Tabble of conttents 
 
1  SCOPE ................................................................................................................................... 4 
2  REFEREENCE DOCUMENTS ...................................................................................................... 5 
3  TERMS AND DEFIN
NITIONS ..................................................................................................... 5 
4  TECHNIICAL REQUIIREMENTS FFOR THE CO ONNECTION N IN PARALLLEL TO THE  DISTRIBUT TION 
NETWORKSS ................................................................................................................................ 7 
4.1  Gen ements ............................................................................................................... 7 
neral require
4.2  Con eme ................................................................................................................... 7 
nnection sche
4.3  Norrmal operating ranges ......................................................................................................... 10 
4.4  Imm
munity to dissturbances ........................................................................................................ 10 
4.4.1  Low Voltage Ride Through (LVRT) capabbility ........................................................................................ 10 
4.4.2  ROCOF withstand capabilitty .................................................................................................................. 11 
4.5  Req
quirements ffor the frequ wer system .............................................. 11 
uency stabilitty of the pow
4.5.1  Active powerr response to ffrequency varriations .................................................................................. 11 
4.5.2  Active powerr delivery at under‐frequen cies ........................................................................................ 11 
4.5.3  Remote limitaation of active
e power ....................................................................................................... 12 
4.6  Req
quirements ffor the voltagge stability oof the power system .................................................. 12 
4.6.1  wer capability ...................................................................................................................... 12 
Reactive pow
4.6.2  Reactive pow
wer control mo odes ............................................................................................................. 13 
4.6.3  Power reducttion at increassing voltage .................................................................................................. 15 
4.6.4  Reactive currrent injection during a faultt .............................................................................................. 15 
4.7  Req agement of tthe power syystem ...................................................... 15 
quirements ffor the mana
4.7.1  Connection conditions ........................................................................................................................... 15 
4.7.2  Remote discoonnection ........................................................................................................................... 16 
4.7.3  Automatic reconnection affter tripping ................................................................................................. 16 
4.7.4  Interface Protection ............................................................................................................................... 16 
4.7.5  Monitoring, rremote contro ol and informaation exchangge ...................................................................... 19 
4.7.6  Power qualityy ......................................................................................................................................... 19 
4.8  Mettering ................................................................................................................................. 20 
5  COMPLLIANCE ...................................................................................................................... 21 
ANNEX A. C
A CONNECTIO
ON SCHEME
ES ............................................................................................ 22 
ANNEX B. D
A DEFAULT SEETTINGS OFF INTERFACEE PROTECTIION .................................................... 28 
ANNEX C. L
A LIST OF APP
PLICABLE ST
TANDARDS  FOR EQUIP
PMENT ................................................ 29 
modules ............................................................................................................................... 29 
A.1. PV m
A.2. Inverrters ................................................................................................................................... 30 
patibility) ....................................................................................... 30 
A.3. EMC (Electro Magnetic Comp
ectors ............................................................................................................... 32 
A.4. Cablees and conne
Page | 2
2  
 
 
 
 
 
 
 
biner boxes ........................................................................................................................ 32 
A.5. Comb
A.6. LV sw ear ................................................................................................. 32 
witchgears and controlge
witchgears aand controlggear ................................................................................................ 33 
A.7. HV sw
A.8. Transsformers ............................................................................................................................. 33 
A.9. Electrical installaation ................................................................................................................. 34 
mounting syystem ................................................................................................................ 35 
A.10. PV m
A.11. Grid n ....................................................................................................................... 35 
d connection
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Page | 3
3  
 
 
 
 
 
 
 
1 SCOP
PE

This documeent providess a common  set of requiirements forr solar PV (Photovoltaic)  generating  plants which h 


intend  to  operate  in  paarallel  with  the  LV  &  M
MV  distributio
on  networkss  of  the  Kinggdom  of  Ba
ahrain.  Thesee 
requirementts shall be fu ulfilled irresp
pective of thee presence o of loads in the customer’’s network. E Especially thee 
document defines: 
 Requirements for th he equipmen nt to be usedd for the inte erconnection n of a solar PPV generatinng plant withh 
the distrribution netwwork, 
 Requirements to support the frequency andd voltage staability of the e power systtem when it  is subject to o 
disturbaances, 
 Requirements for th he start‐up, the operationn and the dissconnection of the solar  PV generatin ng plants; 
 Requirements to preevent the so olar PV geneerating plantss from causing disturbannces and dam mages either 
to the distribution network and to the otherr customers cconnected to o the same ddistribution n network;  
 Requirements to preevent the so olar PV generrating plantss from opera ating in paraallel with a portion of thee 
distributtion networkk which has b been disconnnected on pu urpose from the main poower system. 
 
The  presentt  document  is  not  inco ompatible  w with  addition nal  requirem
ments  set  oout  by  otherr  national  & 
&
internationaal standards, network codes or speciific technicall requiremen nts of EWA, aand which m may apply for 
the  connecttion  of  a  solar 
s PV  geenerating  plaant;  especiaally,  the  do ocument  “Reegulations  for 
f Electricaal 
Installationss”  [1] is “app
plicable to alll electrical innstallations iin any premiises fed by thhe Electricityy distribution

system of thhe Kingdom o of Bahrain” a as set out inn  [1] itself. Su
uch document still repreesents the main technicaal 
document to o refer to forr the design of the electrrical installattion of a new w customer oor for the mo odification of 
the installation of an exxisting custom mer. The preesent standaards shall apply only if thhe installatio on includes aa 
solar PV gen nerating plan nt and shall  be intendedd as an extension of  [1] only for whhat concerns the “active”” 
part of the ccustomer’s n network. Forr the “passivve” part of th he customerr’s network,  reference sh hall be madee 
to [1]. 
 
Moreover, itt is not within the scope of the preseent documen nt to: 
 define th he process to o be followeed for the sellection and e evaluation off the point off connection
n; 
 define th he process to o be followeed for the asssessment of the impact o of the conne cting solar PPV generatingg 
plant to the power ssystem; 
 define th he process to o be followeed for the asssessment of a connection n applicationn and its com
mpliance with h 
the pressent standard ds; 
 define teechnical rulees for the isla anding oper ation of isolaated networrks, where noo part of the e distributionn 
networkk is involved; 
 
Unless otherwise expliciitly specified d, the requireements set fforth by thesse standardss shall apply only to solar 
PV  generating  plants  which 
w don’t  have 
h alreadyy  been  approved  by  EW WA  at  the  daate  of  publiccation  of  thee 
standards. 
 
Finally, even hin the scop e of the doccument, the  present doccument intends to stresss 
n if it is not  directly with
the  fundammental  imporrtance  and  necessity 
n fo r  solar  PV  generating 
g plants 
p to  bee  built  in  a  workmanlikee 
manner, which means th he use of pro oducts and thheir assembly in accorda ance with thee internation nal standardss 
commonly  u used  for  thee  planning,  design, 
d instaallation,  operation  and  maintenance
m e  of  solar  PV V  generatingg 
plants. Somee of the mosst relevant do ocuments arre listed in AN NNEX C. 
 

Page | 4
4  
 
 
 
 
 
 
 
2 REFE
ERENCE DOCUMEN
D NTS

[1] Regu ulations  for  electrical  installations,   Ministry  of  Electricity  and  Waterr,  Electricity  Distribution

Direectorate, Second edition, 2004 
[2] IEC  62116:2014 4,  Utility‐intterconnectedd  photovolttaic  inverte ers  ‐  Test  procedure  of  islandingg 
prevvention measures 
[3] IEC  61000‐3‐2:2 2014  Electromagnetic  coompatibility  (EMC)  –  Part  3‐2:  Limitts  –  Limits  for  f harmonicc 
currrent emission ns (equipment input currrent ≤ 16 A p per phase) 
[4] IEC  61000‐3‐12::2011  Electro omagnetic  ccompatibilityy  (EMC)  ‐  Part  3‐12:  Lim its  ‐  Limits  for 
f harmonicc 
currrents producced by equipment conneected to public low‐voltage systems w with input current >16 A A 
and ≤ 75 A per p phase 
[5] Bahrain Grid Cod de, Electricity and Waterr Authority, K Kingdom of B Bahrain, Novvember 2011 1 
[6] IEC//TR  61000‐3‐15:  2009,  Assessment 
A of  low  freq
quency  electromagnetic  immunity  and  a emission n 
requuirements fo or dispersed ggeneration ssystems in LV V network 
 
