SUMMARY OF TEST CUBE RESULT FOR KRAFT TANGAN

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result diveded by their
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
32.88 42.22 -6.11% OK PASSED
10/27/2017 Pad Footing 34.22 34.07 44.88 44.14 -7.10% OK PASSED PASSED
35.11 45.33 -0.50% OK PASSED
35.55 47.55 -0.94% OK PASSED
11/7/2017 Column Stump 37.33 36.88 48.00 48.00 -1.85% OK PASSED PASSED
37.77 48.44 -0.46% OK PASSED
S30N
22.22 37.77 -5.73% OK PASSED
11/13/2017 Ground Beam 22.66 22.44 40.00 38.89 PASSED PASSED
FAILED
Kraft Tangan Tenaga Kasa Sdn Bhd
28.88 42.22 0.00% OK PASSED
11/20/2017 Ground Floor Column 28.88 29.18 42.22 42.52 -2.09% OK PASSED PASSED
29.77 43.11 -1.04% OK PASSED
22.22 28.88 -3.03% OK PASSED
12/6/2017 Ground Floor Slab S20N 22.22 22.66 29.77 29.77 -5.98% OK PASSED PASSED
23.55 30.66 -1.47% OK PASSED
42.22 0.00% OK PASSED
11/30/2017 Roof Beam S30N 0.00 42.22 42.52 -2.09% OK PASSED PASSED
43.11 -1.04% OK PASSED
SUMMARY OF TEST CUBE RESULT FOR TANDAS AWAM

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result diveded by their
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
32.88 42.22 -6.11% OK PASSED
10/27/2017 Pad Footing 34.22 34.07 44.88 44.14 -7.10% OK PASSED PASSED
35.11 45.33 -0.50% OK PASSED
35.55 47.55 -0.94% OK PASSED
11/7/2017 Column Stump 37.33 36.88 48.00 48.00 -1.85% OK PASSED PASSED
37.77 48.44 -0.46% OK PASSED
S30N
35.55 47.55 -0.94% OK PASSED
11/7/2017 Ground Beam 37.33 36.88 48.00 48.00 -1.85% OK PASSED PASSED
37.77 48.44 -0.46% OK PASSED
Tandas Awam Tenaga Kasa Sdn Bhd
28.88 42.22 0.00% OK PASSED
11/20/2017 Ground Floor Column 28.88 29.18 42.22 42.52 -2.09% OK PASSED PASSED
29.77 43.11 -1.04% OK PASSED
17.77 26.66 -7.99% OK PASSED
12/30/2017 Ground Floor Slab S20N 17.77 18.22 28.88 28.14 -7.99% OK PASSED PASSED
19.11 28.88 0.00% OK PASSED
28.44 40.00 -3.27% OK PASSED
12/6/2017 Roof Beam S30N 29.33 29.03 41.33 41.48 -7.48% OK PASSED PASSED
29.33 43.11 -2.11% OK PASSED
SUMMARY OF TEST CUBE RESULT FOR TANDAS AWAM

