PROJECT PROPOSAL

Project Title

LED Street Light at Unimap Go Kart Circuit

Student’s Name

Abdil Naif Bin. Mohd Radzi

R2420- Electrical
Student’s
: 162160196 Program: Engineering
Matrix Num.

Supervisor’s Name: Encik Jimirafizi Bin Jamil

Co - Supervisor’s Name (if any) :

……………………………………………... ……………………………………………...
(Student’s Signature) (Supervisor’s Signature)

Official
Name : …………………………….... :
Stamp

Date : ……………………………....

Date : ……………………………....

SEMESTRAL PROJECT 1
PPD

INTRODUCTION
Summary of the proposed project.

A street light, light pole, lamppost, street lamp, light standard, or lamp standard is a raised source of

light on the edge of a road or path. When urban electric power distribution became ubiquitous in developed

countries in the 20th century, lights for urban streets followed, or sometimes led. Many lamps have light-

sensitive photocells that activate automatically when light is or is not needed: dusk, dawn, or the onset of

dark weather. This function in older lighting systems could have been performed with the aid of a solar

dial. Many street light systems are being connected underground instead of wiring from one utility post

to another.

On this project I will make a street light for Unimap Go-Kart cicuit that racers can used a track for

night or dark weather. Besides that, it can make a low energy consumption and low maintenance cost

because I will use LED as a source light for race track. So racers can see clearly a track while racing

during a night and dark weather.

SEMESTRAL PROJECT 2
PPD

PROBLEM STATEMENTS AND PROJECT OBJECTIVES


Please state the problem to be studied and objectives of the proposed project in concise terms. Use
additional sheets if necessary.
Problem statements

At Unimap Go-Kart Circuit is no street light so racers can’t use a track at night or dark weather and

it’s can bring a dangerous when they race at track during a night. If we used HID lamps or fluorescent for

a street light at race track it will be a high energy consumption. This can't helped consumers afford easily

these lights for any area of sports so we used a LED and it can save about 70% energy. Besides, LED has

long and predictable lifetime between HID lamps or fluorescent. The lifetime of LED is usually 10 to 15

years. The less frequent need to service or replace LED will mean lower maintenance cost. Finally, will

make it easy for users to turn on and turn off the lights using the phone.

Objective

 To ensure the race track can be used during at night.

 To ensure that street light can control using handphone.

 To provide lighting to the track with a low energy consumption.

 To manage a low cost for maintenance.

SEMESTRAL PROJECT 3
PPD

PROJECT SCOPES
Please state the scopes of the proposed project in concise terms. Use additional sheets if necessary.

The scope in this project, I will use the Light Dependent Resistor (LDR). The LDR is built with circuit

that can turns on when it goes dark. When the light level decreases, the resistance of the LDR increases.

As this resistance increases in relation to the other Resistor, which has a fixed resistance, it causes the

voltage dropped across the LDR to also increase. When this voltage is large enough (0.7V for a typical

NPN Transistor), it will cause the Transistor to turn on. Besides, for a low cost maintenance and energy

consumption I will use LED as source light for track. Finally, I want make a advance system that can

control the led street light ON or OFF using handphone.

SEMESTRAL PROJECT 4
PPD

PROJECT METHODOLOGY
Describe the procedures and methods to be used to achieve the objectives of the proposed project. Use
additional sheets if necessary.
FLOW CHART

Start

Understand the problem

Research information and ideas

Design circuit with a simulation and test


run

Do the prototype

Make a report as result and conclusion

End

SEMESTRAL PROJECT 5
PPD

GANTT CHART
List major activities involved in the proposed project. Indicate duration of each activity to the related month(s).
Project’s YEAR 2018
Activities MONTH W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14
Proposal preparation and submission of
title registration
Submission of project proposal and
proposal defend presentation
Search and buy the project equipment

Start doing the project

Progress report submission

Progress report submission

Draft report submission

Final project and final report


preparation
Logbook submission

Final report submission

Final presentation

SEMESTRAL PROJECT 6