3 TERM
MS AND DEFINITIO
D NS

Active Poweer ‐ Active Power is the  real componnent of the aapparent power, expresssed in watts or multipless 
thereof (e.g.  kilowatts (kW) or meggawatts (MW W)). In the  te ext this will b
be genericallly referred a as P or Pn inn 
case of ratedd active pow wer of equipm ment. 
Apparent  Po ower  ‐  Is  th
he  product  of 
o voltage  (inn  volts)  and  current  (in  amperes).  I t  is  usually  expressed  in

kilovolt‐ampperes (kVA) o or megavolt‐‐amperes (M MVA) and con nsists of a real componennt (Active Po ower) and an n 
imaginary coomponent (R Reactive Pow wer). In the t ext this will be generically referred aas S or Sn in case of rated d 
apparent po ower of equip pment. 
Maximum A Available Acttive Power O Output – Is t he Active Po ower Output determinedd by the prim mary resourcee 
(for  examplee,  sun  irradiiance)  and  by 
b the  maxim mum  steady‐state  efficie ency  of  the  ggenerating  plant 
p for  thiss 
operating po oint. 
Current ‐ Unnless stated o otherwise, current referss to the root‐mean‐square value of pphase current. 
Delay time  (of a protecction relay) – – Indicates tthe minimum m duration o of a fault dettected by th he protection n 
relay beforee the output of the protection relay iss triggered.
Distributionn system / ne etwork ‐ Is tthe medium  or low voltaage electricitty grid for suupplying elecctricity to thee 
end consum mers; for the sscope of the present doccument and in accordancce with interrnational standards: 
 A Lo ow Voltage (LV) network is a distribuution networrk with nominal voltage llower than 1 1kV AC or 1.5 5 
kV D
DC. The LV neetwork nominal voltage oof the Kingdom of Bahrain is 400/2300V. 
 A M Medium Voltaage (MV) nettwork is a neetwork with  nominal volltage includeed in the ran nge from 1kV V 
AC (1.5 kV DC) u up to 35 kV. TThe MV netw work nominaal voltage of tthe Kingdom m of Bahrain is 11kV. 
Generating  plant  ‐  Is  an  indivisible  set  of  innstallations  which 
w can  generate 
g eleectrical  energy  into  thee 
distribution network and d is compose ed of generatting units, circuits and au uxiliary servi ces. 
Interface  Prrotection  (IP P)  ‐  The  electrical  proteection  required  to  ensure  that  eithher  the  gene
erating  plant 
and/or  any  generating  unit  is  disco onnected  forr  any  event  that  could  impair  the  iintegrity  or  degrade  thee 
safety and reeliability of tthe distributiion network.. 
Islanding  ‐  SSituation  whhere  a  portion  of  the  d istribution  network, 
n conntaining  gennerating  plannts,  becomes 
physically  d
disconnected d  from  the  rest  of  the  distribution n  network  and  one  or  more  generrating  plantss 
maintain a ssupply of elecctrical energgy to such isoolated part o of the distribu
ution networrk. 
Loss Of Maiins (LOM) –  Represents  an operatingg conditionss in which a  distribution  network, orr part of it, iss 
on purpose separated frrom the main n power systtem with the e final scope of de‐energiization. 

Page | 5
5  
 
 
 
 
 
 
 
Main  electrricity  meter  ‐    Is  the  de
evice  installeed  at  the  PO
OC  and  whicch  measuress  the  amoun nt  of  electricc 
energy actuaally exchanged by the customer withh the distribu ution networrk. 
Network ‐ P Plant and apparatus connected togeether in orde er to transmit or distribuute electrical power, and d 
operated byy the DSO.  
PV electricitty meter ‐ Iss the device  installed at  the commo on output po oint of the s olar PV gene erating plant 
and which m measures thee total energyy produced ffrom the solar PV genera ating units. 
Point  of  Co
onnection  orr  POC  ‐  Is  thhe  location  at  which  a    solar  PV  ge enerating  pllant  is  connected  to  thee 
distribution network and d where the main electri city meter iss installed. 
Power Facto or ‐ Is the rattio of Active Power to Appparent Power.  
Reactive  poower  capabiility  –  Defin nes  the  reseerves  of  inductive/capaccitive  reactivve  power  which  w can  bee 
provided byy a generatin ng plant/unitt. The reactivve power capability usua ally varies w ith the activve power and d 
the voltage oof the generrating plant/u unit. 
Reactive Po ower ‐ Represents the im maginary com mponent of tthe apparentt power, usuually expresssed in kilovar 
(kVAr) or Meegavar (MVA Ar).  
ROCOF – Rate of changee of frequenccy usually ex pressed in H Hz/s. 
Switch – Meechanical deevice capable e of making,, carrying an nd breaking ccurrents in nnormal circu uit conditions 
and,  when  sspecified,  in  given  opera ating  overloaad  condition ns.  In  additio
on,  it  is  able   to  carry,  fo
or  a  specified

time, currennts under speecified abnorrmal circuit cconditions, such as short‐circuit condditions. 
THD – with  reference to o an alternatting quantityy, it represents the ratio o of the r.m. s. value of tthe harmonicc 
content to the r.m.s. value of the fun ndamental c omponent o or the referen nce fundameental compo onent. 
Voltage ‐ Unnless stated o otherwise, voltage referss to the root‐mean‐square value of pphase‐to‐pha ase voltages. 
   

Page | 6
6  
 
 
 
 
 
 
 
4 TECHHNICAL REQUIREM
R MENTS FO
OR THE CONNECT
C TION IN P
PARALLEL
L TO THE
E
DISTR
RIBUTION
N NETWORKS

4.1 Gene
eral requiirements
A solar PV ggenerating pllants shall be e connected  to the netw work at an ap ppropriate p oint, called tthe POC. It iss 
the responsibility of EW WA to design  a suitable pprocess whicch determine es the approopriate POC  and assesses 
the capacityy of the netw work to host the connectting solar PV V generating plant at thatt POC whilstt maintainingg 
a safe and seecure operattion of the network for aall operating conditions.
 
If the resultss of such proocess put in evidence th at the conne ecting solar PV generatinng plant is likkely to causee 
the networkk to possibly operate outtside of EWA A statutory performance standards, EEWA has the right to turn n 
down  the  cconnection  application  or  to  proppose  modificcations  (for  example  inn  terms  of  POC  and/or 
characteristics  of  the  so
olar  PV  geneerating  plantt)  or  alternative  solution
ns  (for  exam
mple  in  termss  of  networkk 
reinforcemeents) to enab ble the conne ection. 
 
With  reference  to  the  requirements  defined  i n  the  prese ent  documen nt  and  the  ppossibility  th
hat  different 
requirementts  may  interrfere  with  ea ach  other,  tthe  protectio
on  and  control  devices  oof  a  solar  PV
V  generatingg 
be organized in accordancce with the ffollowing priority ranking
plant shall b g (from higheest to lowestt):  
1. Protection of the generating units; 
2. Protection  of  the  network 
n (interface  proteection  and  protection 
p against 
a faultts  within  the
e  customer’ss 
networkk); 
3. Remote disconnectio on; 
4. Active power respon nse to freque ency variatioons; 
5. Remote limitation of active power; 
6. Remote reactive pow wer control m modes; 
7. Local reaactive power control mo odes. 
 
4.2 Conn
nection scheme
A solar PV generating plant shall be in compliancce with the cconnection rrequirementss of EWA;  and especiallyy 
shall meet thhe following requiremen nts: 
 the  syn nchronization n,  operation
n  and  discoonnection  off  the  plant  under  norrmal  network  operatingg 
conditio
ons,  i.e.  in  th
he  absence  of  faults  or 
r  malfunction ns,  shall  be  done  withoout  conseque ences  to  thee 
statutorry power quaality of the network; 
 the prottection schem mes and settings neededd for the solar PV genera ating plant sshall be coorrdinated with h 
the  netw
work  protecction  scheme es  and  settinngs;  they  sh
hall  therefore  be  agreedd  between  EWA 
E and  thee 
V generating plant ownerr with the folllowing scope: 
solar PV
o faults  and  malfunctions  within  thee  solar  PV  generating  plant  shall  not  impair  the  normaal 
operation off the distribu ution networrk, 
o the  protection  schemes  and  settinngs  for  inte ernal  electrical  faults  m
must  not  jeoopardize  thee 
performancees of the solar PV generaating plant;
o the protection schemes of the solarr PV generatting plant shall be coorddinated with  those of thee 
distribution  network in o order to opeerate properly in case of faults withinn the genera ating plant or 
within the distribution n networks. 
 

Page | 7
7  
 
 
 
 
 
 
 
In  order  too  satisfy  thee  above  reqquirements,  Error!  Refe erence  sourcce  not  founnd.  presentss  the  typicaal 
equipment w which shall b be at least innstalled for aa safe and re eliable interconnection off the solar PV generatingg 
plant with th he distributioon network: 
 The  main  switch  sh hall  be  insta
alled  as  closse  as  possibble  to  the  POC 
P and  shaall  be  comm manded  by  a  a
protection  system  against 
a interrnal  faults1;  the  main  swwitch  is  also
o  used  for  tthe  disconne ection  of  thee 
customeer’s  networkk  from  the  distribution 
d nnetwork;  it  is  possible  to
o  install  up  tto  two  main
n  switches  inn 
order,  ffor  example,,  to  have  twwo  separatee  circuits,  on ne  dedicated d  to  the  cu stomer’s  loa ads  and  onee 
dedicateed to the solar PV genera ating plant.
 The  inteerface  switch  shall  be  installed  in  tthe  custome er’s  networkk  to  separatte  from  the e  distribution n 
networkk  the  part(s)  of  the  custtomer’s  netw work  contain ning  at  least one  solar  PPV  generatin ng  unit;  for  a 
a
solar PVV generating plant with a rated activee power greaater than 11kW, unless eexplicitly agrreed by EWA A, 
only onee interface sw witch shall be used (see aalso §4.7.4). 
 The  unitt  switch  shaall  be  installed  as  elect rically  close  as  possible e  to  the  term minals  of  ea
ach  solar  PVV 
generatiing unit of th he generating plant, for tthe protectio on and the disconnectionn of that generating unit.. 
 
ANNEX  A  presents  typical  connection  schemess  which  can n  be  adopted  for  the  coonnection  of  o a  solar  PV V 
generating  p plant  to  EW
WA  distributioon  networkss.  Different  arrangement
a ts  may  be  uused  if  previo
ously  agreed d 
with EWA. 
 
For each of  the above m mentioned eq quipment, thhe choice of  the type of switch to bee installed (p power relayss, 
contactors o or mechanicaal circuit brea akers, …) shaall be based on: 
 the funcctions the sw witch shall carry out, 
 the charracteristics o of the custom mer’s networrk. 
 
