Sie sind auf Seite 1von 5

Title: Equipment Structure

MySAP: Transaction Documentation for XXXX


SAP Module: PM-Plant Maintenance
PROJECT Transformation

Equipment BOM Structure IH04

Purpose
You wish to display structure of particular equipment Bill of Material. You may display details of
particular equipment BOM structure by filtering fields as per requirement.

Trigger
Need to display equipment BOM structure with attachments.

Prerequisites
 Input – (Required Fields)
 Output – (Results) Equipment Structure BOM will display as per check box explosion.

Menu Path
Use the following menu path(s) to begin this transaction:
 Select LogisticsPlant Maintenance Management of Technical Objects  Bill
of Material Equipment BOM  IH04 - Structural Display to go to the Equipment
Structure: Selection Initial screen.

Transaction Code
IH04

Helpful Hints
 Press F1 for help
 Press F4 for getting input values
 R – Required
 O – Optional
 C – Conditional

  Use a variant for recurring selection of Equipment BOM

File name: Equipment Structure Version: 0 Page 1 / 4


Title: Equipment Structure
MySAP: Transaction Documentation for XXXX
SAP Module: PM-Plant Maintenance
PROJECT Transformation

Procedure

1. Start the transaction using the menu path or transaction code.

SAP Easy Access

2. Double-click to start the transaction.

3. Equipment BOM structure Selection.

Enter Schedule: Initial Screen enter information in the fields as specified in the table below:

File name: Equipment Structure Version: 0 Page 2 / 4


Title: Equipment Structure
MySAP: Transaction Documentation for XXXX
SAP Module: PM-Plant Maintenance
PROJECT Transformation

Field Name Description R/O/C User Action and Values Comments


Explosion

Equipment Equipment Number R Enter the Equipment number


Valid From First date that change is R Enter effective date. Defaults
effective to current date.
Display Level Above Number of hierarchy O Enter numeric value
levels in the structure
that are to be exploded
upwards
Display Levels Number of the hierarchy O Enter numeric value
Below levels in the structure
that are to be exploded
downwards
Expand construction Causes construction O Tick check box
types types to be displayed for
functional locations and
equipment.
BOM Explosion Structure explosion of O Tick check box
equipment / material
BOM
Explosion of IBase Indicator in the structure O Tick check box
list for equipment that
defines whether the
installed base should be
considered.

File name: Equipment Structure Version: 0 Page 2 / 4


Title: Equipment Structure
MySAP: Transaction Documentation for XXXX
SAP Module: PM-Plant Maintenance
PROJECT Transformation

Permits Structure explosion with O Tick check box


Permits

Deleted Objects If the indicator is set, O Tick check box


the system also displays
equipment, functional
locations and reference
locations with the status
Deletion Flag.
If the indicator is not set,
the system does not
display functional
locations and reference
locations with the status
Deletion Flag.
Parameters (for
BOM explosion)
Plant Key uniquely identifying O Enter plant
a Plant
BOM Application This key represents a O Select from drill down list.
process for automatic
determination of
alternatives in the
different organizational
areas within a company.
Group BOM Display group BOM in O Tick check box
an object structure
Only PM- Indicator that only O Tick Check box
assemblies assembly item that have
the Indicator PM
relevant should be
selected.
Only PM- re. items Indicator that only BOM O Tick check box
items that have the
indicator PM relevant
should be selected.
Display
As graphic Direct call hierarchy O Tick check box
graphic

4. After making your entries, select the Execute icon or F8 to continue processing.

The program can also be executed with the following choices:


 Program > Execute (F8)
 Program > Execute and print (Ctrl+P)
 Program > Execute in background (F9)

5. You have completed this transaction.

File name: Equipment Structure Version: 0 Page 2 / 4


Title: Equipment Structure
MySAP: Transaction Documentation for XXXX
SAP Module: PM-Plant Maintenance
PROJECT Transformation

 To display the actual equipment master record, select the record, and follow the
Business Process Procedure, ‘Display Equipment.

 After displaying the individual master records, leave the list with the exit icon or
the menu ‘List > exit.

6. You have completed this transaction.

Result
You have displayed the Equipment BOM Structure.

Comments
None.

File name: Equipment Structure Version: 0 Page 2 / 4

Das könnte Ihnen auch gefallen