Gravity Loads Tabulation

A. For Base Shear Computation B. For Axial Load Computation


Table 1. 3rd Level Loads for Wₓ (upper half plus lower half weights Table 5. 2nd Level Loads + Roof Lo
A B C Sub-total
DL 3,312 5,207 8,519 DL
1 1
LL 363 1,748 2,111 LL

DL 3,586 3,765 7,351 DL


1_2 1_2
LL 363 1,089 1,452 LL

DL 3,291 6,500 6,339 16,130 DL


2 2
LL 968 1,937 1,923 4,828 LL

DL 6,339 7,001 6,339 19,679 DL


3 3
LL 1,331 2,662 1,923 5,916 LL

DL 5,207 7,152 5,207 17,566 DL


4 4
LL 1,748 2,420 1,748 5,916 LL
14,837 23,965 23,092 69,245
4,410 8,471 7,342 18,771

Table 2. 2nd Level Loads Table 6. 1st Level Loads


A B C Sub-total
DL 4,199 8,777 12,976 DL
1 1
LL 726 1,452 2,178 LL

DL 4,027 4,836 8,863 DL


1_2 1_2
LL 726 2,784 3,510 LL

DL 5,141 20,134 19,890 45,165 DL


2 2
LL 1,937 3,873 2,663 8,473 LL

DL 13,221 29,058 20,350 62,629 DL


3 3
LL 2,663 5,325 2,663 10,651 LL

DL 12,396 18,125 12,396 42,917 DL


4 4
LL 2,033 4,067 2,033 8,133 LL
30,758 71,516 61,413 163,687
6,633 13,991 8,811 29,435

Table 3. 1st Level Loads Table 7. Below Ground Loads


A B C Sub-total
DL 5,754 7,125 12,879 DL
1 1
LL 726 1,452 2,178 LL
DL 5,020 8,130 13,150 DL
1_2 1_2
LL 726 1,452 LL

DL 6,188 8,619 7,855 22,662 DL


2 2
LL 1,937 3,873 2,663 8,473 LL

DL 7,855 11,749 11,762 31,366 DL


3 3
LL 2,663 5,325 2,663 10,651 LL

DL 7,421 12,879 7,421 27,721 DL


4 4
LL 1,452 2,905 1,452 5,809 LL
21,464 39,001 34,163 94,628 95
6,052 12,829 8,230 27,111

Table 4. Total Loads Table 8. Total Loads for Pₒ (whole


A B C Sub-total
DL 0 13,265 21,109 34,374 DL
1 1
LL LL

DL 12,633 16,731 0 29,364 DL


1_2 1_2
LL LL

DL 14,620 35,253 34,084 83,957 DL


2 2
LL LL

DL 27,415 47,808 38,451 113,674 DL


3 3
LL LL

DL 25,024 38,156 25,024 88,204 DL


4 4
LL LL
79,692 151,213 118,668 349,573

349,573 say = 331 kips

Weight of Footings: 1.2X 1.50 X 0.20 m 1937 lb


1.0 X 1.0 X 0.15 m 794 lb
ial Load Computation
nd Level Loads + Roof Loads
A B C Sub-total
5,021 9,668 14,689
726 1,452 2,178

4,652 6,004 10,656


726 2,784 3,510

7,245 22,341 21,270 50,856


1,937 3,873 3,994 9,804

15,967 35,542 21,729 73,238


3,994 5,325 2,663 11,982

13,324 20,545 13,324 47,193


3,781 6,488 3,781 14,050
36,536 83,449 65,991 185,976
9,712 16,412 11,890 38,014

st Level Loads
A B C Sub-total
6,697 8,632 15,329 30,018
726 1,452 2,178

6,335 7,901 14,236 24,892


726 2,178 2,904

5,194 9,209 10,269 24,672 75,528


1,937 3,873 2,663 8,473

10,269 14,268 10,967 35,504 108,742


2,663 5,325 2,663 10,651

8,632 15,147 9,330 33,109 80,302


1,452 2,905 1,452 5,809
24,095 45,321 39,198 122,850
6,052 12,829 8,230 30,015

elow Ground Loads


A B C Sub-total
1,484 1,697 3,181 33,199
726 1,452 2,178
1,256 1,256 2,512 27,404
726 726 1,452

1,200 632 2,052 3,884 79,412


1,937 3,873 2,663 8,473

1,413 632 1,413 3,458 112,200


2,663 5,325 2,663 10,651

1,065 2,336 1,065 4,466 84,768


1,452 5,325 1,452 8,229
3,678 5,084 6,227 14,989 336,983
6,052 15,249 8,230 29,531

otal Loads for Pₒ (whole floor weights)


A B C Sub-total
0 13,202 19,997 33,199
0 2,178 4,356 6,534

12,243 15,161 0 27,404


2,178 5,688 0 7,866

13,639 32,182 33,591 79,412


5,811 11,619 9,320 26,750

27,649 50,442 34,109 112,200


9,320 15,975 7,989 33,284

23,021 38,028 23,719 84,768


6,685 14,718 6,685 28,088

76,552 149,015 111,416 336,983


23,994 50,178 28,350 102,522

331 kips
1. Determination of C. R. & C. M.