Especially, th he following criteria shall be adoptedd: 
 the main n switch shall be complia ant with the  requirementts of [1]2,  
 the switch(es) of thee generating unit(s) shall  be complian nt with the m manufacturerr’s requirements, 
 Electron nic switches sshall not be u used for pro tective functtions. 
 For solar PV generatting plants cconnected too the MV disstribution ne etwork and w with the inte erface switch h 
on the MMV side of th he plant (Figuure 8), the innterface swittch shall conssist of: 
o three‐polar withdrawable automaticc circuit breaaker operated by an undeervoltage rellease, or 
o three‐polar automatic ciircuit breakeer operated b by an undervvoltage releaase along witth an isolator 
(either upstrream or dow wnstream thee circuit breaaker). 
 For solar PV generatting plants cconnected too the MV disstribution ne etwork and w with the inte erface switch h 
on the LLV side of th he plant or fo or solar PV ggenerating p plants conne ected to the  LV distribution networkk, 
the interface switch shall consistt of: 
o automatic circuit breake er or switch ddisconnectorr operated by an undervooltage releasse, or 
o omnipolar A AC3 contacto or. 
 any  swiitch  shall  haave  a  breakking  and  m aking  capaccity  coordina ated  with  tthe  rated  va alues  of  thee 
customeer’s network, taking into consideratioon both the ggenerating p plant and thee passive load ds. 
 the shorrt‐time withsstand curren nt of the swittching devices shall be coordinated w with the maximum short 
circuit power at the POC3.  

                                                            
1
 For the defiinition of the  requirementss of the proteection system against faults within the ccustomers’ ne
etwork, pleasee 
refer to [1] 
2
 With particu
ular referencee to section 5 “EXCESS CURR RENT PROTEC CTION” 
Page | 8
8  
 
 
 
 
 
 
 
 In  case  of  loss  of  auxiliary 
a sup
pply  power  tto  the  switcchgear,  a  secure  discon nection  of  the 
t switch  is 
requiredd immediately. 

 
Figure 11: Schematicc representation for the  interconnecction of a sollar PV generrating plant w
with the 
bution netwoork of the Kingdom of Bahrain 
distrib
 
The function n of the interface switch might be coombined with either the main switchh or the gene erator switchh 
witching devvice4. In case of a combinnation, the single switchin
in a single sw ng device sh all be compliant with thee 
requirementts of both, th he interface switch and tthe combine ed switch (main switch oor generator switch). As aa 
consequence, at least tw wo switches in series shaall be alwayss present bettween a solaar PV generating unit and d 
the POC. 

                                                                                                                                                                                                          


3
 Information
n about the mmaximum prosspective shortt‐circuit level  of the Bahraini distributio n networks are reported inn 
the regulationn Nr 303 of [1
1]. 
4
e main switch,, the combinaation of the in
 For connecttion schemes  using a single nterface switcch with the main switch will 
lead to the disconnection  of the overalll customer’s ffacility when tthe interface switch is opeened, which m
means that thee 
power supplyy will be remo oved also to th
he customer’s  loads, if any.
Page | 9
9  
 
 
 
 
 
 
 
 
4.3 Norm
mal opera
ating rang
ges
Solar  PV  geenerating  pllants,  when  generatingg  power,  shall  have  the e  capability  to  operatee  stably  and d 
continuouslyy  in  the  operating  rangges  specifiedd  below,  re
egardless  the
e  topology  aand  the  setttings  of  thee 
protection systems: 
 when th he frequencyy at the POC stays within  the range 47 7,5Hz to 52,5
5Hz. 
 when th he voltage at the POC stays within thee range 90% to 110% of tthe rated vooltage. 
 
4.4 Immunity to disturbanc
d ces
4.4.1 Low w Voltage Riide Through (LVRT) capaability 
Solar  PV  generating  plaants  shall  co ontribute  to  overall  pow wer  system  stability 
s by  providing  also  immunityy 
towards dyn namic voltage changes, e especially thoose due to se ecure faults oon the higheer voltage levvel networkss. 
The requirem ments below w apply to all kinds of d isturbances  (1ph, 2ph and 3ph) andd are independent of thee 
interface pro otection setttings (see § 4.7.4) which
4 overrule the e technical caapabilities off a generatin
ng plant. 
 
A solar PV generating plant with a ra ated active ppower greate er than 11kW W shall be caapable to sta ay connected d 
to  the  distriibution  netw work  as  long  as  the  voltaage  at  the  POC 
P remainss  above  the  voltage‐time e  diagram  of 
o
Figure  2.  Th
he  p.u.  voltagge  shall  be  calculated 
c w
with  respect  to  the  nomiinal  voltage  at  POC.  For three‐phasee 
generating  p plants,  the  smallest 
s pha
ase  to  phasee  voltage  sh hall  be  evaluated.  The  coompliance  to 
t such  LVRTT 
requirementt  shall  applyy  to  all  equipment  that  might  cause  the  discon nnection  of  the  solar  PVV  generatingg 
plant. 
 
After  the  faaults  is  clearred  and  the  voltage  retuurned  within n  the  voltag
ge  normal  opperating  rannge,  the  pre‐
disturbance  operating conditions (acctive & reacttive power) shall be reco overed as fa st as possiblle and with aa 
tolerance off ±10% of thee solar PV ge enerating pannt rated pow wer. 
 

Figure 2: LV
VRT characteeristic for so
olar PV generrating plant 

Page | 10
0  
 
 
 
 
 
 
 
 
4.4.2 ROC COF withstand capabilitty 
Solar PV gen
nerating plants, when  generating  poower, shall b
be able to go
o  through frrequency  tra
ansients with

frequency w
within the freequency norm
mal operatinng range (§4.3) and with ROCOF valuee up to 2 Hz//s. 
 
4.5 Requ
uirements
s for the frequency
f y stability of the po
ower systeem
4.5.1 Actiive power reesponse to ffrequency vaariations 
A  solar  PV  ggenerating  plant 
p shall  be
e  capable  off  activating  the 
t provision n  of  active  ppower  respo
onse  to  overr‐
frequency  transients  acccording  to  the  curve  oof  Figure  35,  with  frequ uency  threshhold  and  drroop  settings 
adjustable and to be speecified by EW WA;  
 the  freq quency  thresshold  shall  be 
b settable  aat  least  betw
ween  50  Hz  and  52  Hz  i nclusive;  if  not  explicitlyy 
specified d by EWA, thhe threshold shall be set  to 50,3Hz; 
 the droo op settings sshall be betw ween 2% andd 12%; if no ot explicitly sspecified by  EWA, the drroop shall bee 
set to 4,4%; 
 the pu aactive power shall be refe erred to the  actual active e power valu ue when the  threshold is reached and d 
the activve power ressponse is acttivated. 
 
The resolution of the freequency measurement sshall be ±10mHz or less.. The active  power respo onse shall bee 
activated as fast as possible and shall be delivereed with an acccuracy of ±1 10% of the nnominal power. 
 

Figure
e 3: Active po PV generatin g plant 
ower freque ncy responsse for solar P
 
4.5.2 Actiive power deelivery at un nder‐frequeencies 
A  solar  PV  generating  plant  shall  be 
b resilient  to  reduction ency  at  the  POC,  limitin
ns  of  freque ng  as  low  ass 
possible the reduction oof its maximu um active pow wer due to uunder‐freque ency operati ng condition ns. 
 
                                                            
5
 In the figuree, the power 1
1 p.u. refers to
o the actual o utput power aat the time the frequency tthreshold is re
eached. 
Page | 11
1  
 
 
 
 
 
 
 
4.5.3 Rem mote limitatiion of active e power 
A solar PV ggenerating plant with a ra ated active ppower greater than or eq qual to 11kW W shall be eq quipped with h 
an interfacee (input port)) which is abble to receivee, from a rem mote control center, an  instruction requiring thee 
reduction off the active p
power output. 
 
The reductioon of active p
power shall b be carried ouut as fast as possible and d with an acccuracy greate er than 5% o of 
Pn. 
 
In  accordannce  with  the  provisions  set  forth  in  §4.7.5, EWA  shall  have  the  rright  to  spe ecify  further 
requirementts in terms o of equipment, communiccation protocol, information to be exxchanged an nd/or time of 
which  allow  to  integrate
execution,  w e  such  featuure  into  the  control  systems  of  its  ddistribution  network  and d 
w  to  remotelly  limit  the  active  poweer  output  of  the  solar  PV  generatin g  units  conn
which  allow nected  to  itss 
network. 
 
4.6 Requ
uirements
s for the voltage
v sttability of the powe
er system
4.6.1 Rea active powerr capability 
When voltagge and frequ g ranges, a ssolar PV generating plant 
uency at POC are withinn their normal operating
shall be ablee to provide reactive power in any ooperating po
oint within th active power 
he boundariees of the rea
6
capability deefined in Figu
ure 4 . 
 

                                                            
6
 The active ppower 1 p.u. sshall refer to tthe rated acti ve power valu
ue of the sola
ar PV generatiing plant: at 1
1 p.u. of activee 
power, the reeactive powerr capability off a solar PV geenerating plannt correspond ds to a power  factor varyingg between 0,9 9 
leading to 0.99 lagging. 
Page | 12
2  
 
 
 
 
 
 
 

Figure 4: Reeactive powe
er capability

With referen nce to Figuree 4, when the e solar PV geenerating plaant operates in the desiggn free area ((i.e. above itss 
rated  activee  power  beccause  of  favorable  envirronmental  conditions),  it  i is  allowedd  to  reduce  the  reactivee 
power capab bility according to the wiidest possibl e technical ccapability of the generatiing units. 
 
