Project: MIDHILLS Details: P2_VO_additional covered parking

Building: (MASTER) MIDHILL- EXTERNAL bay


WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

01 COVERED PARKING BAY (OPTION 1)

COVERED PARKING WITH 2 BAY (OPTION 1)

A Excavation work 2 m3 35.40 70.80

Vibrated reinforced concrete (Grade 30) as described


to:-
Footing
B Generally of various thickness 1 m3 354.70 354.70

High tensile steel Bar Reinforcement as described


to:-
Footing
C Various diameter 16mm, 20mm, 25mm and 32mm 162 kg 3.50 567.00

Sawn formwork as described to:-


Footing
D Sides of column stump 5 m2 32.50 162.50

METAL DECK ROOFING SYSTEM


Sanko grip deck 3pan steel 0.48mm thk BST (0.53mm
TCT) in clean colorbond XRW steel or approved
equivalent; to choice of color to C-channel purlin, with
stainless steel fasterners and washers inclusive of
accessories such as foam filler, metal sheet flashing,
weather seal silicone sealant; complete with galvanised
zed space; as drawing and specification. (Roof truss
shall be measured separately)
3 Degree Pitch or equivalent; including all flashing and
capping
E To covered car parking 26 m2 125.30 3,257.80

To Collection 4,412.80
Vincent Tan Associates 1/1
Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

01 COVERED PARKING BAY (OPTION 1) (Continued)

ROOF TRUSSES
STEEL ROOF STRUCTURE; AS PER DRAWING

Top Chord;
A 150mm x 100mm x 8.0mm Thick; T-rafter 283 kg 7.80 2,207.40

Bottom Chord;
B 100mm x 100mm x 6.5mm Thick; RHS 155 kg 7.80 1,209.00

C Extra over for mild steel plates including painting, Item 350.00
splicing, bolts and nuts as accordance to drawing and
specification

Purlin
D C channel 127mm x 51mm x16mm x 3.0mm Thick at 409 kg 7.80 3,190.20
1200mm c/c

Tie Bracing
E 75mm x 75mm x 4.0mm Thick 125 kg 7.80 975.00

F Extra over for mild steel plates including painting, Item 420.00
splicing, bolts and nuts as accordance to drawing and
specification

Universal Column :-
G 300mm x 200mm x 10mm Thick; RHS 328 kg 7.80 2,558.40

H Extra over for mild steel plates including painting, Item 260.00
splicing, bolts and nuts as accordance to drawing and
specification

PAINTING
Surface preparation and applying of one coat of
approved epoxy zinc phosphate, one coat of epoxy MIO
and one finishing coat of acrylic / urethene paint
I on surface of steel trusses 1,300 kg 0.80 1,040.00

To Collection 12,210.00
Vincent Tan Associates 1/2
Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

01 COVERED PARKING BAY (OPTION 1) (Continued)

COLLECTION

Page 1/1: 4,412.80


Page 1/2: 12,210.00

01 COVERED PARKING BAY (OPTION 1)


Carried to Summary: 16,622.80

Vincent Tan Associates 1/3


Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

02 COVERED PARKING BAY (OPTION 2)

COVERED PARKING WITH 2 BAY (OPTION 2)

A Excavation work 2 m3 35.40 70.80

Vibrated reinforced concrete (Grade 30) as described


to:-
Footing
B Generally of various thickness 1 m3 354.70 354.70

High tensile steel Bar Reinforcement as described


to:-
Footing
C Various diameter 16mm, 20mm, 25mm and 32mm 160 kg 3.50 560.00

Sawn formwork as described to:-


Footing
D Sides of column stump 5 m2 32.50 162.50

METAL DECK ROOFING SYSTEM


Sanko grip deck 3pan steel 0.48mm thk BST (0.53mm
TCT) in clean colorbond XRW steel or approved
equivalent; to choice of color to C-channel purlin, with
stainless steel fasterners and washers inclusive of
accessories such as foam filler, metal sheet flashing,
weather seal silicone sealant; complete with galvanised
zed space; as drawing and specification. (Roof truss
shall be measured separately)
3 Degree Pitch or equivalent; including all flashing and
capping
E To covered car parking 26 m2 125.30 3,257.80

To Collection 4,405.80
Vincent Tan Associates 2/1
Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

02 COVERED PARKING BAY (OPTION 2) (Continued)

ROOF TRUSSES
STEEL ROOF STRUCTURE; AS PER DRAWING

Top Chord;
A 80mm x 80mm x 5.0mm Thick; RHS 113 kg 7.80 881.40

Bottom Chord;
B 80mm x 80mm x 5.0mm Thick; RHS 112 kg 7.80 873.60

Diagonal Struts;
C 50mm x 50mm x 5.0mm Thick; RHS 49 kg 7.80 382.20

D Extra over for mild steel plates including painting, Item 220.00
splicing, bolts and nuts as accordance to drawing and
specification

Purlin
E Mild Steel Batten 50mm x 50mm at equal interval 442 kg 7.80 3,447.60

Tie Bracing
F 75mm x 75mm x 4.0mm Thick 125 kg 7.80 975.00

G Extra over for mild steel plates including painting, Item 450.00
splicing, bolts and nuts as accordance to drawing and
specification

Universal Column :-
H 356mm x 171mm x 57kg/m 241 kg 7.80 1,879.80

I Extra over for mild steel plates including painting, Item 190.00
splicing, bolts and nuts as accordance to drawing and
specification

To Collection 9,299.60
Vincent Tan Associates 2/2
Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

02 COVERED PARKING BAY (OPTION 2) (Continued)

PAINTING
Surface preparation and applying of one coat of
approved epoxy zinc phosphate, one coat of epoxy MIO
and one finishing coat of acrylic / urethene paint
A on surface of steel trusses 1,082 kg 0.80 865.60

To Collection 865.60
Vincent Tan Associates 2/3
Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

02 COVERED PARKING BAY (OPTION 2) (Continued)

COLLECTION

Page 2/1: 4,405.80


Page 2/2: 9,299.60
Page 2/3: 865.60

02 COVERED PARKING BAY (OPTION 2)


Carried to Summary: 14,571.00

Vincent Tan Associates 2/4


Project: MIDHILLS Details: P2_VO_additional covered parking
Building: (MASTER) MIDHILL- EXTERNAL bay
WORKS AND SERVICES

Item Description Quantity Unit Rate Amount (RM)

COLLECTION SUMMARY PAGE NO

01 COVERED PARKING BAY (OPTION 1) 1/1 - 1/2 16,622.80


02 COVERED PARKING BAY (OPTION 2) 2/1 - 2/3 14,571.00
Total Amount: 31,193.80