Beruflich Dokumente
Kultur Dokumente
Deputy
1040 Satish Raut Manager
Assistant
1439 Bikesh Kumar Manager
Assistant
2085 Pawan Ghogare Manager Timely Actions Taken by the
Desk Engineers led to the
Junior prevention of Unit tripping/Loss
1796 prasoon Barawnal Manager Operation of Generation due to CW-3B
tripped on shaft shear logic
1 Vaibhu Uttam (Current <100 amp and disch
1124 Asst. Engineer
Jadhav press <0.5 ksc)
Junior
1927 Chetan Fulari Manager
Assistant
1439 Bikesh Kumar Manager
Assistant
2085 Pawan Ghogare Manager
Kiran Kumar Assistant
1284 Darapureddy Manager
Assistant
2078 Vishal Bageshar Manager
Timely Actions Taken by the
Desk Engineers led to the
2 Operation prevention of Unit tripping/Loss
of Generation due to ID FAN 4B
VIBRATION IS HIGH.
Assistant
1439 Bikesh Kumar Manager
Assistant
2085 Pawan Ghogare Manager
Assistant
1793 Kundan kumar Singh Manager Timely Actions Taken by the
Senior Desk Engineers led to the
35304 Jagdish Chalageri prevention of Unit tripping/Loss
Engineer
3 Operation of Generation due to CW-4B
tripped on Thrust Brg. Temp.
HH logic ( Thrust Brg. Temp. HH
>> 75 *C )
Timely Actions Taken by the
Desk Engineers led to the
prevention of Unit tripping/Loss
3 Operation of Generation due to CW-4B
tripped on Thrust Brg. Temp.
HH logic ( Thrust Brg. Temp. HH
>> 75 *C )
Junior
1240 Mithun P. Powar Engineer
Vaibhu Uttam
1124 Asst. Engineer
Jadhav
Assistant
1439 Bikesh Kumar Manager
Assistant
2085 Pawan Ghogare Manager
Kiran Kumar Assistant
1284 Darapureddy Manager
Assistant
1796 prasoon Barawnal Manager
Assistant
1793 Kundan kumar Singh Manager
Timely Actions Taken by the
Desk Engineers led to the
prevention of Unit #3 and 4
4 Operation tripping/Loss of Generation due
Senior to U#1 GTCB opened due to
35304 Jagdish Chalageri Engineer electrical fault. Bus C1A , C2A ,
C1B Dead /out.
Junior
1927 Chetan Fulari Manager
Junior
1903 Kishore Kumar Manager
Junior
1240 Mithun P. Powar Engineer
Vaibhu Uttam
1124 Asst. Engineer
Jadhav
Specification/s
Immediately Mills 3A and 3E stopped @12:24 Hrs.and generation reduced from 315
MW to177 MW. Vacuum dropped upto -85.54 Kpa and starts improving and hold at
- 89.77 KPa. Mill 3E and Mill 3A Started @12:34hrs and 12:41 Hrs respectively. Load
normalised upto 270MW generation.ACW pump A & C started.@12:57Hrs.
On 05.01.2018 16:00 Hrs , Unit# 3 running at 257 MW, and 6.6 kv unit bus U2A
was charged from U1B bus. In U#2, when PA fan 2A started it's breaker got flash
over and same time U#1 tripped as GTCB opened. 6.6kv bus U1B, C1A, C2A, C1B
also got tripped due to which following equipments got tripped.1) Main plant
compressors C,D & E ( Comp. A&B were not avavilable as itssupply bus also got
tripped). 2) CCW pump 3A ,3B Tripped. 3)AHP/CHP , SSS , DMP, FPPH Incommer
Trip. 4) BFP 3C and CW PUMP 3/4 C Tripped. 5) ACW 3A,3B,3C Tripped. 6) PA 3A
Tripped (HC working oil O/L Temp high).7)Sea Air fan 3-B pickup in interlock.
8) BFP 3C
Tripped (HC working oil O/L Temp high). 9)ID 3B Tripped (HC workingoil O/L Temp
high) 10)FD 3B Tripped.
11) Bottom Ash System unit 3. 12) CCW 4C Tripped.
1.Mill 3A stopped and load Reduces up to 150 MW From 265 MW 2.CW PUMP
3/4 C U#3 side interconnection mov manually closed. 3. Station bus C1B charged
from C2B, andC1A bus charged from U3B, than bus C2A charged from C1A (@ 16:12
hrs). 4. CCW pump's 3B, 3C started (@ 16:14 hrs)5. BFP 3A Started (16:19 hrs). 6.ID
3B Started (@ 16:20 hrs) 7. ID 3B Started (@ 16:20 hrs) 8.FD FAB 3B Started @
16:24 9. CW 3A Started @ 17:08 hrs .10. ACW3A,3B. Started @17:22 .
11.AHP/CHP , SSS ,
DMP, FPPH Incommer Charge & Bus coupler made open.