SITE PREPARATION AND EARTHWORKS

Amount
Bil. Description FROM PAGE NO
RM Sen

SUMMARY

1 SITE PREPARATION AND EARTHWORKS B2/1/14

CARRIED TO SUMMARY OF TENDER RM

B2 JUB SEKUTU
BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

SPECIFICATION AND GENERAL LABOUR


CLAUSE

For description of Materials and


Workmanship And General Labour
applicable to this Bill see Specification
And Preambles

GENERALLY

A All earthworks are measured from the


existing ground level. The bulk excavation
for basement and general site earthwork
are measured in this Bill

B The Contractor shall be held to have visited


the site and ascertained the exact nature
and extent of the site and earthworks to be
carried out. No claim whatsoever in this
respect will be entertained

C The whole of the works are to be carried


out in a manner to be approved by the S.O.

D The Contractor's attention is specifically


drawn to the presence of existing building
surrounding the site and any constraints in
carrying out the works and he shall allow in
his rates for any costs and expenses arising
in this connection and no claims
whatsoever will be later entertained

E Excavation shall be executed in a manner


to ensure that no damage is caused to
permanent works such as bored pile,
etc. The Contractor shall allow in his
rates for working around/within the
restraint of these structures, hacking off
and removing bulging and overcast in
bored piles and any other obstructions

to collection RM

B2/1/1 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

SPECIFICATION AND GENERAL LABOUR


CLAUSE (cont'd)

A The Contractor's Professional Engineer


shall, jointly with the Contractor, prepare
complete and adequate designs, shop
drawings, specification, method statements,
sequence and schedule of placement of
all necessary temporary works such as
earth retaining structures, drainage and
dewatering or groundwater control
systems, ground movement monitoring
systems, protective hoardings, barricades
and signages and etc to enable the
excavation to be safely carried out and
maintained with minimal disturbance to
neighbouring structures, roads, and other
properties, all to the acceptance and
satisfaction of the S.O. The Contractor's
Professional Engineer shall be responsible
for supervising all temporary works
construction to the requirements of his
design and specification

B The Contractor is to note that he is fully


responsible for all design and construction,
maintenance throughout the duration of the
Contract and removal (if required) and in full
compliance to Authorities' requirements
of the works. The temporary works shown
in the tender drawings and quantities
measured herein are only indicative as a
guide for minimum requirements. The
Contractor shall make good, adapt and alter
or relocate as necessary throughout the
duration of the Contract.

C The Contractor is to allow for all other works


required whether measured herein or not,
necessary to enable the execution of the
works. No claim whatsoever in this respect
will be entertained

to collection RM

B2/1/2 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

SPECIFICATION AND GENERAL LABOUR


CLAUSE (cont'd)

A The Contractor and his Professional


Engineer shall supervise the performance
of all temporary works and monitor lateral
and vertical ground movements, including
related soil parameters such as
groundwater table level etc. All performance
measurement shall be recorded and made
available to the S.O. for his record. The
Contractor shall be responsible for and
execute in a timely manner all corrective
measures made necessary due to either his
failure to comply with the specified and/or
statutory imposed requirements on
permissible lateral and vertical ground
movements or any other inadequacy in his
design and/or construction of the temporary
works. The Contractor shall be responsible
for all consequent damages caused by his
failure to construct in accordance with his
submitted designs and method statements
or by his failure to adopt adequate safety
precautions and to observe good
engineering practices in his construction
operations

B The Contractor shall pay all Royalties and


the cost thereof shall be deemed to be
included in the tender rates

C Excavated materials from bulk excavation


works can be used to make up levels on
site, if approved by the S.O.

