Gate No 03
to 04
Labour for taking out brick flat soling and stacking as SqM 95
4 per direction.
Labour for taking out barbed wire from fencing and RM 34200
6 stacking the same as per direction.
"Brick works with first class bricks in cement sand Cum 240
(F.M. 1.2) mortar (1:4) in exterior walls including
filling the interstices with mortar, raking out joints,
cleaning and socking the bricks at least for 24 hours
before use and washing of sand, necessary
scaffolding, curing at least for 7 days etc. all
complete including cost of water, electricity and
11 other charges (measurement to given as 250 mm
width for one brick length and 375 mm for one brick
and a half brick length) accepted by the Engineer.
Taking out old plaster from wall surface including Sqm 1550
14 racking out joints, removing debris etc. complete as
per direction.
Supply and fitting fixing 25mm thick cork sheet for SqM 28
provision of RCC expansion joints including cost of
23 all materials and labour etc. as per direction.
Scrapping out and cleaning moss, old colour wash, SqM 8200
smoke marks from wall or ceiling etc. complete
26 (Measurements to be given for scrapping area only).
labour for taking out and rolling steel shutter gate SqM 18.6
35 including bit, hashkal, cutting wall etc. as per
direction.