Sie sind auf Seite 1von 1

NOTES

KEYPLAN GENERAL NOTES DRAWING REGISTRY 1. FOR ALL AIR-CONDITIONING SERVICES, ALL
VOLUME DAMPERS SETTING AT STUB-OUT
SHALL BE PERMANENT/FINAL UPON
ME-LOD-FF026-00 CAFE UNIT FF-026 COVER PAGE COMPLETION OF BALANCING WORKS.
· ALL DIMENSIONS ARE IN MILLIMETERS
16 21 27 33 39 45 51 57 64 69 · DIMENSIONS ARE ONLY INDICATIVE AND MAY CHANGE DUE TO SITE CONDITIONS ME-LOD-FF026-01 CAFE UNIT FF-026 FLOOR PLAN MEPF LAYOUT TENANT/TENANT CONTRACTOR IS
13 19 24 30 36 42 48 54 60 66 72 · TENANT / TENANT CONTRACTOR TO VERIFY DIMENSION ON SITE PROHIBITED IN ADJUSTING/MODIFY THE
· TENANT OF F&B UNIT WHICH DOES NOT HAVE A DESIGNATED SERVICE ACCESS SETTING WITHOUT PROPER
C TO COMPLY WITH AUTHORITY'S REQUIREMENT TO PROVIDE A REFRIGERATED BIN AUTHORIZATION FROM THE LANDLORD.
F HOLDING SPACE WITHIN THE PREMISE. TENANT TO UTILISE THE EXISTING FLOOR 2. DUCTED RETURN SYSTEM SHALL BE USED
H TRAPS AND PROVIDE NECESSARY WATER-PROOFING AND INSULATION FOR TENANT FAN COIL UNITS. TENANT
L · TENANCY LEASE PLAN FOR THE MEP WORKS ARE DIAGRAMMATIC AND ARE SHOULD EXTEND THE RETURN AIR &
P INTENDED TO CONVEY GENERAL ARRANGEMENT ONLY, TENANT / TENANT EXHAUST AIR STUB-OUT BELOW FALSE
CONTRACTOR SHALL VERIFY THE ACTUAL POSITION OR LOCATION OF MEP CEILING IF FALSE CEILING IS PROVIDED
S WITHIN THEIR RETAIL UNIT.
SERVICES ON SITE, PRIOR TO TENANCY FIT-OUT WORKS.
V · LOCATION OR POSITION OF SERVICES MAY CHANGE DUE TO ACTUAL SITE 3. ALL EQUIPMENT, PIPING, DUCTWORK ETC.,
Y CONDITIONS. SHALL BE SUPPORTED AS DETAILED,
SPECIFIED AND REQUIRED.
CC 4. INSTALL ALL MEP EQUIPMENT AND
FF APPURTENANCES IN ACCORDANCE WITH
LANDLORD MANUFACTURER’S RECOMMENDATIONS,
JJ MECHANICAL SERVICES REMARKS CONTRACT DOCUMENTS AND APPLICABLE
PROVISION
NN CODES AND STANDARDS.
· CHILLED WATER SUPPLY AND RETURN YES DIAMETER: 50mm 1.26 L/s FLOWRATE 5. FOR COLD WATER SUPPLY , TENANT IS
PIPES COMPLETE WITH ISOLATING VALVES. ALLOWED TO CONNECT TO ONLY ONE
FF-026 WHEN MULTIPLE STUB-OUTS ARE
N · CONDENSATE DRAIN PIPE NO PROVIDED INSIDE THE UNIT.
FIRST FLOOR 6. AS PER THE DISTRICT COOLING PROVIDER,
· RETURN AIR DUCT TEE-OFF NO
CHILLED WATER SUPPLY TEMPERATURE =
· EXHAUST AIR DUCT TEE-OFF YES DUCT SIZE: 300x200mm 185 L/s FLOWRATE 6.5°C. CHILLED WATER RETURN
UNIT LOCATION
A
BL