When the so olar PV generating plant is operating  above a thre eshold of 10 % of its nom minal appare ent power Sn n, 
the required d reactive poower shall be
e provided w with an accuracy of ±2% S Sn. Below thee threshold o of 10% of Sn n, 
a permissi ble;  neverth
deviations  aabove  2%  off  accuracy  are  heless  the  accuracy  sha ll  always  bee  as  good  as 
technically ffeasible and shall not excceed 10% of  Sn. 
 
4.6.2 Rea active powerr control mo odes 
A solar PV geenerating plaant shall be capable of ooperating in tthe control m modes statedd below, within the limitss 
of its reactivve power cap pability: 
 Q fix : th he reactive p
power is conttrolled in ordder to have aa fix value ; 
 Cos φ fixx : the reactive power is controlled inn order to haave a fix pow wer factor; 
 Cos φ (P P) : the reacttive power iss controlled  in order to h
have a powe er factor funcction of the actual activee 
power d delivery; 
The above ccontrol modees are exclussive; only on e mode mayy be active at a time. Thee activation, deactivation

and configurration of thee control mod
des shall be ffield adjustaable. 
 

Page | 13
3  
 
 
 
 
 
 
 
4.6.2.1 Fixx control mo odes 
When operaated with Q  fix or cos φ  fix control m mode, the so olar PV gene erating unit sshall control the reactivee 
power or the cos φ of its output acccording to a sset point sett in the contrrol system off the solar PV generatingg 
plant. 
 
For  a  solar  PV  generatiing  plant  with  a  rated  aactive  powe
er  greater  th
han  or  equa l  to  11kW,  the  solar  PV

generating p plant shall allso be able to receive th e set‐point ffrom a remote control ceenter in acco ordance with h 
the provisions set forth iin §4.7.5. 
 
4.6.2.2 Po ower related d control mode 
The power rrelated contrrol mode coss φ (P) contrrols the cos φ φ of the outp put as a funcction of the active power 
output. A ch haracteristic  with a minimmum and maaximum valu ue and three e connected  lines accord ding to Figuree 
5 shall be coonfigurable w within the coontrol system ms of the solar PV genera ating plant; aa change in active power 
output resullts in a new ccos φ set point accordingg to the charracteristic. 
 
The parameeters A, B an nd C shall be e field adjusttable and their settings  are the respponsibility off EWA. If not 
explicitly speecified by EW
WA, these pa arameters shhall be set as indicated be elow: 
 A  P = 0 Pn cos  = 1 
 B  P = 0,5 P
Pn  cos  = 1 
 C  P = Pn    cos  = 0.9  olar PV generrating plant aabsorbing   
(with the so
        reactivee power) 
 
The responsse to a new ccos φ set point value shaall be as fast as technically feasible affter the neww value of thee 
active poweer is reached.. The accuraccy of the conntrol to eachh set point sh
hall be accordding to the rrequirementss 
of §4.6.1. 
 
The implementation of  a lock‐in and lock‐out vvoltage level  shall be con nfigurable, eeach in the rrange 90% too 
110% of the nominal volltage at POC: the contribbution is activated when the voltage  at POC exceeds the lockk‐
in  voltage  aand  is  deacctivated  whe
en  the  voltaage  at  POC  drops  belo
ow  the  lock‐‐out  voltage
e.  When  thee 
contributionn is not activaated, the solar PV generaating plant shall be contrrolled with a  unit power factor. 
 

4  
Page | 14
 
 
 
 
 
 
 

5: Characterristic for Cos φ (P) contro
Figure 5 ol mode 
 
4.6.3 Pow wer reductio on at increassing voltagee 
In order to aavoid the dissconnection  due to overrvoltage prottection, a solar PV generrating plant  is allowed to o 
reduce  its  p
power  outpu ut  (active  an
nd/or  reactivve  power)  as 
a a  function n  of  the  risiing  voltage  at  POC.  Thee 
implementeed logic can b be chosen byy the manufaacturer/custtomer. Nevertheless, thee implemented logic shalll 
not cause steps or oscillaations in the power outpput. 
 
4.6.4 Rea active currennt injection d during a fauult 
The provisioon of reactivee current during a fault iis currently n not required d for solar PV V generatingg plants. Such h 
feature  migght  be  introduced  in  th he  future  in   a  scenario  of  a  growing  penetrattion  level  of  distributed d 
generation aand a decreaasing short ciircuit power  of the powe er system of the Kingdom m of Bahrain.. 
 
4.7 Requ
uirements
s for the managem
m ment of the
e power system
4.7.1 Connection con nditions 
A solar PV ggenerating plant is allowwed to conneect to the ne etwork and tto start to ggenerate elecctrical power 
due  to  norm
mal  operational  start‐up,,  when  the  vvoltage  and  frequency  are 
a within  thhe  following  range  for  at 
least the obsservation tim
me: 
 Frequen ncy range      47,5 Hz  ≤ f ≤ 50,05 HHz; 
 Voltage range      94% Uc  ≤ U ≤ 106% Uc; 
 Minimum m observatio on time  180s. 
 
ng a solar PV
Synchronizin V generatingg plant with  the distribution network shall be fuully automatic i.e. it shalll 
ween the tw
not be possiible to manually close the switch betw o carry out ssynchronization7. 
wo systems to
 

                                                            
7
It means that the switch u
used for the syynchronisatio n with the network cannot be a manual  switch. 
Page | 15
5  
 
 
 
 
 
 
 
The  synchro onization  of  a  solar  PV  generating 
g pplant  to  the  distributionn  network  shhall  not  crea
ate  transient 
voltage variaation at the POC of more e than 3% of  rated voltagge. 
 
After connection, a solaar PV generating plant shhall follow its target active power vaalue with a vvariation ratee 
not greater tthan 10% Pn/min. 
/
 
The active ppower targett shall be the e maximum  available acctive power o output whichh is possible e to generatee 
from  the  ssolar  PV  geenerating  plant,  taking  into  accou unt  the  envvironmental  conditions  (irradiation n, 
temperaturee, …), exceptt for the operating condittions when tthe power ou utput shall foollow change es due to thee 
provision of some of thee services spe ecified in thiss document (see §4.5.1, 4.5.3 and 4. 6.3). 
 
4.7.2 Rem mote disconn nection 
A solar PV ggenerating plant with a ra ated active ppower greater than or eq qual to 11kWW shall be eq quipped with h 
a logic interfface (input p
port) in order to disconn ect from the e network fo ollowing an innstruction re eceived at its 
interface. 
 
In  accordan nce  with  the  provisions  set  forth  in  §4.7.5,  EWA  shall  have  the  rright  to  spe ecify  further 
requirementts  in  terms  of  equipment,  time  oof  execution n,  communiccation  protoocol  and/or  data  to  bee 
exchanged,  to  integratee  such  featurre  into  the  ccontrol  syste
ems  of  its  distribution  n etwork  and  to  allow  thee 
remote disco onnection off the solar PV V generatingg plants conn nected to its network. 
 
4.7.3 Auto omatic reco onnection affter trippingg 
After the trip of the inteerface protecction, a solarr PV generatting plant is a allowed to reeconnect to the networkk 
only if the vo
oltage and frrequency are e within the ffollowing range for at lea ast the obse rvation time e:  
 Frequen ncy range      47,5 Hz  ≤ f ≤ 50,05 H Hz; 
 Voltage range      94% Uc  ≤ U ≤ 106% Uc; 
 Minimum m observatio on time  180s. 
After reconnnection, the solar PV gen nerating plannt shall return to its targe
et active powwer value witth a variation

rate not greaater than 100% Pn/min. 
 
4.7.4 Inteerface Protecction 
The purposee of the interrface protecttion is to: 
 disconneect the solarr PV generatiing plant from bution netwo
m the distrib ork in the folllowing casess 
o EWA switches off the distribution nnetwork (or tthe feeder) tthe generatiing plant is cconnected to o 
(i.e. to preveent unintentional islandi ng); 
o Voltage  or  frequency 
f trransients  of  the  power  system  out  of  the  norm
mal  operatin
ng  ranges  ass 
defined in §4.3. 
4
 prevent  the solar PV V generating plant, whenn generating power, to cause overvooltages in the e distribution

networkk it is conneccted to; 
It is not the purpose of tthe interface e protection tto: 
 disconneect  the  geneerating  plantt  from  the  ddistribution  network  in  case  of  faultts  within  the
e  customer’s 
networkk; for such isssues, the req
quirements ffor the conne ection of passsive custom mers shall app ply [1]8; 

                                                            
8
 Especially Seection 5 “EXCESS CURRENT
T PROTECTION
N” 
Page | 16
6  
 
 
 
 
 
 
 
 prevent  damages to o the custom mer’s equipmment (generaating units o or loads) duee to faults/in
ncidents (e.gg. 
short  cirrcuits)  on  th
he  distributio
on  network  or  on  the  cu
ustomer’s  in
nternal  netw
work;  for  such  issues,  thee 
recomm mendations and requirem ments of the mmanufacture ers of the equipment shaall apply. 
In any case,  the protecttion schemess and settinggs for electriical faults wiithin the cusstomer’s nettwork as welll 
as those useed for the prrotection of the customeer’s equipme ent must nott jeopardise  the perform mances of thee 
requirementts set out at §4.4 (immun nity). 
 
The  interfacce  protection  shall  be  a 
a dedicated  device  whicch  acts  on  the 
t interfacee  switch.  Fo or  a  solar  PV

generating  p plant  with  a 
a rated  activve  power  loower  than  11kW,  it  is  permitted 
p too  integrate  the 
t interfacee 
protection in nto the solarr PV generating units. 
 
