Sie sind auf Seite 1von 12

Project: Job Ref

CROSSRAIL Lea Crossing Bridge


Part of Structure: Calc sheet Rev
Loadings 1
Drawing Ref: Calc By: Date: Check By: Date:
ND 8/5/2018
Ref Calculations Output
BS6399-2 Wind
1997
2.2.2.1 Vs = Site wind speed Vb Sa Sd Ss Sp = 21.50 m/s
Fig 6 Vb = basic hourly mean wind speed = 21.00 m/s
2.2.2.2 Sa = altitude factor = 1.02
D = altitude in metres above mean sea level = 24.00 m
2.2.2.3 Sd = direction factor = 1.00
2.2.2.4 Ss = Seasonal factor = 1.00
2.2.2.5 Sp = probability factor = 1.00

2.2.3.2 Ve = Effective wind speed Vs Sb = 37.20 m/s


Table 4 Sb = terrain and building factor = 1.73
effective height 16.70m (worst case span 4), Site in town, >100km from sea

2.1.2.1 qs = Dynamic pressure 0.613 Ve2 = 0.85 kN/m2

Walls

Pe = qs Cpe Ca
Fig 12 D/H = span ratio of building = 8.11 m Span 3 worst case
D = width of building = 107.00 m
H = height of building = 13.20 m

Table 5 Cpe Pe (kN/m2)


Cpe (windward) 0.60 0.45
Cpe (leeward) -0.50 -0.38
Cpe (sideface) -0.90 -0.68 (zone B with
funnelling effect)
2.1.3.4 Cae = size effect factor = 0.89 Line B
a = diagonal dimension = 21.00 m Span 3 worst case

21.3m

31.3m

20.7m

33.2m
~200m

Span 4

Span 3
Span 2

q = 0deg Span 1

q = 90deg
Wind Direction
v

te:

utput

worst case

with
g effect)

worst case
Project: Job Ref
CROSSRAIL Lea Crossing Bridge
Part of Structure: Calc sheet Rev
Loadings 2
Drawing Ref: Calc By: Date: Check By: Date:
ND 8/5/2018
Ref Calculations Output
Roof

Span 4
Span 1 Span Span
2 3

~30deg ~30d
~30de eg
~30de
g
g

Calculation of roof windload assuming the curved roof is multi-bay duo pitch roof

External coefficient (Cpe)


Table 10 Cpe Cpe Cpe
Pitch angle q=0 q=0 q = 90
Zone C Zone G Zone C
-0.20 -0.50
+30 deg -0.60
0.40 -0.50

Size effect factor (Ca)


*q = 0 *q = 90
Dim a Cae Dim a Cae
Span 1 13 0.92 21 0.90 Line B
Span 2 13 0.92 21 0.90 Span 3 worst case
Span 3 13 0.92 21 0.90
Span 4 13 0.92 21 0.90
* Figure 4, line B

External surface pressure, Pe (kN/m2)


q=0 q = 90
Zone C Zone G Zone C
-0.16 -0.39
Span 1 -0.46
0.31 -0.39
-0.12 -0.31
Span 2 -0.46
0.25 -0.31
-0.09 -0.23
Span 3 -0.46
0.19 -0.23
-0.09 -0.23
Span 4 -0.46
0.19 -0.23
Table 12 Factored by 1.0 upwind bay, 0.80 second bay, 0.6 remaining bays

Internal Pressure, Pi (kN/m2)


Direction Cpi Cai Pi (kN/m2)
Tab 18 q = 90 0.85 0.74 0.53
-0.60 0.74 -0.38
q=0
0.52 0.74 0.33
One open face

Fig 4 Cai = size effect factor = 0.74 Line B


a = diagonal dim of open space (1072+ 7.92) 0.5 = 107.3 m Span 3 worst case
or 0.2 x (internal Volume1/3) 0.2 (200 x 107 x 7.9)1/3 = 11.1 m
Project: Job Ref
CROSSRAIL Lea Crossing Bridge
Part of Structure: Calc sheet Rev
Loadings 3
Drawing Ref: Calc By: Date: Check By: Date:
ND 8/5/2018
Loadcase Calculations Output
All units in (kN/m2) 0.83