1.1 C.R. computation (rigidity of the two 200 X 200 mm columns are NOT included).
RˑYR = R₁y₁ + R₂y₂ + R₃y₃ + R₄y₄
where:
R = 3EI/L^3
R = 11R
R₁ = R₃ = R₄ = R₅
Total R = 11R + 2R₂ = 11R + 2(0.2)R = 11.4R
y₁ = 0
y₂ = 2.8 m
y₃ = 5.3 m
y₄ = 8.3 m

YR = (R₁y₁ + R₂y₂ + R₃y₃ + R₄y₄ + R₅y₅)/Total R


= [3(R(0) + 3R(2.80) + 3R(5.30) + 2R(8.30)]/Total R
= 40.9R/11R
= 3.72 12.20 ft. ADOPT

YR₁ = 3.826 -3.826 m 12.55 ft.


YR₂ = 3.826 - 2.80 -1.026 m 3.37 ft.
YR₃ = 5.30 - 3.826 1.474 m 4.83 ft.
YR₄ = 6.8 - 3.826 2.974 m 9.75 ft.
YR₅ = 8.3 - 3.826 4.474 m 14.67 ft.
Note: C. R. are all the same in all levels of the building, whereas, C. M. values differs
from one level to another.

1.2 C.M. computation per level

1.2.1 At second floor

Wy = w₁y₁ + w₂y₂ + w₃y₃ + w₄y₄ + w₅y₅


Wy = 47.193(0) + 73.238(9.184) + 50.856(17.384) + 10.656(22.304) + 14.689(27.224)
y = 13.971 ft. "e₃" = -1.78 in. counterclockwise

C.R. & C.M. values & location (2nd floor level)


Y
1 2R

2 3R

C.M.
8.3 m

C.R.
6.8 m

3 3R
Y = 13.971'

5.3 m
12.20'

2.80 m
5.3 m
6.
Y = 13.97

2.80 m
4 3R X

1.2.2 At first floor

Wy = w₁y₁ + w₂y₂ + w₃y₃ + w₄y₄ + w₅y₅


Wy = 80.302(0) + 108.742(9.184) + 75.528(17.384) + 24.892(22.304) + 30.018(27.224)
y = 11.531 ft. "e₂" = 0.66 in. clockwise

C.R. & C.M. values & location (first floor level)


Y
1 2R

2 3R

8.3 m
C.R.

6.8 m
3 3R C.M.

5.3 m
Y = 11.531
12.20'

2.80 m

4 3R X

1.2.3 Below ground level

Wy = w₁y₁ + w₂y₂ + w₃y₃ + w₄y₄ + w₅y₅


Wy = (0)(9.184)+50.856(17.384)+10.656(22.304)+14.689(27.224)
y = 15.56597 ft. "e₁" = -3.37 in. clockwise

C.R. & C.M. values & location (below ground level)


Y
1 2R

2 3R

C.M.
8.3 m

C.R.
6.8 m

3 3R
Y = 15.665'

5.3 m
12.20'

2.80 m
5.3 m
6.
Y = 15.66

2.80 m
4 3R X

1.3 Eccentricities per level


"e₃" = -1.776
"e₂" = 0.664
"e₁" = -3.370
Base Shear, V

Level Weight Height Wh F, Kips


kips ft. ft. - kips Story Shear
3 66.16 28.80 1,905 22
2 158.28 18.30 2,897 80
1 116.56 7.80 909 19
Sub-Total 341.00 5,711 121

1) Design Base Shear


CvIW Cv = 0.64 Nv =0.64(1)
0.64=
V₁ =
RT I = 1.0
0.64*(1)*(341) R = 8.5
=
8.5(0.37) w = 341 kips
= 70 kips

2.5CaIW Ca = 0.44Na = 0.44(1.0)


0.44
Vmax. =
R
2.5(0.44)(1)(341)
=
8.50
= 44 kips GOVERNS

Vmin.₁ = 0.11CaIW
= 0.11(0.44)(341)
= 17

0.80ZNvIW
Vmin. ₂ =
R
0.8(0.40)(0.44)(1)(341)
=
8.50
= 6 kips

V= 44 kips
Ft = 0.07 TV
T = Ct(hn)3/4
Ct = 0.0731 for reinforced concrete moment resisting frame and eccentrically braced frames
Ct = 0.0488 for all other buildings
hn = 28.14 ft. hn = 8.58 m
T = Ct(hn)3/4 = 0.37 sec. T = Ct(hn)3/4 = 0.37 sec.