TEMPERATURE = 16°C.
· SMOKE CONTROL EXHAUST AIR DUCT NO
QI

7. TENANT SHALL INSTALL OWN UNDER SINK


DUCT SIZE: 300x200mm 165 L/s FLOWRATE FULLY AUTOMATED GREASE TRAP
LEGEND ·
·
MECHANICAL VENTILATION FRESH AIR DUCT
KITCHEN EXHAUST AIR DUCT
YES
NO
INTERCEPTOR FROM THE SINK PRIOR
CONNECTING LANDLORD KITCHEN WASTE
· KITCHEN SUPPLY AIR DUCT NO PROVISIONS.
ELECTRICAL PUBLIC HEALTH
8. TENANT SHALL INSTALL OWN WATER
ELECTRICAL SERVICES
IFU INTERFACE UNIT WP WASTE PIPE 2x4C 95mm² XLPE/SWA/PVC+ HEATER SYSTEM AND ASSOCIATED PIPE
BREAKER: 160A (TCL : 75.00 kW) CABLE SIZE: WORK WITHIN THE DEMISES FROM THE
CM CONTROL MODULE KWP KITCHEN WASTE PIPE · POWER SUPPLY ISOLATOR WITH INCOMING CABLES YES 2x1C 50mm² CU/ECC
LANDLORD STUB OUT PROVISIONS.
· CONSOLIDATION CABINET NETWORK UNIT WITH FIBER OPTIC CABLES YES 4 LINES 9. THE TENANT TO INSTALL OWN WATER
3 PHASE ISOLATOR VP VENT PIPE
DISTRIBUTION TO MEET THE REQUIRED
MM MONITORING MODULE CDP CONDENSATE DRAIN PIPE · FIRE ALARM INTERFACE UNIT (REFER TO SCHEDULE) YES
PRESSURE FROM THE LANDLORD METERED
CC
CONSOLIDATED CABINET KWVP KITCHEN WASTE VENT PIPE · ESSENTIAL POWER PROVISION FOR SMOKE EXTRACT(REFER TO SCHEDULE) NO LINES.

SOCKET OUTLET SP SOIL PIPE · CONTAINMENT FOR GSM SYSTEM-(CABLES & ANTENNAS EXCLUDED) YES

CT CABLE TRAY BCWS BOOSTER COLD WATER SUPPLY · SMOKE DETECTORS YES

S SMOKE DETECTOR LPG LIQUEFIED PETROLEUM GAS · EMERGENCY LIGHTS YES

E EMERGENCY LIGHT FG FLOOR GULLY FIRE PROTECTION SERVICES


MECHANICAL RP RODDING POINT · SPRINKLER STUB OUT PROVISIONS YES DIAMETER: 80mm.

SAD SUPPLY AIR DUCT FIRE PROTECTION · VALVE STUB OUT FOR STAND PIPE AND FHR NO
EAD EXHAUST AIR DUCT ZCV ZONE CONTROL VALVE PLUMBING SERVICES
FAD FRESH AIR DUCT · COLD WATER SUPPLY PIPE COMPLETE WITH ISOLATING VALVE YES DIAMETER: 32mm
FP FIRE PROTECTION
KED KITCHEN EXTRACT DUCT WRS WET RISER STAND PIPE DRAINAGE SERVICES
BTU BTU METER UPRIGHT SPRINKLER HEAD · WASTE AND VP PROVISIONS. YES FOR NUMBER AND LOCATION OF STUB OUTS REFER TO DRAWINGS
CHWF&R CHILLED WATER FLOW & RETURN SUPERVISION VALVE ALL CDP TO BE CONNECTED TO WASTE PIPE WITH TRAP.

F/B FROM BELOW FIRE ALARM LPG SERVICES


T/B TO BELOW TO INTERFACE BETWEEN MALL FIRE · GAS PIPE STUB OUT COMPLETE WITH ISOLATION VALVE NO
IFU-1 ALARM AND TENANT FIRE ALARM
H/L HIGH LEVEL PANEL
L/L LOW LEVEL INTERFACE WITH TENANT PUBLIC
IFU-2 ADDRESS & VOICE EVACUATION
IV ISOLATING VALVE SYSTEM
DRV DOUBLE REGULATING VALVE MM-1 TO MONITOR FLOW SWITCH
VCD VOLUME CONTROL DAMPER MM-2 TO MONITOR SUPERVISORY VALVE

FD FIRE DAMPER

JOB NO STAGE DATE


DEVELOPER REV DESCRIPTION DATE PROJECT
EMAAR MALLS PJSC - RETAIL DELIVERY TEAM MU0001745 LEASING JUNE 2018
TEL. NO. +9714-3675588, FAX NO. +9714-3627505
P.O. BOX 191741 DUBAI, UNITED ARAB EMIRATES
D1

D2
FIRST ISSUE

SECOND ISSUE
26/10/17

30/11/17
DUBAI HILLS MALL DRAWN CHECKED APPROVED

Lead Consultant : D3 THIRD ISSUE 14/12/17 TITLE UNIT JT EL IE


D4 FOURTH ISSUE 19/06/18
COVER PAGE FF-026 SCALE

NTS.
DRAWING NO.

ME-LOD-FF026-00
SHEET NO

1/2
REV NO

D4

Das könnte Ihnen auch gefallen