D The measurement of all excavation and


subsequent disposals shall be those
before excavation. All excavation and fillings
are measured nett. The increase in bulk
after excavation or shrinkage in
consolidation shall be allowed for in the
Contractor's rates

to collection RM

B2/1/3 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

SPECIFICATION AND GENERAL LABOUR


CLAUSE (cont'd)

A The rates for bulk excavation shall include


excavation below water table level,
excavating in whatever soil except rock, and
the formation of embankments on slopes
or terrace. The rates shall also held to
include all multiple handling on site

B Rates shall also be deemed inclusive of


excavation and backfilling around retaining
walls, if any

C The Contractor's rates shall also include for


working in adjacent areas of the site
boundary for the proper completion of the
works

D The Contractor shall note that the whole of


the earthwork are measured as bulk
earthworks and no allowance is made for
excavation in stages. The Contractor shall
allow in his excavation rates for complying
with this and no claim will be entertained

E The Contractor shall obtain the necessary


approval or permit from Local Authorities
having jurisdiction over dumping tip within
or outside territory. He shall indemnify the
Employer for any loss and expenses
arising from his illegal dumping without the
necessary approval or permit

E Allow for keeping the whole of the excavation


including excavation below water table level
free from rain and percolating water by
pumping, baling, or other dewatering
method to be approved by the S.O. Item

to collection RM

B2/1/4 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

A Allow for protection and maintenance of all


existing services as found such as pipes,
ducts, sewers, manholes, mains,
underground and overhead cables, streets
lights, etc. including relocation and
reinstatement as deem necessary to Local
Authority's requirements during the
execution of the works Item

B Allow for keeping all existing monsoon and


surfaces water drain in proper flow and
working order and maintain same by
means approved by Local Authorities and to
the satisfaction of the S.O. during execution
of works Item

C Allow for periodic maintenance and


desilting of drains and silt trap to maintain
proper flow and working order as directed
by the S.O. Item

D Allow necessary slope protection including


polythene sheet as described or other
means approved by the S.O. Item

E Allow for temporary works whether or not


specifically shown in the drawings or stated
or indicated in the Contract Documents and
keep them in working order, maintain same
throughout the duration of the Contract and
remove on completion of the works all to the
S.O.'s satisfaction Item

SITE CLEARANCE
F Clear the site within the site boundary on flat
and/ or undulating ground surfaces as
shrubs, crops and superflous vegetation,
remove all fallen tree trunks, tree stumps,
etc., cut down existing trees, irrespective of
growth and girth, grub up roots, break up any
hardstandings etc. and all related works and
structures and remove all debris from site,
all to the satisfaction of the S.O.
(Approximated area measured flat from plan
:- 57,600 m2 ) Item

to collection RM

B2/1/5 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Excavated to remove top soil


A Excavate to remove top soil and stockpile at
the Contractors own dump site average
150mm thick m3 8,640

EARTHWORKS
B Excavating oversite or in bulk through all
classes of materials to final requisite road
and building platform from existing ground
level and get out; form sloped and steeped
embankment in cut ground with berms to
form steps; getting out, levelling, sides
trimming, ramming, part returning,
compacting, and all necessary temporary
works inclusive of planking and strutting;
including excavation for basement retaining
wall and to the base of raft slab
m3 38,450

Selected excavated materials; filling,


spreading, levelling and compacting in
layers

C To reduce level; generally m3 22,250

Disposal of Excavated Material


D Removing excavated materials; off site to
designated area (in radius 2 km) including
spread and levelled and consolidated in
layers not exceeding 300mm thick complete m3 16,200
with turfing

E Removing excavated unsuitable materials;


off site include load, transport and cart away
from site as directed m3 2,000

Construct temporary earth drain at


platform level

F Excavate earth drain 1800mm wide


x 600mm deep, get out, part return,
fill in and ram and backfill with
excavated materials upon completion of
works as directed by the S.O. and
Engineer's Detail Drawing (KS58714/
/KL/EW/DET/01) m 2,024

to collection RM

B2/1/6 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Construct berm drain at


platform level

A Excavate Earth Berm Drain 900mm wide


x 300mm deep comprising of 230mm
rubble pitching grouted in cement mortar,
get out, part return, fill in and ram
and backfill with excavated materials
upon completion of works as directed
by the S.O. and Engineer's Detail
Drawing (KS58714//KL/EW/DET/03) m 63