2) Vertical Distribution of Design Base Shear

Ft = 0 0 V per level
F₃ = 15 15 kips 15 kips
F₂ = 22 22 kips 37 kips
F₁ = 7 7 kips 44 kips

1
2

C. R.

3 C.M.

12.20'

11.53'
4

3) Horizontal Distribution of Design Base Shear

3.1) Roof Level, 3F, Shears V= 15 kips


3.1.1 Direct Shear + Additional Shear due to torsional irregularities
VD + V'τ
VD = 15/4 = 3.75 VD V'τ
A B C sub total
Frame 1 3.75 -0.381 1.684 1.684 3.369
Frame 2 3.75 -0.094 0.914 1.828 0.914 3.656
Frame 3 3.75 0.162 0.978 1.956 0.978 3.912
Frame 4 3.75 0.313 1.016 2.032 1.016 4.063
τmax = 4.063/3.75 ρ= 15.000 -0.001 2.908 7.500 4.592 14.999
1.083 14.999 14.999 14.999

3.2) Second Floor, 2F, Level Shears, V =37 kips


3.1.1 Direct Shear + Additional Shear due to torsional irregularities
VD + V'τ
VD = 37/4 9.25 VD V'τ
A B C sub total
Frame 1 9.25 -0.498 4.376 4.376 8.752
Frame 2 9.25 -0.258 2.248 4.496 2.248 8.992
Frame 3 9.25 0.150 2.350 4.700 2.350 9.400
Frame 4 9.25 0.606 2.464 4.928 2.464 9.856
τmax = 4.063/3.75 ρ= 37.000 0.001 7.062 18.500 11.438 37.001
1.066 37.001 37.001 37.001

3.3) First Floor, 1F, Level Shears, V =44 kips


3.1.1 Direct Shear + Additional Shear due to torsional irregularities
VD + V'τ
VD = 44/4= 11 VD V'τ
A B C sub total
Frame 1 11.00 1.385 6.193 6.193 12.385
Frame 2 11.00 0.717 2.929 5.858 2.929 11.717
Frame 3 11.00 -0.417 2.646 5.291 2.646 10.583
Frame 4 11.00 -1.687 2.328 4.656 2.328 9.313
τmax = 4.063/3.75 44.00 -0.002 7.903 21.999 14.096 43.998
ρ=
1.126 43.998 43.998 43.998

Vactual values are distributed to columns by Portal Method


3.7 Computation of shear due to torsional irregularity V'τ
For columns of the same section
RT = R₁+R₂+R₃+… Rₓ 1
Then, R = RT 2
From J = R₁y₁+R₂y₂+R₃y₃+… Rₓyₓ 3
Substituting 1 and 2 in 3
J = R(y₁ + y₂ + y₃+… yₓ)
Then, from
V(e + eacc) YR Rₓ By Portal Method, Rₓ = 2R @ frame 1
V'τ =
J 3R @ frame 2
V(e + eacc) YR Rₓ 3R @ frame 3
V'τ =
R(y₁ + y₂ + y₃+… yₓ) 3R @ frame 4
V(e + eacc) YR Rₓ
V'τ =
R (y₁ + y₂ + y₃+… yₓ)

6.1 6.1
ρ=2-
τmax √ AB 1.083(67.95)^0.5

τmax √ AB
ρ₃ = 1.083 1.317
ρ₂ = 2 6.1 1.066 8.243 1.306
ρ₁ = 1.126 1.343

3.7.1 Shear per frame, due torsional irregularity, calculation @ roof beam level

V(e + eacc) YR where;


V'τ =
J V₃ = 15 kips
15(1.776+1.361)(12.20) 3 R = 12EI/L^3
V'τ₄ =
411 11

-0.381 kips J = R₁(y₁)² + R₂(y₂)² + R₃(y₃)² + R₄(y₄)²


J= 411
15(1.776+1.361)(3.016) 3 "e₃" = 1.78 ft.
V'τ₃ =
411 11 eacc = 1.36
YR₄ = 0.000 12.200 -12.200
-0.094 kips YR₃ = 9.184 12.200 -3.016
YR₂ = 17.384 12.200 5.184
15(1.776+1.361)(5.184) 3 YR₁ = 27.224 12.200 15.024
V'τ₂ =
411 11