The  interfacce  protectionn  shall  comm
mand  the  intterface  switch;  for  a  sollar  PV  generrating  plant  with  a  ratedd 
active  poweer  greater  th
han  11kW,  unless 
u explic itly  agreed  by  EWA,  only  one  interfface  protecttion  and  onee 
interface swwitch shall bee used for a ssolar PV geneerating plantt. 
 
For a solar PPV generatin ng plant with h a rated acttive power ggreater than 20kW, the i nterface pro otection shalll 
additionally  act on anotther switch ((backup swittch) with a p proper delayy in case thee interface sw witch fails to o 
operate. Thee backup switch may con nsist of a deddicated switcch or an already existing  switch9. Wh hen the backk‐
up  switch  iss  triggered  because  thee  interface  sswitch  had  failed  to  oppen,  only  maanual  reclossure  shall  bee 
possible10. 
 
For  a  solar  PV  generatiing  plant  with  a  rated  aactive  poweer  greater  th
han  11kW,  tthe  power  supply  of  thee 
interface pro otection shall include an uninterrupttible power ssupply. 
 
The loss of tthe auxiliaryy voltage of e either the in terface prottection or the solar PV g enerating plant’s contro ol 
system shalll trigger the iinterface switch withoutt delay.  
 
The protectiion functionss required in the Interfacce Protection n are the following: 
 Undervo oltage [27] 
o One thresho old [27<] in tthe range [200%; 100%] of the POC no ominal voltagge adjustable by steps o of 
5%, and delaay time in the range [0,1 s;100s] adjustable in steps of 0,1s; 
o One thresho old [27<<] in the range [00%; 100%] of the POC no ominal voltagge adjustable by steps o of 
5%, and delaay time in the range [0,1 s;5s] adjustaable in steps of 0,05s. 
 Overvolttage 10 min mean [59‐Avv]11 
o One thresho old in the rannge [100%; 1115%] of the e POC nominal voltage addjustable by steps of 1% %, 
and delay timme lower tha an or equal tto 3s; 
 Overvolttage [59] 
o One thresho old [59>] in tthe range [1100%; 120%] of the POC nominal volltage adjusta able by stepss 
of 1%, and d
delay time in the range [00,1s;100s] ad djustable in ssteps of 0,1ss; 

                                                            
9
 It is anywayy recommendeed not to use the main swittch as back‐upp switch since it could lead  to the disconnection of thee 
overall custom mer’s facility  in the case th he interface sw open, with the consequencce of the pow
witch fails to o wer supply also

being removeed to customeer’s loads. 
10
  The  reasonns  are  that  itt  is  required  that  the  plannt  operator  first 
f acknowle
edges  and  chhecks  the  reasons  why  thee 
interface swittch failed to o open, then rem medies the tecchnical issues and finally re esumes operattion. 
11
 voltage prootection function using the 10 minutes r..m.s. voltage aas input 
Page | 17
7  
 
 
 
 
 
 
 
o One threshoold [59>>] in the range [1100%; 130%] of the POC C nominal vo ltage adjusta able by stepss 
delay time in the range [00,1s;5s] adjustable in steps of 0,05s. 
of 1%, and d
 Overfreq quency [81>] 
o One thresho old [81>] in the range [500Hz; 53Hz] ad djustable by steps of 0,1 Hz, and dela ay time in thee 
range [0,1s;100s] adjustable in stepss of 0,1s; 
o One thresho old [81>>] in
n the range [[50Hz; 53Hz]] adjustable  by steps of  0,1Hz, and d delay time in n 
the range [0
0,1s;5s] adjusstable in stepps of 0,05s;
 Underfeequency [81<<] 
o One thresho old [81<] in the range [477Hz; 50Hz] ad djustable by steps of 0,1 Hz, and dela ay time in thee 
range [0,1s;100s] adjustable in stepss of 0,1s; 
o One thresho old [81<<] in
n the range [[47Hz; 50Hz]] adjustable  by steps of  0,1Hz, and d delay time in n 
the range [0
0,1s;5s] adjusstable in stepps of 0,05s;
 Loss Of M Mains:  
for  tthe  LOM  pro
otection  fun
nctions,  a  wiide  variety  of 
o approache es  can  be  ussed:  besidess  the  passivee 
obseervation of vvoltage and  frequency,  oother active  and passive e  methods a re  available  and used to o 
deteect  unintentional  islanding  situationns  but  only  some 
s of  the
ese  methodss  rely  on  sta andards.  Thee 
pressent documeent doesn’t in ntend to speecify the metthod to be used to achievve the goal b but rather its 
efficcacy; for such a reason, tthe only reqquirement on n LOM prote ection is thatt the protecttion function n 
shall be tested in accordancce with  [2] (oor other equivalent stand dards) whichh provides procedures to o 
evaluate  the  peerformance  of  islandingg  prevention  measures  used  with  uutility‐interco onnected  PV V 
systeems. 
 
The LOM prrotection fun nctions shall  have the poossibility to  be excluded or the LOM M settings to  be modified d 
suitably. 
 
The protectiion functionss for undervoltage [27] aand overvolttage [59] sha all be fed by  all the line vvoltages withh 
at  least  onee  solar  PV  generating 
g unit, 
u whereaas  the  prote ection  functtions  for  unnderfrequenccy  [81<]  and d 
overfrequen ncy [81>] shaall be fed by a at least one  line voltagess. 
 
EWA  is  resp ponsible  to  define 
d the  ap
ppropriate  ssettings  to  be  applied  to o  the  interfacce  protectio
on  and  whichh 
can ensure tthe correct ttripping of tthe solar PV  generating  plant under  specific connditions. The e settings aree 
chosen  so  tthat,  in  casee  a  fault  witthin  the  disttribution  network  trigge ers  the  netw work  protecttion  systemss 
(which in turn disconnecct the faultyy feeder), theere could no ot be any recclosure of thhe network switch beforee 
all the solar PV generatin ng plants havve been discconnected. 
 
ANNEX  B  prroposes  defaault  settingss  for  the  diffferent  prote ection  functions.  Such  ssettings  shall  be  actuallyy 
applied  in  thhe  IP  of  a  so
olar  PV  geneerating  plantt  only  in  casse  no  setting
gs  have  beenn  explicitly  specified 
s and

communicatted by EWA. 
 
The interfacce protection n shall have a at least two  configurable e digital inpuuts which maay be used in n the future12 
by  EWA  forr  transfer  trip,  remote  tripping 
t or  aany  other  fu unction  thatt  may  be  neecessary  to  increase  thee 
capacity  of  the  distribution  networrks  to  host  ddistributed  generation 
g while 
w keepingg  an  acceptable  level  of 
reliability. 
 

                                                            
12
 In a scenarrio of growingg penetration level of distrributed generration in the d
distribution n etworks of th
he Kingdom o
of 
Bahrain 
Page | 18
8  
 
 
 
 
 
 
 
4.7.5 Mon nitoring, rem mote contro ol and inform mation exch hange 
Adequate in nformation concerning th he customerss connected to the distribution netw works is a pre erequisite for 
enabling  EWWA  to  mainttain  the  stability  and  seecurity  of  itts  networks..  EWA  needds  to  have  a  a continuous 
overview  off  the  state  of  its  network,  which  may  require e,  in  some  cases,  updaated  informa ation  on  thee 
operating co onditions of  the solar PV V generating  plants conn nected to its distributionn networks a as well as thee 
possibility to
o communicate with the ese plants in  order to dirrect the operational insttructions set forth by thee 
provisions of the present document.. 
 
Such requireements are u usually needed in case o f growing pe enetration leevel of the soolar PV gene erating plantss 
in the distrib
bution netwo orks; they may also be inntroduced in the framework of other  r initiatives dedicated, for 
example, to the optimizaation of the control perfoormances off the network. 
 
A solar PV generating plant with a ra ated capacityy greater thaan 11kW13 sh hall thereforre be equipp ped with a bi‐
directional  ccommunication  interface e  which  cann  be  used  fo
or  the  exchange  of  inforrmation  with h  EWA.  Oncee 
o the  netwoork,  in  accorrdance  with  a  cost/beneefit  approach,  EWA  shalll 
actually  neeeded  for  the  operation  of 
have the right to specifyy additional rrequirementss concerningg especially:
 Data,  w which  shall  be  collected  and  sent  too  EWA  in  reaal‐time  or  periodically,  rrelated  to  th he  operatingg 
conditio
ons of the sollar PV generating plant; 
 Operatio onal  instructtion  sent  byy  EWA  whichh  shall  be  executed  by  the  solar  PV V  generatingg  plant;  such

instructiions shall bee compliant w with the req uirements in ndicated in tthe present sstandards (e especially thee 
requiremments of §4.5.3 and §4.7 7.2); 
 Communications chaannels and p protocols to bbe used for tthe above re equirements.. 
 
If technicallyy possible, EWA may takke advantagee of already  existing com mmunicationn channels, such as smart 
metering  in e  monitorinng  activities  into  its  ICTT 
nfrastructuree,  in  order  to  facilitatee  the  integration  of  the
architecturee and reduce the costs off implementaation. 
 
4.7.6 Pow wer quality 
4.7.6.1 Vo oltage deviattion 
Under  norm mal  operatingg  conditions,,  the  connecction  and  opperation  of  a 
a solar  PV  geenerating  plant  shall  not 
cause  the  vvoltage  at  itss  POC  and  at 
a the  POC  oof  any  other  customer  connected  tto  the  same e  distributionn 
network, to vary from th he system rated voltage bby more than ±6%. 
 
