3 year EPC Project – Overall Engineering sequence

Project Month 6 12 18
Piping materials supply 70% piping
IFR P&ID IFD H
materials
A In-line In-line instr.
P&IDs review PIDs delivered
Z instr. POs Vendor dwgs Last
Piping 1st O nd Package IFC Start
classes Piping 2 1st
IFC
P Eqt Vendor vendor PIDs Piping
Line MTO (IFI) Piping P&IDs
dwgs dwgs fab.
Diagr. MTO
Fluids
General UG (IFP)
list Pipe supports MTO
networks
1st 50% up-
Fire Piping isos dates
PR PR str
Plot Protection PO Piping MTO
calcs dwgs
Plan Main cable Piping studies up-dates
PFDs IFC Piping
IFR routing PR
HMB Plot Plan Isometrics
Stress analysis found
Review IFC
Eqt 30% 60% 90%
IT system
sizing
& list
set-up model
review
3D MODEL XXX
model
review
XXXX model
review
Haz.
area HX sizing UG piping Piping
IFD Plot IFC Plot Process GADs
class Eqt Guide & cable
Plan Plan str IFC
drawings trench IFC
Eqt PDS Equipment GADs Eqt Final Equipment,
Eqt bids
Equipment POs found packages and in-line
Eqt spec Eqt setting IFC instrument vendor
MDS, Eqt plan & loads dwgs
MSD
MR TBTs © The Oil & Gas Engineering Guide, Editions Technip