less IDLE Time 20:39:11
Total Working Time (HOURS) 20.6531
Total Working Time (MINUTES) 1239.18
Total Machine per day 1.1621
F. Appendix 6 – Time Study for the Preventive Maintenance for ISMECA NX16 PIH004.
STMICROELECTONICS
1 Supervisor approval/ Lead tech initial report finding approval 7:30:00 AM 7:38:27 AM 0:08:27
2 Pre- CMMS transaction/WO entry 7:38:27 AM 7:43:00 AM 0:04:33
maintenance Pre-PM assessment - Check for missing screws, functionality of all 0:56:10 56.17
3 Activities sensors, valves, motors & cylinder functionality, etc. 7:43:00 AM 7:54:09 AM 0:11:09
Machine handler log-in, delete old file, Back up copying (NTI and
4 VISION) 7:54:09 AM 8:26:10 AM 0:32:01 Forgot password
5 Cleaning/replacement of turret vacuum hoses 8:26:10 AM 8:43:54 AM 0:17:44
Break Time (10:00 AM - 11:00 AM)
6 Turret Continue cleaning/replacing turret vacuum hoses 10:52:45 11:31:58 0:39:13 2:35:10 155.17
7 Withdraw materials from CSR (Central Storage Room) 11:31:58 AM 11:52:24 AM 0:20:26
8 Turret maintenance, Lubricate ball cage of pick-up heads 11:52:24 AM 1:10:11 PM 1:17:47
9 Taper Clean/check taping cells and replace vacuum filter 1:10:11 PM 1:18:20 PM 0:08:09 0:08:09 8.15
10 Clean recentering/rotary module and tooling rest 1:18:20 PM 1:31:52 PM 0:13:32
Recentering/
Check/replace recentering/rotary tooling, motor/coder, belt, and 0:28:39 28.65
Rotary Nest 0:15:07
pulley/bearing 1:31:52 PM 1:46:59 PM
11 5S 1:46:59 PM 1:49:39 PM 0:02:40
End of shift
12 Travel to PM Room 1:49:39 PM 1:51:11 PM 0:01:32 0:13:01 13.02
activities
14 Report-making 1:51:11 PM 2:00:00 PM 0:08:49
B Shift, Technician: Refe Aguilar
15 Check email, endorsement from previous shift, other activities 2:00:00 PM 2:32:00 PM 0:32:00 0:32:00 32.00
16 Clean/Check purge bin module, position and parts 2:32:00 PM 2:37:01 PM 0:05:01
17 Purge Bin Other activities (Search for backup files with Sir Young) 2:37:01 PM 2:51:59 PM 0:14:58 0:29:00 29.00
18 Check/replace detection sensors valves, hose/wiring and harness 2:51:59 PM 3:01:00 PM 0:09:01
19 Inspection of critical parts 3:01:00 PM 3:11:00 PM 0:10:00
Bowl Feeder 0:30:00 30.00
20 Cleaning of vibrating bowl assembly and all sensors involved 3:11:00 PM 3:31:00 PM 0:20:00
Inspection of critical parts (Arrestor blade, deadspot and all
0:05:00
21 Linear Track sensors involved 3:31:00 PM 3:36:00 PM 0:20:00 20.00
22 Cleaning of linear track assembly 3:36:00 PM 3:51:00 PM 0:15:00
23 Two-position Inspection of critical parts (motor, tooling, gear, hose) 3:51:00 PM 4:01:00 PM 0:10:00
0:35:00 35.00
24 table Dismantled and cleaning of two position table nest 4:01:00 PM 4:26:00 PM 0:25:00
Check functionality and align nozzle rest and pick up position and
Auto-reject 0:20:00
25 height clearance 4:26:00 PM 4:46:00 PM 0:35:00 35.00
option
26 Check/clean parts on vacuum system for leaks/clogs 4:46:00 PM 5:01:00 PM 0:15:00
Break Time (5:00 PM - 6:00 PM)
Initial offline buyoff 10k and machine fine tuning at bowl feed,
4:00:00 4:00:00 240.00
27 linear/track feeder 2P table, bottom inspection, taper, auto-reject 6:00:00 PM 10:00:00 PM
28 Post- Installation of all machine covers
29 maintenance Filling up of PM card/checklist
30 Activities CMMS Completion 10:00:00 PM 10:30:00 PM 0:30:00 0:30:00 30.00
31 Checklist completion
32 5S
Total Working Time 11:52:09
Less IDLE Time 11:52:09
Total Working Time (HOURS) 11.8692
Total Working Time (MINUTES) 712.15
Total Machine per day 2.0220