Ensure the beveled ends and jacketing is not damaged while pipe laying.
Ensure the leak detection wires are not damaged.
Verify the leak detection wires are in horizontal plane
All installed pipes after pressure testing shall be cleaned and the surface to be
maintained dry.
Pipes shall be insulated in line with manufacturer’s recommendation and as per
specification.
The thickness of the insulation shall be as per the specification.
The Pipes shall be cleaned properly before the application of adhesives on the pipe
surface for sticking insulation and butt joints.
The adjoining sections of insulation shall be butted firmly together and longitudinal
seam of the insulation shall be located at the bottom half of the pipe.
Insulation at the Fittings shall be formed from accurately mitered and trimmed
sections of the approved insulation to ensure close fit to the surface and a uniform
thickness of insulation.
Mitered segments shall be adhered together with approved adhesive
The fittings shall be insulated with the same insulation thickness and shall be site
fabricated.
Verify the insulation & continuity test have been performed & accepted.
Outer casing fittings will be fabricated in HDPE on site, for the pre-insulated pipes.
The size of the outer casing fitting is larger than the outer casing of the pre-insulated
pipe if required. This facilitates easy mounting and overlap of the fitting onto the Pre-
insulated pipe outer casing.
All fittings will be in two halves and are to be fitted or mounted on the pre-insulated
pipe. Polyurethane foam spacers are used if required to provide support to the fittings.
The two valves are held firmly together using nylon strap with jubilee clips.
The top half portion of the fitting will have two holes of ¾” on far ends of the joint to
pour polyurethane liquid chemical. One hole is inlet for the chemical and the other
hole is exit for the overflowing chemical.
Mix the chemicals (2 part) is small quantity in the ratio 1:1
Stir the chemical and immediately pour it through the funnel and wait till the chemical
has expanded to become foam.
When completely filled, the excess chemical will come out through the exit or
overflow hole.
PROJECT: ONE & ONLY ROYAL MIRAGE – PHASE III
CLIENT MAIN MEP
MEP CONSULTANT
CONTRACTOR CONTRACTOR
H.H Sheikh Ahmed
M/s CKR M/s Al Basti & M/s Bilt
Bin Saeed Al
Consulting Muktha Middle East
Maktoum
Engineers
INSTALLATION OF CHILLED WATER PIPING / INSULATION /
PRESSURE TESTING
Close both the holes on the fitting so that chemical foam reaches and fills the entire
volume of fitting and no corner is left empty.
Allow the foam to settle and become hard
Clean the fitting for overflowing chemical and leave it looking clean and tidy