A9/10 Wall load case 1 or 2 - Wind 0deg, -0.60Cpi Span 1

Zone Cpe Cpi P


Span 2
windward 0.45 -0.38 0.83 -0.30 -0.30
leeward -0.38 -0.38 0.00 Span 3

side -0.68 -0.38 -0.30


Span 4

0.00
not critical Roof load case 1 - Wind 0deg, -0.20Cpe, -0.60Cpi
Cpe Cpi P
upwind dnwind upwind dnwind 0.22 0.25 0.28 0.28
Span 1 -0.16 -0.39 -0.38 0.22 -0.01
Span 2 -0.12 -0.31 -0.38 0.25 0.06 -0.01 0.06 0.14 0.14
Span 3 -0.09 -0.23 -0.38 0.28 0.14
Span 4 -0.09 -0.23 -0.38 0.28 0.14

A9/10 Roof load case 2 - Wind 0deg, +0.40Cpe, -0.60Cpi


Cpe Cpi P
*upwind dnwind upwind dnwind 0.69 0.63 0.56 0.56
Span 1 0.31 -0.39 -0.38 0.69 -0.01
Span 2 0.25 -0.31 -0.38 0.63 0.06 -0.01 0.06 0.14 0.14
Span 3 0.19 -0.23 -0.38 0.56 0.14
Span 4 0.19 -0.23 -0.38 0.56 0.14

0.13

A11/12 Wall load case 1 or 2 - Wind 0deg, -0.60Cpi Span 1

Zone Cpe Cpi P


Span 2
windward 0.45 0.33 0.13 -1.01 -1.01
leeward -0.38 0.33 -0.70 Span 3
side -0.68 0.33 -1.01
Span 4

-0.70
not critical Roof load case 3 - Wind 0deg, -0.20Cpe, +0.52Cpi
Cpe Cpi P
*upwind dnwind upwind dnwind -0.48 -0.75 -0.65 -0.65
Span 1 -0.16 -0.39 0.33 -0.48 -0.72
Span 2 -0.43 -0.31 0.33 -0.75 -0.64 -0.72 -0.64 -0.56 -0.56
Span 3 -0.32 -0.23 0.33 -0.65 -0.56
Span 4 -0.32 -0.23 0.33 -0.65 -0.56
* Span 2 to 4 treated as troughed downwind face

A11/12 Roof load case 4 - Wind 0deg, +0.40Cpe, +0.52Cpi


Cpe Cpi P
upwind dnwind upwind dnwind -0.01 -0.08 -0.14 -0.14
Span 1 0.31 -0.39 0.33 -0.01 -0.72
Span 2 0.25 -0.31 0.33 -0.08 -0.64 -0.72 -0.64 -0.56 -0.56
Span 3 0.19 -0.23 0.33 -0.14 -0.56
Span 4 0.19 -0.23 0.33 -0.14 -0.56
Project: Job Ref
CROSSRAIL Lea Crossing Bridge
Part of Structure: Calc sheet Rev
Loadings 4
Drawing Ref: Calc By: Date: Check By: Date:
ND 8/5/2018
Loadcase Calculations Output

-1.21

A8 Wall load case 4 - Wind 90deg, +0.85Cpi Span 4

Zone Cpe Cpi P


Span 3
windward 0.45 0.53 -0.08 -0.08 -0.91
leeward -0.38 0.53 -0.91 Span 2

side -0.68 0.53 -1.21


Span 1

-1.21
A8 Roof load case 4 - Wind 90deg, -0.60Cpe, +0.85Cpi
Cpe Cpi P -0.99 -0.99 -0.99 -0.99
Span 1 -0.46 0.53 -0.99
Span 2 -0.46 0.53 -0.99
Span 3 -0.46 0.53 -0.99
Span 4 -0.46 0.53 -0.99
-4.04
-4.04
-4.04
-4.04

Das könnte Ihnen auch gefallen