4.7.6.2 Ra apid voltage changes 
Connection  and disconn nection of a  solar PV gennerating plant from the  distributionn networks sshall not givee 
rise to voltagge variationss exceeding 3 3% of the sysstem rated vvoltage at the POC. 
 
4.7.6.3 Ha armonics and inter‐harm monics 
Voltage harm monics and iinter‐harmonics at the PPOC of a solaar PV generating plant shhall not exce eed the limitss 
specified below. 
 

                                                            
 
Page | 19
9  
 
 
 
 
 
 
 

 
Moreover,  the  customer  shall  be  required  tto  make  pro ovision  for  the  possiblle  future  in
nstallation  of 
o
compensatinng apparatuss if the solar PV generati ng plant gen
nerates  
 odd harm monics exceeding 1% voltage distorttion or  
 even harmonics exceeeding 0.6%,, or 
 the conttribution of tthe solar PV generating pplant to the TTHD at the POC exceeds  1.6%. 
 
For a solar P
PV generatingg plant connected to an  LV distribution network, it is commoonly accepted d [6] that thee 
above  menttioned  requirements  co oncerning  thhe  voltage  harmonics 
h are  fulfilled  iif  the  harmonic  current 
emissions off the solar PVV generatingg plant don’t exceed the ffollowing lim mits: 
 for  geneerating  plants  with  a  ra ated  active  ppower  below w  600W,  thee  limits  defi ned  in  the  standard  IEC

61000‐33‐2 [3], Class C (lighting) e equipment, sshall apply;
 for  pow r  greater  thaan  600W,  the  limits  defiined  in  the  standard  IEC
wer  plant  witth  a  rated  active  power  C 
61000‐33‐12 [4], Tablle 2, Rsce = 333,.shall applyy. 
 
4.7.6.4 DC C injection 
The  DC  commponent  whiich  solar  PV  generating  plants  injectt  into  the  ne
etwork  shall   not  exceed  0,5%  of  thee 
rated AC currrent value oof the plant. 
 
The single solar PV geneerating plantt shall be eqquipped with h a DC fault  detection syystem which h disconnectss 
the faulty unit when thee above limit is exceedeed. A valid allternative to such system m is the use  of an AC/AC C 
transformerr which preveents from an ny DC injectioon into the nnetwork. 
 
4.7.6.5 Clu usters of single‐phase generating unnits 
The use of tthree‐phase  equipment  is required.  In accordance with  [1]144, it is anywaay allowed for a solar PV V 
generating p plant with a  rated activee power lowwer than 20kW to be com mposed of oone or more  single‐phasee 
generating u units. In such
h case, if the
e supply fromm EWA is a  three‐phase e service andd if multiple  single‐phasee 
units are useed, the singlle‐phase gen nerating unitts shall be eq
qually distrib buted over thhe three pha ases in order 
overall imbalance of currrent betwee n the phasess15. 
to limit the o
 
4.8 Mete
ering
metering systtems are required for sollar PV generaating plants.
Dedicated m
                                                            
14
 Especially, rule nr 404 off [1] 
15
 If feasible, aa maximum immbalance of 1
16A between tthe phases is recommende
ed. 
Page | 20
0  
 
 
 
 
 
 
 
 
As a general rule. the mmetering posiitions and thhe meters ussed for mete ering solar PVV generatingg plants shalll 
be in accorddance with seection 4 of [1
1]. 
 
In partial deerogation fro
om regulatioon Nr 401 off  [1], a custo omer with a  solar PV gennerating plant shall havee 
two meterin ng positions: 
 A net‐metering posittion where tthe main elecctricity mete er is installed
d, 
 A solar P PV productioon metering position wheere the PV ellectricity meter is installeed. 
 
The main electricity metter measure es the net ennergy at the  POC wherea as the PV eleectricity metter measuress 
the energy p produced by the solar PVV generating  plant connected to the P POC. 
 
In derogatioon from regu ulation Nr 4118 of  [1], thee PV electriccity meter ca an be installeed within the customer’s 
premises; in such case, tthe PV electrricity meter sshall have remote meter reading cappability. 
 
5 COMP
PLIANCE

A  customer  shall  ensuree  that  its  solar  PV  gene rating  plant  complies  with 
w the  requuirements  de efined  in  thee 
present stan
ndards throu ughout the ovverall lifetim me of the facility. 
 
The  customer  shall  notiify  to  EWA  any 
a incidentt,  failure  or  planned  mo odification  off  its  solar  PV
V  generatingg 
plant which may affect tthe complian nce with the  requirementts defined in n the presentt standards. 
 
The customeer shall provvide EWA with all the doocuments, sttudies and m measurementts useful to  demonstratee 
the compliannce of the soolar PV generating plant  to the requirements defined in the ppresent stand dards. 
 
If  deemed  n
necessary,  EWA 
E shall  haave  the  righht  to  request  the  custom
mer  to  carryy  out  additio onal  tests  or 
studies with the scope to o demonstra ate the comppliance of the e solar PV geenerating plaant with the provisions o of 
the present  document. SSuch activities may be reequested no ot only during the connecction processs, but at anyy 
time  througghout  the  liffetime  of  th he  solar  PV  generating  plant,  and  more  speciifically  after any  failuree, 
modificationn or replacemment of any equipment tthat may havve an impactt on the com mpliance of th he plant with h 
the present standards. 
 
When  studies  are  required,  EWA  shall s providee  the  custommer  with  all  the  techniccal  data  of  the  networkk 
necessary to
o carry out thhe studies. 
 

Page | 21
1  
 
 
 
 
 
 
 
ANNEX A.. CONNEC
CTION SC
CHEMES

 
F
Figure 6: MV connection scheme – In
nterface swittch on LV sidde 

Page | 22
2  
 
 
 
 
 
 
 

Figure 7: MV connecttion scheme
e – Two main
n switches 
 

Page | 23
3  
 
 
 
 
 
 
 

 
Fiigure 8: MV connection sscheme – Intterface Switch on MV sidde 
 

Page | 24
4  
 
 
 
 
 
 
 

Figure 9: LLV Connectio
on Scheme

Page | 25
5  
 
 
 
 
 
 
 

Figure 10
0: LV connecttion scheme
e – Two main
n switches 
 

Page | 26
6  
 
 
 
 
 
 
 

 
Figure 11: LV connnection sche
eme with ba
ack‐up 
 
   

Page | 27
7  
 
 
 
 
 
 
 
ANNEX B.. DEFAUL
LT SETTIN
NGS OF IN
NTERFAC
CE PROTE
ECTION

The followin
ng Table 1 reeports the de
efault settinggs to be impplemented in n the interfacce protection of solar PV

generating p
plants when no other setttings have bbeen communicated by E EWA. 
 
T
Table 1: Defaault settings  for the prottection functtions of the IIP 
LV network
k MV network
Protection fu
unction
Threshold Time delay Th
hreshold Timee delay
27< 90% 0.4 s 90% 1..5 s
27<< 40% 0.2 s 30% 0..2 s
59> 110% 1.5 s 110% 1..5 s
59>> 120% 0.2 s 120% 0..2 s
81>> 52.5 Hz 0.1 s 52.5
5 Hz 0..1 s
81< 47.5 Hz 4s 47.5
4 Hz 4s
81<< 46.5 Hz 0.1 s 46.5
4 Hz 0..1 s
 
   

Page | 28
8  
 
 
 
 
 
 
 
ANNEX C.. LIST OF APPLICA
ABLE STA
ANDARDS
S FOR EQ
QUIPMENT
T

The main staandards to bbe used as a reference inn the develo
opment of a solar PV appplication are summarized d 
hereinafter.  For each staandard a sho
ort commennt and its relevancy (a 3‐‐level scale iss adopted) a
are proposed

with the following legend: 
    Useful d
document 
    Important document 
    Fundammental docum ment 
 
A.1. PV m
modules
Referencce Title Relevancy
R Appliccation
Terresstrial photovoltaic (PV) moodules - Design
IEC 61215-1 qualiffication and ty
ype approval - Part 1: Test  A
All PV modulees, type tests
requirrements
Terresstrial photovoltaic (PV) moodules - Design
ype approval - Part 1-1: Speecial
qualiffication and ty A
All crystalline PV modules,
IEC 61215-1-1 
requirrements for tessting of crystaalline silicon sppecial requirements
photovvoltaic (PV) modules
m
Terresstrial photovoltaic (PV) moodules - Design
ype approval - Part 1-2: Speecial
qualiffication and ty A
All CdTe PV modules,
m
IEC 61215-1-2 
requirrements for tessting of thin-ffilm Cadmium m sppecial requirements
Tellurride (CdTe) baased photovolltaic (PV) mod dules
Terresstrial photovoltaic (PV) moodules - Design
A
All amorphouss silicon PV
ype approval - Part 1-3: Speecial
qualiffication and ty
IEC 61215-1-3  m
modules, speciial
requirrements for tessting of thin-ffilm amorphou us
reequirements
siliconn based photovoltaic (PV) m modules
Terresstrial photovoltaic (PV) moodules - Design
A
All Cu(In,GA)(S,Se)2 PV
ype approval - Part 1-4: Speecial
qualiffication and ty
IEC 61215-1-4  m
modules, speciial
requirrements for tessting of thin-ffilm
reequirements
Cu(Inn,GA)(S,Se)2 based
b photovooltaic (PV) mo odules
Terresstrial photovoltaic (PV) moodules - Design
IEC 61215-2 ype approval - Part 2: Test
qualiffication and ty  A
All PV modulees, type tests
proceddures
AAll PV modulees, especially
Photoovoltaic (PV) module
m safetyy qualification
n - Part
IEC 61730-1  thhose installed on buildings,
1: Reqquirements for constructionn
coonstruction
AAll PV modulees, especially
Photoovoltaic (PV) module
m safetyy qualification
n - Part
IEC 61730-2  thhose installed on buildings,
2: Reqquirements for testing
teesting
Salt mist
m corrosion testing of phootovoltaic (PV
V) PPV modules in nstalled in a
IEC 61701 
modules mmarine environ nment
TTests on PV modules
m used inn
Photoovoltaic (PV) modules
m - Am
mmonia corrossion
IEC 62716  ennvironments with
w a high
testingg
de
degree of amm monia
Photoovoltaic (PV) modules
m - Traansportation teesting - TTests on all PV
V modules to
IEC 62759-1 Part 1: Transportatiion and shippiing of modulee  asssess the mech hanical stress
packaage units du
during transporrtation
TTests on PV modules
m used inn
Photoovoltaic (PV) modules
m – Cyyclic (dynamicc)
IEC TS 627882  ennvironments with
w a high
mechaanical load tessting
mmechanical streess
IEC 62790 Junctiion boxes for photovoltaic
p m
modules – Saffety  TTests on the junction boxes