Cascade Drain
B Vibrated reinforced concrete G25 in cast
in-situ concrete cascade drain 300mm
wide (internal) x 1500m deep to invert
with 100mm thick base reinforced with one
one layer of BRC No. A6 mesh
reinforcement and including forming outlet,
mild steel handrail, concrete haunching,
10mm thick joint at 5000mm c/c with
12mm diameter reinforcement steel bar at
200mm c/c and all necessary excavation
and formwork as per Engineer's Detail
Drawing (KS58714//KL/EW/DET/03) m 37

Interlocking Paving Block at Main Entrance

C Heavy duty interlocking paving block; overall


size 28000mm x 10000mm wide; comprising
80mm concrete paving blocks with 210mm
x 100mm x 100mm edge restraints, on
30mm sand beddings, kerb, epoxy mortar
asphatic concrete premix laid to fall at
both sides of interlocking paver, drainage;
including all excavation, backfilling, punch
thru, disposal offsite and all necessary
works, maintaining, repairing whenever
required and making good after completion
of the works. Item

to collection RM

B2/1/7 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Temporary Access Road

A 200mm Thick concrete pavement and


including all necessary excavation,
maintaining, repairing whenever required
and making good after completion
as per Engineer's Detail Drawing
KS58714/KL/EW/DET/04) m2 228

Wash Trough

B Wash trough overall size 9000mm x


6513mm; consist of 150mm thick well
hardcore on compacted ground ; washing
area 9000mm x 4572mm x 1369mm high
comprising of 150mm thick concrete base
(1:3:6) cast to fall with 300mm wide
thickening at sides to form slope and
one layer of BRC A7, 250mm thick
Grade 20 concrete wall all around and
600mm thick grade 20 intermediate
concrete wall with 5 nos of 12 mm high
high tensile reinforcement on top of PVC
pipe; 4 nos of 250mm diameter PVC pipe;
305 x 165 x 45kg/m I-Beam; 25mm
diameter high tensile bars at 75mm c/c
welded to top of I-Beam; trap 1941mm
x 6600mm x 1675mm high comprising of
150mm thick mass concrete with one
layer of wiremesh A7 as concrete base
cast to fall; 113mm thick brickwall with
20mm thick cement mortar (1:3)
plastering internaly; hard standing surface
comprising of 150mm hardcore with
150mm thick Grade 15 concrete slab;
complete with all connection to and from
inlets and outlets; including forming all
openings, excavation, backfilling, punch
thru, disposal offsite and all necessary to
complete works; all to S.O and MBSA's
approvals; including all necessary
desiting, maintaining and repairing
whenever required for the duration of the
contract as per Engineer's
Detail Drawing (KS58714/KL/EW/DET/02) No 1

to collection RM

B2/1/8 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Brick Sump

Supply, construct and complete brick


sumps, constructed of 230mm thick
concrete base Grade 25 with a layer
of BRC A8, 50mm thick lean concrete,
230mm thick brickwall in common bricks
with 20mm thick (1:3) cement and
sand plastering internally and all
necessary excavation and formwork
all as per Engineer's detail and to the
S.O's approval

A Brick sumps size 1800mm x 180mm


(internal) x 1500mm deep No 5

Pipe culvert

Supply, construct and complete precast


concrete pipe culvert Class 'X' including
150mm thick concrete surround Grade 25, a
layer of BRC A10, 200mm thick concrete
Grade 25 as base, 50mm thick lean
concrete, rebated joint culvert, including all
necessary excavation, formwork and all as
per detail drawing no.
(KS58714/KL/EW/DET/04)

