Sie sind auf Seite 1von 2

Welcome to TGMC Page 1

TGMC '09 is now open... Home | About Us | Contact Us | Site Map

Home Project Scenario Project Scenario - View Saturday, September 12 , 2009

Team Registration Ask for Software Project Scenario Feedback Search

Terms and Conditions

Change Profile Help

Tech Details
Project Scenario Detailed View
Resources Back

Project Submission
Name of the Project Feature-rich Resume Builder
Time Lines
Objective/Vision Develop an Intranet Application for Winner Technologies Ltd. for
automating the process of Resume Writing. This would be
Archives facilitating the employees to make and print their resumes in a
proper format. In addition, it will be facilitating the higher
E-Mentor management to search the employees depending upon their skills
sets and other attributes
Discussion Forum
User of the System A. End-Users(Employees)
B. System administrator.
FAQs
C. Job seekers

Prizes and Evaluation Functional Requirements i. The Users can perform the following tasks End Users and
System administrator.
ii. The system has the following Interfaces Login and Interface for
filling up the following information
iii. Interface for searching a student on various attributes
iv. Interface for searching a student on various attributes
v. Come up with the database design. The Login to the system is
database driven i.e. a user will be allowed to access the system if
and only if he is the valid user of the system
vi. Decide a format in which you want the resume to get printed
in word document

Non-Functional Requirements Secure access of confidential data (user’s details). SSL can be
used.
ii. 24 X 7 availability
iii. Better component design to get better performance at peak
time
iv. Flexible service based architecture will be highly desirable for
future extension

Optional Features a. The Users can Enter information into their Resume / Edit
Resume
b. The Users can Search for a particular employees.
c. Interface for filling up the information like Skill sets, Training
and Visa Details.

User Interface Priorities A. Professional look and feel


B. Use of AJAX atleast with all registration forms
C. Browser testing and support for IE, NN, Mozila, and Firefox.
D. Use of Graphical tool like JASPER to show strategic data to
admin
E. Reports exportable in .XLS, .PDF or any other desirable format

Reports A. Filling up the Educational Information


B. Filling up the Skill sets
C. Filling up the Visa Details

Other Important issues A. The Project Can be developed using either two tiers or three
tiers Architecture

Team Size (Maximum) 4

Technologies to be Used UML, J2EE, XML, e-Forms, AJAX, Web 2.0, Web-services, SOA

Tools to be Used • ROSE/RSA / WebSphere Modeler


• Eclipse/ RAD / Lotus Forms Designer / Portlet Factory
• WebSphere Portal/ WAS/ WAS CE / WPS
• DB2 Express – ‘C’ or DB2 UDB

https://tgmc.in/project_scenario_view.php?page=1&id=5 9/12/2009 9:17:26 AM


Welcome to TGMC Page 2

• DB2 Express – ‘C’ or DB2 UDB


• Tivoli CDP/TSM / Tivoli Directory Server
• Linux will be the preferred OS

Final Deliverable must Include A. Online or offline help to above said users, Application
deployment executive and developer
B. Application archive ( .war/.ear ) with source code
C. Database backup and DDL Script
D. Complete Source code

Documents

Home | About Us | Contact Us | Site Map | Privacy | Disclaimer

Copyright © 2009 TGMC. All rights reserved.

https://tgmc.in/project_scenario_view.php?page=1&id=5 9/12/2009 9:17:26 AM

Das könnte Ihnen auch gefallen