Commissioning Check List E

Restricted
ANSI 59NDC/ 51NDC
CL-E137 Earth Fault Protection in
DC Circuit
Primary Injection Tests
Panama Colon PP BB001062
Power Plant Plant Code

System: Protection/ Synchronization and Metering (Generator)

Component: MKA-A1 – Rotor earth fault relay

Page: 1 of 1 Appendices:

No. Activity (Items not applicable to be marked N/A) Remarks Confirmed

1. Technical data: See device coversheet

Secondary injection checklist CL-E237 available 

2. Primary tests

Measuring values

Ripple component of Excitation current


Insulation resistance [kΩ]
excitation current [%] [A]

3. Evaluation

Measured Ripple component of excitation current negligible 

4. Remarks:
........................................................................................................................................................................................ 1

......................................................................................................................................................................................... 2

Department: ........................................................ Name: .......................................................................

Date:. ...................................................................... Signature: .............................................................

Transmittal, reproduction, dissemination and/or editing of this document as well as utilization


of its content and communication thereof to others without express authorization are prohibited.
Project Site Execution Offenders will be held liable for payment of damages. All rights created by patent grant or
registration of a utility model or design patent are reserved.

Das könnte Ihnen auch gefallen