Page | 29
9  
 
 
 
 
 
 
 
Referencce Title Relevancy
R Appliccation
requirrements and teests off all PV moduules
Photoovoltaic (PV) modules
m - Tesst methods forr the TTests on all PV
V modules to
IEC TS 628004-1 detecttion of potentiial-induced deegradation - Paart 1:  prrevent the occcurrence of
Crystaalline silicon PPID
Terresstrial photovoltaic (PV) moodules - Guideeline for
PPerformance an nd reliability
IEC TS 629441 increaased confidencce in PV moduule design 
off certified PV
V modules
qualiffication and ty
ype approval
Photoovoltaic modulles - Bypass ddiode - Thermal evvaluate if byp
pass diode cann
IEC 62979 
runaw
way test. ha
have thermal ru unaway
Datashheet and nameeplate informaation for phottovoltaic D
Documentation n for PV
EN 50380 
modules m
modules
E
Environmentall test applied
Enviroonmental testiing - Part 2-688: Tests - Testt L:
IEC 60068-2-68  too PV moduless installed in
Dust and
a sand
de
desert climatess

A.2. Inverrters
Referencce Title Relevancy
R Appliccation
Safetyy of power connverters for usse in photovolltaic
IEC 62109-1 
powerr systems - Paart 1: General rrequirements SSafety requiremments for
Safetyy of power connverters for usse in photovolltaic innverters, intern
national
IEC 62109-2 powerr systems - Paart 2: Particulaar requirementts for  sttandards
invertters
T
Test methods forf assessing
Utilityy-interconnectted photovoltaaic inverters - Test thhe capacity off an inverter
IEC 62116 
proceddure of island
ding preventionn measures annd its protectiion to avoid
isslanding
T
Test methods forf assessing
Utilityy-interconnectted photovoltaaic inverters - Test
IEC TS 629110  thhe LVRT capaacity of
proceddure for low voltage
v ride- thhrough measu urements
innverters
Photoovoltaic powerr generating syystems - EMC C
E
EMC requirem ments for
IEC 62920 requirrements and teest methods foor power convversion 
innverters used in PV systemss
equipm ment.
Data sheet
s and nam
me plate for phhotovoltaic inv
verters
This European
E Stan
ndard describees data sheet and
a
EN 50524  D
Documentation
n for inverterss
name plate informaation for photoovoltaic invertters in
grid parallel
p operatiion
T
Test methods forf measuring
Overaall efficiency of
o grid conneccted photovolttaic
EN 50530  sttatic and dynaamic
invertters
effficiency of PV inverters
 
A.3. EMC
C (Electro Magnetic
c Compati bility)
Referencce Title Relevancy
R Appliccation
Electrromagnetic coompatibility (EEMC) - Part 3-2:
M
Maximum outp put harmonic
IEC 61000-3-2 Limitss - Limits for harmonic currrrent emissions 
coontent for smaall inverters
(equippment input cuurrent ≤16 A pper phase)
Electrromagnetic coompatibility (EEMC) - Part 3-12:
M
Maximum outp put harmonic
Limitss - Limits for harmonic currrrents produced by
IEC 61000-3-12  coontent for medium size
equipm ment connecteed to public loow-voltage sy
ystems
innverters
with input current >16
> A and ≤ 775 A per phasee

Page | 30
0  
 
 
 
 
 
 
 
Referencce Title Relevancy
R Appliccation
Electrromagnetic co ompatibility (EEMC) - Part 2-2:
M
Maximum leveel of voltage
Enviroonment - Com mpatibility levvels for low-freequency
IEC 61000-2-2  di
disturbances on
n a LV public
conduucted disturban nces and signaalling in publiic low-
gr
grid
voltagge power supp ply systems
Electrromagnetic co ompatibility (EEMC) - Part 3-3:
N
Non harmonic voltage
Limitss - Limitation of voltage chhanges, voltage
di
disturbances on n a LV grid
IEC 61000-3-3 fluctuuations and fliccker in public low-voltage supply
s 
annd test system
ms. Valid for I
systemms, for equipmment with rateed current ≤16 6 A per
 16 A per phaase
phase and not subjeect to conditioonal connectio on
Electrromagnetic co ompatibility (EEMC) - Part 3-11:
N
Non harmonic voltage
Limitss - Limitation of voltage chhanges, voltage
di
disturbances on n a LV grid
IEC 61000-3-11 fluctuuations and fliccker in public low-voltage supply
s 
annd test system
ms. Valid for
systemms - Equipmen nt with rated ccurrent ≤ 75 A and
1 6 > I  75 A per
p phase
subjecct to condition
nal connectionn
Immmunity requ uirements and
Electrromagnetic co
ompatibility (EEMC) - Part 6-1: teest for LV equuipment
IEC 61000-6-1 Generric standards - Immunity forr residential,  innstalled in residential,
commmercial and lig
ght-industrial eenvironments coommercial an nd light-
inndustrial envirronments
Immmunity requ uirements and
Electrromagnetic co
ompatibility (E
EMC) - Part 6-2:
teest for LV equuipment
IEC 61000-6-2 Generric standards - Immunity forr industrial 
innstalled in ind
dustrial
enviroonments
ennvironments
Immmunity requ uirements and
Electrromagnetic co
ompatibility (EEMC) - Part 6-3: teest for LV equuipment
IEC 61000-6-3 Generric standards - Emission staandard for resiidential,  innstalled in residential,
commmercial and lig
ght-industrial eenvironments coommercial an nd light-
inndustrial envirronments
Immmunity requ uirements and
Electrromagnetic co
ompatibility (EEMC) - Part 6-4:
teest for LV equuipment
IEC 61000-6-4 Generric standards - Emission staandard for -ind
dustrial 
innstalled in ind
dustrial
enviroonments
ennvironments
Electrromagnetic coompatibility (EEMC) - Part 3-14:
Assesssment of emisssion limits foor harmonics, G
Guide to LV IE EC 61000
IEC/TR 610000-
interhharmonics, volltage fluctuatioons and unballance for  seeries standard
ds with
3-14
the coonnection of disturbing
d instaallations to LV
V power exxamples of appplication
systemms
Electrromagnetic coompatibility (EEMC) - Part 3-6:
IEC/TR 610000- Limitss - Assessmennt of emissionn limits for thee H
Harmonic current in MV

3-6 conneection of distorting installatiions to MV, HVH and annd HV RRGUU
EHV power system ms
Electrromagnetic coompatibility (EEMC) - Part 3-7:
FFlicker effects and other
IEC/TR 610000- Limitss - Assessmennt of emissionn limits for thee
 raapid voltage changes
c in MV
V
3-7 uating installaations to MV, HV and
conneection of fluctu
annd HV RRGU U
EHV power system ms
Electrromagnetic coompatibility (EEMC) –
Part 3-15: Limits – Assessment oof low frequen ncy
IEC/TR 610000- E
Effects of unbaalances in MV
V
electroomagnetic im
mmunity and 
3-15 annd HV RRGU U
emission requiremeents for disperrsed generation
systemms in LV netwwork

Page | 31
1  
 
 
 
 
 
 
 
Referencce Title Relevancy
R Appliccation
Electrromagnetic co
ompatibility (E
EMC) - Part 3-13:
IEC/TR 610000- Limitss - Assessmen
nt of emissionn limits for thee E
Effects of unbaalances in MV
V

3-13 conneection of unbalanced installaations to MV,, HV annd HV RRGU U
and EHV power systems
 
A.4. Cables and co
onnectors
s
Referencce Title Relevancy
R Appliccation
SStandard on caables for DC
EN 50618 Electrric cables for photovoltaic
p ssystems  arrrays
Conneectors for DC--application inn photovoltaicc IE
EC standard for
f PV
IEC 62852 
system
ms - Safety req
quirements annd tests coonnectors
 
A.5. Combiner box
xes
Reference Title Relevancy
R Appliccation

T
The main stand dard for the
Low-vvoltage switch
hgear and conntrolgear assem
mblies - de
design and con nstruction of
IEC 61439-2 
2 Power switcchgear and conntrolgear assemblies
Part 2: L
LV switchgearrs and
coontrolgear asssemblies

T
Test sequence is to
Balannce-of-system components ffor photovoltaaic de
determine the performance
p
IEC 62093 
system
ms – Design qualification
q nnatural environ
nments chharacteristics of BOS
coomponents
E
Equipment for power
Safetyy requirements for power ellectronic conv
verter
IEC 62447-1  coonversion and
d electronic
system
ms and equipmment Part 1: G
General
poower switchin
ng
E
Electronic equiipment in
poower installattions with
EN 50178 Electrronic equipmeent for use in ppower installaations 
reespect to safetty and
reeliability
 
