Sie sind auf Seite 1von 23

MODERNIZATION OF AN OIL-TERMINAL DOCK INFRASTRUCTURE

USING GEOTEXTILE CONTAINMENT TECHNOLOGY, CONCRETE


FILLED GEOTEXTILE TUBES.

CAMPECHE, MEXICO, “CASTILLO BRETON” DOCK PEMEX.


ANGEL H DÍAZ JR.
ahds@geoygeo.com.mx
LOCALIZATION & HISTORY
LOCALIZATION & HISTORY
LOCALIZATION & HISTORY
LOCALIZATION & HISTORY
LOCALIZATION & HISTORY
THE CHALLENGE
MODERNIZATION
DOCK INFRAESTRUCTURE
 Mechanical
 Electrical
 Civil
 Protection & Safety
THE SOLUTION - PROJECT

ROCK CONCRETE CUBES GEOTUBE


COSTS 1 1
72.50 127.50 151.50
(USD / m3)
The cost includes scour-
It requires on-site
It requires steel ribs, frames, apron (FPM2), mortar
accommodation and more
ADDITIONAL material for gaps and
space for off-site mix, marine concrete
construction, and cranes. mix, machinery and
irregularities.
labor.
124 124
PERFORMANCE
(matching the performance of (matching the performance of 124
(m3 / day)
using the Geotube alternative) using the Geotube alternative)

It would require placing ≈16


It would involve 24 haulage This is the average
units of 2m×2m×2m cubes
(trucks) daily and their performance on site and
NOTES respective environmental
per day and a 16ton crane in
limited by the supply of
place at least 16 hours a
impact. the marine concrete mix.
day.

No need in the short term.


Short term inspection and
Required in the long term No need and no concrete
possible replace because of
MAINTENANCE settling, erosion, wave attack and environmental impact for deterioration inside the
concrete exposure and geotextile tube.
and storms.
deterioration to the sea.
THE SOLUTION - PROJECT
MASTER PLAN
THE SOLUTION - PROJECT
MASTER PLAN
THE SOLUTION - PROJECT
MASTER PLAN
 Choosing the concrete
 Concrete properties f’c= 200 kg/cm2
CLASSIFICATION CHARACTERISTICS APPLICATIONS
General construction, most
Fairly high C3S content for good
TYPE I General purpose
early strength development
buildings, bridges, pavements,
precast units, etc.

Moderate sulfate Structures exposed to soil or


TYPE II resistance
Low C3A content (<8%)
water containing sulfate ions.

Ground more finely, may have Rapid construction, cold weather


TYPE III High early strength
slightly more C3S concreting.

Low heat of hydration Massive structures such as


TYPE IV (slow reacting)
Low content of C3S (<50%) and C3A
dams. Now rare.

Structures exposed to high


TYPE V High sulfate resistance Very low C3A content (<5%)
levels of sulfate ions.

Decorative (otherwise has


WHITE White color No C4AF, low MgO
properties similar to Type I).
THE SOLUTION - PROJECT
MASTER PLAN
 Choosing the geosynthetic
 Geotextile tube properties
THE SOLUTION - EXECUTION
THE SOLUTION - EXECUTION
THE SOLUTION - EXECUTION
THE SOLUTION - EXECUTION
THE SOLUTION - EXECUTION
THE GEOTUBE ADVANTAGE

TECHNICAL ENVIRONMENTAL
 Custom made construction  Polypropylene fabric, inert
elements. material.
 Heavier elements increasing  Fixing of marine life on the
stability and resistance to surface, increasing
wave action. resistance to UV.
 Cost effective vs haulage of  Replace the transport of
rock. foreign materials.
 High performance and time  Less carbon footprint vs
savings. other construction methods.

ASA
THE SOLUTION – RESULTS (AFTER 3 YEARS)

2016
2013
THE SOLUTION – RESULTS (AFTER 3 YEARS)

2016
2013
THE SOLUTION – RESULTS (AFTER 3 YEARS)

2016
2013
THE SOLUTION – RESULTS (AFTER 3 YEARS)

2016
OBRIGADO!
GRACIAS!
THANK YOU!
ANGEL H DÍAZ JR.
ahds@geoygeo.com.mx