B 900mm diameter RC pipe culvert m 32

to collection RM

B2/1/9 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Silt Trap 1

A Temporary silt trap overall size 62000mm


x 27000mm x 1600mm depth; 2 layer
1000 x 1000 x 1000mm gabion wall filled
with geotextile type 'D' or equivalent;
600 x 300 x 300mm high principal
spillway consist of 10mm diameter mild
steel reinforcement bar, 6 mm mild steel
anti-vortex plate, 2 nos 300mm diameter
steel perforated with 4 nos of 20mm
diameter holes at 200mm c/c, 300mm
diameter barrel pipe with anti seep collar ,
150mm thick grade 30 concrete wall
all around and 150mm thick grade 30
concrete base with a layer of BRC A6
on top of 50mm concrete screed grade
15 including continuos fillet weld around
riser piper including 450 x 300mm high
emergency spillway with 300mm diameter
rip-rap scour protection to existing main
drain; complete with all connection from
and to inlets; including all excavation,
backfilling, punch thru, disposal offsite and
all necessary to complete the works;
all to S.O and MBSA's approvals including
maintaining and repairing whenever
required for the duration of the contract
. Refer to engineer's detail drawing
(KS58714/KL/EW/DET/01) No 1

to collection RM

B2/1/10 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

The following in Wing Wall :-

Concrete Grade 15 lean concrete as


described :-

A Apron slab m3 1

Vibrated reinforced concrete Grade 25 as


described :-

B Wing wall m3 4

C Head wall m3 2

D Apron slab m3 4

Mild steel rod reinforcement as described :-

In wing wall

E 10 - 12 mm diameter kg 640

In head wall

F 10 - 12 mm diameter kg 300

In apron slab

G 10 - 12 mm diameter kg 484

Sawn formwork as described :-

H To sides of wing wall m2 20

I To sides of wing wall m2 9

J To edge of apron slab m 20

(End of Wing Wall )

to collection RM

B2/1/11 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Seeding and Turfing

A Closed turfing on sloping ground with


approved turf obtained from the
Contractor's own source including
providing black vegetable soil, forking
ground, treating with fertiliser and
protecting, tendering and maintaining
as described m2 3,975

Utilities Mapping

B Allow for utilities mapping prior to any


commencement of physical works in order
to protect any underground services
Item

Dilapidation Survey

C Allow for dilapidation survey all existing


surrounding building including preparation of
report for monitoring purpose
Item

Temporary Hoarding

To construct and maintain 3600mm high x


0.36mm thick approved corrugated metal
sheet cladding as temporary hoarding and
fixed to rectangular or/and square mild steel
hollow section as steel framing and
hardwood timber framing with all jointing,
cutting, welding, fixing with bolts, nuts,
washers, nails and other necessary fixing
and including selected painting formwork
and other associated works all as per
approved by the S.O.

D 3600mm high x 0.36mm thick m 1,262

E 6000mm high x 0.36mm thick m 355

to collection RM

B2/1/12 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Metal Deck Gate

A To construct and maintain 0.36mm thick


approved corrugated metal sheet as a
double leaves swing gate overall size
6000mm x 3600mm high and fixed to
rectagular or/and square mild steel hollow
section as steel door framing with all
jointing, cutting, welding, fixing with bolts,
nuts, washers, nails, ironmongeries and
other necessary fixing and including
selected painting on exposed surfaces as
specified complete with all excavation,
reinforced concrete Grade 25,
reinforcement, formwork and other
associated works as specified all as per no 1
approved by the SO.

to collection RM

B2/1/13 JUB SEKUTU


BILL NO.2 - SITE CLEARANCE, EARTHWORKS
ELEMENT NO.1 - SITE PREPARATION AND EARTHWORKS

Bil. Description Unit Quantity Rates Amount


RM Sen

Collection

Page B2/1/1

Page B2/1/2

Page B2/1/3

Page B2/1/4

Page B2/1/5

Page B2/1/6

Page B2/1/7

Page B2/1/8

Page B2/1/9

Page B2/1/10

Page B2/1/11

Page B2/1/12

Page B2/1/13

to summary RM

B2/1/14 JUB SEKUTU