0.162 kips

15(1.776+1.361)(15.024) 2
V'τ₁ =
411 11
= 0.313 kips

3.7.2 Shear per frame, due torsional irregularity, calculation @ second floor level
V(e + eacc) YR R where;
V'τ =
J V₂ = 37 kips
37(0.664 + 1.361)(12.20) 3 R = 12EI/L^3
V'τ₄ =
411 11 = (3)(3500)(1728)/((9.512)(12)^3)
= 49
0.606 kips J = R₁(y₁)² + R₂(y₂)² + R₃(y₃)² + R₄(y₄)²
J= 411
37(0.664 + 1.345)(3.016) 3 "e₂" = 0.66 ft.
V'τ₃ =
411 11 eacc = 1.36
YR₄ = 12.200 0.000 12.200
0.150 kips YR₃ = 12.200 9.184 3.016
YR₂ = 12.200 17.384 -5.184
37(0.664 + 1.345)(3.016) 3 YR₁ = 12.200 27.224 -15.024
V'τ₂ =
411 11

-0.258 kips

37(0.664 + 1.345)(3.016) 2
V'τ₁ =
411 11

= -0.498 kips
3.7.3Shear per frame, due torsional irregularity, calculation first floor level V = 44V = kips

V(e + eacc) YR R where;


V'τ =
J V₂ = 37 kips
44(3.37 + 1.361)(12.20) 3 R = 12EI/L^3
V'τ₄ =
411 11 = (12)(3500)(1728)/(((5.74)(12))^3)
= 39
-1.687 kips J = R₁(y₁)² + R₂(y₂)² + R₃(y₃)² + R₄(y₄)²
J= 411
44(3.37 + 1.361)(3.016) 3 "e₁" = 3.37 ft.
V'τ₃ =
411 11 eacc = 1.36
YR₄ = 0.000 12.200 -12.200
-0.417 kips YR₃ = 9.184 12.200 -3.016
YR₂ = 17.384 12.200 5.184
44(3.37 + 1.361)(5.184) 3 YR₁ = 27.224 12.200 15.024
V'τ₂ =
411 11

0.717 kips

44(3.37 + 1.361)(15.024) 2
V'τ₁ =
411 11

= 1.385 kips
07/30/2018
11:00 a.m.
ft.
ft.
ft.
ft.
ft.
ft.
ft.
ft.

ft.
ft.
ft.
ft.
Portal Method
A. Frame # 1
1.149
8.011 8.011
3.369
8.011 A B 8.011

1.6845 1.6845
9.512
14.400
8.011 28.799 28.799
8.742 C D 8.011
20.788
20.788
4.371 4.371
9.512

19.529
20.788 39.057 39.057 20.788
12.385 E F
18.269 18.269
5.9

6.193 18.269 6.193 18.269


G 13.94 H

B. Frame #2
0.624 0.624
4.347 4.347
3.656 4.347 4.347
4.347 8.694 4.347

0.914 1.828 0.914


9.512

2.158 2.158
4.347 8.694 15.038
8.992 15.038 15.038 15.038 4.347
10.691 10.691
21.383
2.248 4.496 0.338 2.248
9.512

2.773 2.773
10.691 21.383 19.331 19.331
11.717 19.331 19.331 10.691
8.64 8.64
2.929 5.858 17.281 2.929
5.9

8.64 17.281 8.64


13.94 13.94
C. Frame #3

0.667 0.667

3.912 4.651 4.651 4.651 4.651


4.651 4.651
9.303
0.978 1.956 0.978
9.512

0.667 0.667
4.651 9.303 15.828 15.828
9.400 4.651
11.177 15.828 15.828
22.353 11.177
2.350 4.700 2.350
9.512

2.724 2.724
11.177 22.353
10.583 18.983 18.983 18.983 18.983 11.177
7.806 7.806
2.646 5.292 15.612 2.646
5.9

7.806 15.612 7.806


13.94 13.94

C. Frame #4
0.347 0.347
17.802
4.063 2.421 2.421 2.421 2.421
2.421 2.421
4.842
1.016 2.032 1.016
9.512

2.390 2.390
2.421 4.842
9.856 16.656 16.656 16.656 16.656 2.421
14.235 14.235
28.470
2.464 4.928 2.464
9.512

3.787 3.787
14.235 28.470 21.103 21.103
9.313 21.103 21.103 14.235
6.868 13.736 6.868
2.328 4.656 2.328
5.9

6.868 13.736 6.868


13.94 13.94

Das könnte Ihnen auch gefallen