Sie sind auf Seite 1von 10

Project:

ETAP Page: 1
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
1/2 Cycle Network

Swing V-Control Load Total


Number of Buses: 1 0 1 2

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 1 0 0 0 0 0 1

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 1 0 0 0 1 2

System Frequency: 60.00 Hz

Unit System: English

Project Filename: COCBA

Output Filename: C:\ETAP 1260\COCBA\Untitled.SA2


Project:
ETAP Page: 2
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project:
ETAP Page: 3
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus3 SWNG 10.500 10.500 1 100.00 0.00

Bus4 Load 512.000 512.000 1 100.00 30.00

2 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project:
ETAP Page: 4
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 153.750 10.500 512.000 12.00 42.00 0 0 0 0 0 12.0000 YNd 30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T1 153.750 10.500 512.000 D/Y Solid


Project:
ETAP Page: 5
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus3 Bus4 0.19 7.80 7.80


Project:
ETAP Page: 6
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Synchronous Generator Input Data


Positive Seq. Impedance
Synchronous Generator Rating % Xd" Grounding Zero Seq. Impedanc
ID Type MVA kV RPM X"/R %R Adj. Tol. % Xd' Conn. Type Amp X/R % R0 % X0

Gen1 Turbo 151.000 10.500 1800 20.00 1.000 20.00 0.0 28.00 Wye Solid 20.00 0.500 10.00

Total Connected Synchronous Generators ( = 1 ): 151.000 MVA


Project:
ETAP Page: 7
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Lumped Load Input Data

Lumped Load Motor Loads

Imp.
Lumped Load Rating % Load Loading X/R Ratio (Machine Base) Grounding
ID kVA kV MTR STAT kW kvar X"/R X'/R %R % X" % X' Conn. Type Amp.

Lump2 153750.0 512.500 80 20 110700.0 53614.5 10.00 10.00 1.692 16.92 34.62 Delta

Total Connected Lumped Loads ( = 1 ): 153750.0 kVA


Project:
ETAP Page: 8
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus4

Prefault voltage = 512.000 kV = 100.00 % of nominal bus kV ( 512.000 kV)


= 100.00 % of base kV ( 512.000 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus4 Total 0.00 1.349 0.00 102.27 99.22 1.332 1.332 6.36E-001 8.34E+000 1.86E-001 7.80E+000

Bus3 Bus4 37.05 0.535 69.32 70.64 105.40 0.768 1.332 * 8.48E-001 2.10E+001 1.86E-001 7.80E+000
Lump2 Bus4 99.90 0.814 99.90 99.90 99.90 0.564 0.000 1.38E+000 1.38E+001

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project:
ETAP Page: 9
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus4 512.00 0.103 -1.345 1.349 0.080 -1.330 1.332 1.107 0.085 1.110 1.097 0.813 1.365

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project:
ETAP Page: 10
12.6.0H
Location: Date: 07-02-2018
Contract: SN:
Engineer: Revision: Base
Study Case: SC
Filename: COCBA Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus4 512.000 16.66424 218.54560 219.18000 18.54419 241.46390 242.17500 4.87005 204.54220 204.60020

Das könnte Ihnen auch gefallen