Appendix A LIST OF RELEVANT CATEGORIES OF BUILDINGS AND BASE INDICES SUBJECTED TO PRICE VARIATION IN ACCORDANCE WITH THE “SPECIAL PROVISIONS TO THE CONDITIONS OF ‘CONTRACT (VARIATION OF PRICE) FOR BUILDING WORKS" Category Of Building Recovery Factor Base Index (ielevant Categories shall be (of Building Costin region deleted) B_*for the month of ‘Navember 2012") | Single Stowy RC 082 si | Notes: ” 8 © °° 4 Bailing, 24 "Stowy RC Buling with Nat roof 24 "Storey RC Bulling with pitched root 5 Storey and above RC Accommodation Building 5 Storey and above RC Office Buln ‘Timber Bung Timber ling Reinforced» Concrete Pog Penang, Kedah and Perlis Perak \Wiayan Persekutuan, Selangor, Negeri Sembilan and Melaka Johor Pahang Kelantan and Terengganu ‘The ‘Base Index” shal be the appropriate Bulting Cost Indox as stated in the Special Release: 2 published by the Statistic Department for the month during which the tondor closes and only ‘eed tobe insertod pir to the signing ofthe Contract Document ‘Appendix 8 LIST OF MATERIALS TOGETHER WITH QUANTITIES AND BASIC UNIT PRICES SUBJECT TO PRICE VARIATION IN ACCORDANCE WITH THE “SPECIAL PROVISIONS TO THE CONDITIONS. ‘OF CONTRACT (VARIATION OF PRICE) FOR BUILDING WORKS. Materia Unit Quantity | Basic Unit Price ‘A. Mid Steel Round Bars.8S 4449 = 10mm 38") Metric Ton 191.608 2.40857 2 s2mm (12°) | f 16.021 Dasari 2 temm (58°) | oa7 | 2135810 © 20mm = 28mm (4-1) ; si : Samm (1) 5 : : 8, High Tensile Deformed Bars ‘tomm (318°) 2 25512 2463.71 ‘2mm (12) f 113.789 2146014 6mm ~ 25mm (518° — 1") 405.724 2327.29 2emm (4 187) : és a 30mm (4%) 7 s9r4i3 231383 + Quaniies shal be pre ascoiained by te Superintending Offior at tho tine of tendering Notes: 1. The above quantities ar intended forthe purpose of price variation only and do not necessary reflect the actual quantities rquied forthe Contract. The Contactor shall ascertain himself tha actual quantities required upon which his tender is deemed to have been based, 2, Price Variation shall be applied to the above quantities fixed or actual quantities used, whichever isthe lesser. 3. Tho “Basic Unt Prices” shall be the appropriate Unit Price as stated inthe Spocial Release 2 published by the Statistics Deparment for the manth during which the tender closes and only reed tobe inserted prior to the signing of tho Contract Document. Propared By, Endorsed By, Quanity Surveyor Engineer Vertfad By, Superintending Officer Ta Tir aa Faacan tg Rb Boa ‘Shap Poot" Atl "noqa era Pontaonangren Ga nar hs. Kare KRICRUBETEOST :

Das könnte Ihnen auch gefallen