A.6. LV sw
witchgearrs and co
ontrolgearr
Reference Title Relevancy
R Appliccation

Low-vvoltage switch
hgear and conntrolgear assem
mblies - A guide with th he explanationn
IEC/TR 614339-0 
Part 0:
0 Guidance to
o specifying asssemblies off main characcteristics
Low-vvoltage switch hgear and conntrolgear assem
mblies - T
The main stand dard for the
IEC 61439-1 
Part 1: General rulees de
design and con nstruction of
Low-vvoltage switch
hgear and conntrolgear assem
mblies - L
LV switchgearrs and
IEC 61439-2  coontrolgear asssemblies
2 Power switcchgear and conntrolgear assemblies
Part 2:
Low-vvoltage switchhgear and conntrolgear assemmblies - L
LV switchgearrs and
IEC 61439-3 
Part 3: Distribution
n boards intendded to be operrated by coontrolgear forr specific

Page | 32
2  
 
 
 
 
 
 
 
Reference Title Relevancy
R Appliccation
ordinaary persons (D
DBO) appplications
Low-vvoltage switch
hgear and conntrolgear assem mblies -
IEC 61439-5 Part 5: Assemblies for power disstribution in pu
ublic 
netwoorks
Low-vvoltage switch
hgear and conntrolgear assem
mblies -
IEC 61439-6 
Part 6:
6 Busbar trunk
king systems ((busways)
Low-vvoltage switchhgear and conntrolgear assem mblies -
7 Assemblies for specific appplications su
Part 7: uch as
IEC 61439-7 
marinnas, camping sites,
s market s quares, electriic
vehiclles charging sttations
Low-vvoltage switchhgear and conntrolgear - Partt 3: C
Characteristicss of LV
IEC 60947-3 Switchhes, disconnectors, switch- disconnectorss and  ciircuit-breakerrs and
fuse-ccombination units
u prrotection deviices
Low-vvoltage switch hgear and conntrolgear enclo
osed
C
Characteristicss of LV
equipm ment - Part 1: Enclosed swiitch-disconnecctors
IEC 62626-1  ciircuit-breakerrs and
outsidde the scope of IEC 60947-33 to provide issolation
prrotection deviices
duringg repair and maintenance
m w
work
 
A.7. HV s
switchgea
ars and co
ontrolgearr
Reference Title Relevancy
R Appliccation

High-voltage switch
hgear and conntrolgear - Parrt 1:
IEC 62271-1 
Commmon specificattions
High-voltage switch hgear and conntrolgear - Parrt 100:
IEC 62271-100 
Alternnating current circuit-breakeers
High-voltage switch hgear and conntrolgear - Parrt 103:
IEC 62271-103 Switchhes for rated voltages
v abovve 1 kV up to and
a 
A
All the PV plannts connected
includding 52 kV
too the MV grid
d
High-voltage switchhgear and conntrolgear - Parrt 200:
AC metal-enclosed
m switchgear annd controlgeaar for
IEC 62271-200 
rated voltages
v abov
ve 1 kV and upp to and includ ding 52
kV
High-voltage switch
hgear and conntrolgear - Parrt 202:
IEC 62271-202 
High-voltage/low-v
voltage prefabbricated substaation
 
A.8. Transformers
Referencce Title Relevancy
R Appliccation

IEC 60076-8 Powerr transformerss - Part 8: Appplication guidee 


IEC 60076-11 Powerr transformerss - Part 11: Drry-type transfo
ormers 
M
MV/LV dry-ty ype and liquid--
Powerr transformerss - Part 13: Seelf-protected liiquid- fiilled transform
mers
IEC 60076-13 
filled transformers
EN 50588-1 Mediuum power tran
nsformers 50 H
Hz, with highest 
Page | 33
3  
 
 
 
 
 
 
 
Referencce Title Relevancy
R Appliccation
voltagge for equipmeent not exceedding 36 kV. Part 1:
Generral requiremennts
Safetyy of power traansformers, poower supplies,,
IEC 61558-1 reactoors and similarr products - Paart 1: Generall  L
LV transformeers
requirrements and teests
 
A.9. Electtrical insttallation
Referencce Title Relevancy
R Appliccation

Low-vvoltage electriical installatioons - Part 1:


IEC 60364-1 Fundaamental princiiples, assessm ment of generall 
characcteristics, defiinitions
Low-vvoltage electriical installatioons - Part 4-41
1:
IEC 60364-4-41 Protecction for safety - Protectionn against electrric 
shockk
Low-vvoltage electriical installatioons - Part 4-42
2:
IEC 60364-4-42 Protecction for safety - Protectionn against thermmal 
effects
Low-vvoltage electriical installatioons - Part 4-43
3:
IEC 60364-4-43 
Protecction for safety - Protectionn against overccurrent
Low-vvoltage electriical installatioons - Part 4-44
4:
M
Main standardss for electric
IEC 60364-4-44 Protecction for safety - Protectionn against voltaage 
saafety
disturbbances and electromagneticc disturbancess
Low-vvoltage electriical installatioons - Part 5-52
2:
IEC 60364-5-52 Selecttion and erectiion of electriccal equipment - 
Wirinng systems
Electrrical installatio
ons of buildinngs - Part 5-53
3:
IEC 60364-5-53 Selecttion and erectiion of electriccal equipment - 
Isolatiion, switchingg and control
Low-vvoltage electriical installatioons - Part 5-54
4:
IEC 60364-5-54 Selecttion and erectiion of electriccal equipment - 
Earthiing arrangemeents and proteective conducttors
Low-vvoltage electriical installatioons - Part 6:
IEC 60364-6 
Verifiication
Electrrical installatio
ons of buildinngs - Part 7-712:
SStandard for ellectric safety
IEC 60364-7-712 Requiirements for sp pecial installaations or locatiions - 
off PV plants
Solar photovoltaic (PV)
( power suupply systemss
FFundamental for
fo the design
IEC 62548 Photoovoltaic (PV) arrays
a - Desiggn requirements 
off DC sectionss of PV plants
Photoovoltaic (PV) systems
s - Reqquirements forr testing,
docum mentation and maintenance - Part 1: Grid
d Im
mportant for the
t start-up
IEC 62446-1 
conneected systems - Documentattion, commisssioning annd verificationn of PV plantss
tests and
a inspectionn
IEC 61724-1 Photoovoltaic system
m performancee - Part 1: Mo
onitoring  M
Monitoring of PV system,

Page | 34
4  
 
 
 
 
 
 
 
Referencce Title Relevancy
R Appliccation
poower capacity
y and energy
Photoovoltaic system
m performancee - Part 2: Cap
pacity
IEC 61724-2  evvaluation
evaluaation method
Photoovoltaic system
m performancee - Part 3: Eneergy
IEC 61724-3 
evaluaation method
Crystaalline silicon photovoltaic
p ((PV) array - On-site
O M
Measurement of
o PV arrays
IEC 61829 
measuurement of I-V V characteristiics onn field
Protecction against lightning
l - Parrt 1: General
IEC 62305-1 
princiiples
Protecction against lightning
l - Parrt 2: Risk
IEC 62305-2 
managgement M
Main standardss on lightning
Protecction against lightning
l - Parrt 3: Physical damage efffects
IEC 62305-3 
to struuctures and liffe hazard
Protecction against lightning
l - Parrt 4: Electricall and
IEC 62305-4 
electroonic systems within
w structuures
 
A.10. PV mounting
g system
Referencce Title Relevancy
R Appliccation

B
Building Integrrated PV
EN 50583-1 Photoovoltaics in bu
uildings. Part 11: BIPV modu
ules 

EN 50583-2 Photoovoltaics in bu
uildings. Part 22: BIPV system
ms  B
Building Integrrated PV
Outlinne of Investigaation for Mouunting Systemss,
Immportant docu ument
Mounnting Devices, Clamping/Reetention Devicces, and
UL 2703  esspecially for Building
B
Grounnd Lugs for Use with Flat-P Plate Photovolltaic
Inntegrated PV
Moduules and Panels
 
A.11. Grid
d connecttion
Reference Title Relevancy
R Appliccation

Voltagge characterisstics of electriccity supplied by


b SSpecifications of PQ levels
EN 50160 
publicc electricity neetworks inn public netwo
orks
Requiirements for thhe connectionn of micro-gen nerators
D
Different requiirements for
EN 50438 in parrallel with pub
blic low-voltagge distribution
n 
coonnection in Europe
E
netwoorks
Requiirements for generating
g plannts to be conn
nected in
T
Technical speccifications for
CLC/TS 50549-1 parallel with distrib
bution networkks – Part 1: 
thhe LV grid connection
Conneection to a LVV distribution nnetwork abov ve 16 A
Requiirements for generating
g plannts to be conn
nected in
T
Technical speccifications for
CLC/TS 50549-2 parallel with distrib
bution networkks – Part 2: 
thhe LV grid connection
Conneection to a MV V distributionn network
T
Technical speccifications for
IEC TS 627886 Distribbuted energy resources connnection to thee grid 
gr
grid connection
n

Page | 35
5  
 
 
 
 
 
 
 
Reference Title Relevancy
R Appliccation

Assesssment of the power


p qualityy – characteristtics of SSpecifications of PQ levels
IEC TS 627449 
the eleectricity suppllied by publicc networks inn public netwo
orks
Photovoltaic (PV) systems
s - Chaaracteristics off the G
General requireements for
EN 61727 
utilityy interface gr
grid connection
n
 
 

Page | 36