Beruflich Dokumente
Kultur Dokumente
com
Walter Bouldin Dam 1.013 1.04 Duncan, Wright and Rapid drawdown with
Wong (1990) multi-stage.gsz
Pumed storage 1.531 1.56 Duncan, Wright and Staged rapid drawdown –
project dam Wong (1990) Pumped Storage Project
Dam.gsz
Pilarcitos Dam 1.044 1.05 Duncan, Wright and Staged rapid drawdown –
Wong (1990) Pilarcitos Dam.gsz
USACE bench mark 1.428 1.44 Corps of Engineers Staged rapid drawdown –
(2003) EM 1110-2-1902 CE Example.gsz
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 1 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
The first stage involves the stability analysis of the embankment before drawdown when the water level is
high and the pore-water pressure in the materials is at steady state condition. Both the effective normal
stress and shear stress along the slip surface are used to determine the undrained shear strength for
materials that do not drain freely.
The second stage involves the stability analysis of the embankment after drawdown when the water level
is low and the pore-water pressure in the materials is at steady state condition. The effective normal stress
obtained from stage two, together with the effective strength parameters, are used to compute the drained
strength along the slip surface.
Both the drained and undrained strength at the slice base along the slip surface are compared, and the
smaller strength is chosen as the computed shear strength to be used in the third stage. This is needed in
order to avoid using undrained strengths higher than drained strengths which cannot be mobilized if
cavitation or drainage occurs (Duncan, Wright and Wong (1990).
The third stage involves the stability analysis using the computed shear strength and the final drawdown
water level. The computed factor of safety from the first and second stages are ignored, and only the
factor of safety computed from the third stage analysis is used to represent the stability after rapid
drawdown.
To use the staged rapid drawdown method in SLOPE/W, the following must be specified:
A Mohr-Coulomb soil strength model
Effective c’ and ’ parameters
Total c and parameters for non-freeely drained material
A piezometric line pore-water pressure condition
The positions of the piezometric lines before rapid drawdown
The amount of drawdown
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 2 of 8
300
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
290
280
Elevation (feet)
270
260
Before Drawdown - El. 252 ft
250
240
230
After - El. 220 ft
220
210
200
0 20 40 60 80 100 120 140 160 180 200 220
Distance (feet)
Figure 1 The Geometry of the Walter Bouldin Dam
Figure 2 shows the slip surface and the SLOPE/W computed factor of safety using the 3-stage undrained
strength method. The factor of safety is 1.013, which is essentially the same as the factor of safety
obtained by Duncan, Wright and Wong (1990).
Figure 2 SLOPE/W Computed Factor of Safety Using the 3-Stage Undrained Strength Method
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 3 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
650
600
Elevation (feet)
500
450
300
250
0.0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
Figure 4 shows the slip surface and the SLOPE/W computed factor of safety using the 3-stage undrained
strength method. The factor of safety is 1.531, which is almost identical to the factor of safety obtained
by Duncan, Wright and Wong (1990).
Figure 4 SLOPE/W Computed Factor of Safety Using the 3 Stage Undrained Strength Method
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 4 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
’= 45 degrees,
cT = 60 psf,
T= 23 degrees
720
Elevation (feet)
670
After drawdown El. 657 ft
620
0 100 200 300
Distance (feet)
Figure 5 The Geometry of the Pilarcitos Dam
Figure 6 shows the slip surface and the SLOPE/W computed factor of safety using the 3-stage undrained
strength method. The factor of safety is 1.044, which is essentially the same as the factor of safety
obtained by Duncan, Wright and Wong (1990).
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 5 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
Figure 6 SLOPE/W Computed Factor of Safety Using the 3 Stage Undrained Strength Method
’= 30 degrees
cT = 1200 psf
T= 16 degrees
The slip surface is established by a center located at x=169.5 feet, y =210 feet and a radius of 210 feet.
Drawdown is from a maximum water level of 103 feet to a minimum level of 24 feet. The upstream slope
is 3 to 1 up to elevation 74 and 2.5 to 1 above elevation 74.
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 6 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
Figure 8 shows the slip surface and the SLOPE/W computed factor of safety using the 3-stage undrained
strength method. The factor of safety is 1.428, which is almost identical to the factor of safety as
presented in the Corps of Engineers (2003) engineering manual.
Figure 8 SLOPE/W Computed Factor of Safety Using the 3 Stage Undrained Strength Method
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 7 of 8
GEO-SLOPE International Ltd, Calgary, Alberta, Canada www.geo-slope.com
1.6 Discussions
As illustrated in the above three examples, it is evident that the Duncan, Wright and Wong’s 3-Stage has
been implemented correctly in SLOPE/W. The computed factors of safety in all three cases are identical
to those presented by Duncan, Wright and Wong (1990) and the USACE Engineering Manual (2003).
The 3-Stage method seems to provide a reasonable evaluation of the stability during rapid drawdown. The
approach avoids the extra work of evaluating the pore-water pressure conditions in the embankment dam
by using the undrained strengths. However, the hydraulic properties of the materials, such as
permeability, cannot be considered, the element of time is missing, and the total strength parameters are
used.
References
Corps of Engineers (1970) “Engineering and Design – Stability of Earth and Rock Fill Dams”.
Engineering Manual, EM 1110-2-1902. Department of the U.S Army Corps of Engineers.
Corps of Engineers (2003) “Appendix G - Procedures and Examples for Rapid Drawdown”. Engineering
Manual, EM 1110-2-1902. Department of the U.S Army Corps of Engineers.
Duncan, J.M.,Wright S.G. and Wong, K.S. (1990). “Slope Stability during Rapid Drawdown”.
Proceedings of H. Bolton Seed Memorial Symposium. Vol. 2.
Lowe, J and Karafiath, L., (1960) “Stability of Earth Dams Upon Drawdown”. Proceedings of 1st PanAm
Conference on Soil Mechanic and Foundation Engineering. Mexico City, Vol 2.
SLOPE/W Example File: Rapid drawdown with multi-stage.docx (pdf) (gsz) Page 8 of 8