Beruflich Dokumente
Kultur Dokumente
Walls
Pe = qs Cpe Ca
Fig 12 D/H = span ratio of building = 8.11 m Span 3 worst case
D = width of building = 107.00 m
H = height of building = 13.20 m
21.3m
31.3m
20.7m
33.2m
~200m
Span 4
Span 3
Span 2
q = 0deg Span 1
q = 90deg
Wind Direction
v
te:
utput
worst case
with
g effect)
worst case
Project: Job Ref
CROSSRAIL Lea Crossing Bridge
Part of Structure: Calc sheet Rev
Loadings 2
Drawing Ref: Calc By: Date: Check By: Date:
ND 8/5/2018
Ref Calculations Output
Roof
Span 4
Span 1 Span Span
2 3
~30deg ~30d
~30de eg
~30de
g
g
Calculation of roof windload assuming the curved roof is multi-bay duo pitch roof
0.00
not critical Roof load case 1 - Wind 0deg, -0.20Cpe, -0.60Cpi
Cpe Cpi P
upwind dnwind upwind dnwind 0.22 0.25 0.28 0.28
Span 1 -0.16 -0.39 -0.38 0.22 -0.01
Span 2 -0.12 -0.31 -0.38 0.25 0.06 -0.01 0.06 0.14 0.14
Span 3 -0.09 -0.23 -0.38 0.28 0.14
Span 4 -0.09 -0.23 -0.38 0.28 0.14
0.13
-0.70
not critical Roof load case 3 - Wind 0deg, -0.20Cpe, +0.52Cpi
Cpe Cpi P
*upwind dnwind upwind dnwind -0.48 -0.75 -0.65 -0.65
Span 1 -0.16 -0.39 0.33 -0.48 -0.72
Span 2 -0.43 -0.31 0.33 -0.75 -0.64 -0.72 -0.64 -0.56 -0.56
Span 3 -0.32 -0.23 0.33 -0.65 -0.56
Span 4 -0.32 -0.23 0.33 -0.65 -0.56
* Span 2 to 4 treated as troughed downwind face
-1.21
-1.21
A8 Roof load case 4 - Wind 90deg, -0.60Cpe, +0.85Cpi
Cpe Cpi P -0.99 -0.99 -0.99 -0.99
Span 1 -0.46 0.53 -0.99
Span 2 -0.46 0.53 -0.99
Span 3 -0.46 0.53 -0.99
Span 4 -0.46 0.53 -0.99
-4.04
-4.04
-4.04
-4.04