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result diveded by their
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
28.88 39.11 -1.12% OK PASSED
10/5/2017 Pad Footing 12/10/20147 28.88 28.88 11/17/2017 39.55 39.70 -3.34% OK PASSED PASSED
28.88 40.44 -1.11% OK PASSED
32.88 39.55 0.00% OK PASSED
10/27/2017 Column Stump 11/3/2017 34.22 34.07 39.55 39.85 -2.23% OK PASSED PASSED
35.11 40.44 -1.11% OK PASSED
Tenaga Kasa Sdn Bhd S30N
31.11 37.77 -11.13% OK PASSED
11/11/2017 Ground Beam 11/20/2017 32.00 32.44 12/10/2017 42.22 40.74 -11.13% OK PASSED PASSED
34.22 42.22 0.00% OK PASSED
42.22 0.00% OK PASSED
11/30/2017 Ground Floor Column 0.00 12/30/2017 42.22 42.52 -2.09% OK PASSED PASSED
43.11 -1.04% OK PASSED
33.11 35.56 1.27% OK PASSED
LKIM
12/14/2017 Ground Floor Column Mersing Concrete Sdn Bhd G30J 1/12/2017 34.67 34.30 1/12/2017 35.11 35.11 2.53% OK PASSED PASSED
Complex
35.11 34.67 0.63% OK PASSED
28.88 41.33 -1.06% OK PASSED
12/11/2017 Ground Floor Slab S30N 12/18/2017 30.66 30.22 1/8/2018 41.77 41.62 -1.06% OK PASSED PASSED
31.11 41.77 0.00% OK PASSED
28.44 32.00 13.24% OK PASSED
1/9/2018 Ground Floor Slab Tenaga Kasa Sdn Bhd S30N 1/16/2018 28.44 29.33 2/6/2018 32.00 32.15 0.00% OK PASSED PASSED
31.11 32.44 -0.68% OK PASSED
28.44 40.00 -3.27% OK PASSED
12/6/2017 Roof Beam S30N 12/15/2017 29.33 29.03 1/3/2018 41.33 41.48 -7.48% OK PASSED PASSED
29.33 43.11 -2.11% OK PASSED
42.22 -1.04% OK PASSED
12/22/2017 Roof Beam Tenaga Kasa Sdn Bhd S30N 0.00 1/19/2018 42.66 42.81 -3.10% OK PASSED PASSED
43.55 -1.03% OK PASSED
SUMMARY OF TEST CUBE RESULT FOR MUSSOLA

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result diveded by their
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
33.11 35.56 1.27% OK PASSED
12/14/2017 Pad Footing Mersing Concrete Sdn Bhd G30J 12/21/2017 34.67 34.30 1/12/2018 35.11 35.11 2.53% OK PASSED PASSED
35.11 34.67 0.63% OK PASSED
28.88 38.66 -1.16% OK PASSED
12/18/2018 Column Stump 12/25/2017 29.77 29.77 39.11 39.70 -6.68% OK PASSED PASSED
30.66 41.33 -2.76% OK PASSED
25.33 35.55 -6.06% OK PASSED
12/30/2017 Ground Beam Tenaga Kasa Sdn Bhd S30N 1/6/2018 26.22 26.07 1/27/2017 37.77 37.77 -11.78% OK PASSED PASSED
26.66 40.00 -2.87% OK PASSED
Mussola
26.66 35.55 -5.28% OK PASSED
1/6/2018 Ground Floor Column 1/15/2018 28.88 28.14 2/5/2018 37.48 36.93 -6.06% OK PASSED PASSED
28.88 37.77 -0.39% OK PASSED
#DIV/0! #DIV/0! FAILED
Ground Floor Slab S20N 0.00 0.00 #DIV/0! #DIV/0! FAILED FAILED
#DIV/0! #DIV/0! FAILED
#DIV/0! #DIV/0! FAILED
1/19/2017 Roof Beam Tenaga Kasa Sdn Bhd S30N 0.00 0.00 #DIV/0! #DIV/0! FAILED FAILED
#DIV/0! #DIV/0! FAILED
SUMMARY OF TEST CUBE RESULT FOR MEDAN SELERA

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result diveded by their
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
24.88 37.33 -6.91% OK PASSED
11/23/2017 Pad Footing 11/30/2017 25.77 25.77 12/30/2017 40.00 39.38 -8.88% OK PASSED PASSED
26.66 40.80 -0.99% OK PASSED
36.00 35.56 -6.05% OK PASSED
11/28/2017 Column Stump 34.22 35.85 12/26/2017 37.78 35.85 3.84% OK PASSED PASSED
37.33 34.22 4.94% OK PASSED
S30N
28.88 38.66 -1.16% OK PASSED
12/18/2017 Ground Beam 12/25/2017 29.77 29.77 1/15/2018 39.11 39.70 -6.68% OK PASSED PASSED
30.66 41.33 -2.76% OK PASSED
25.33 35.55 -6.06% OK PASSED
12/30/2017 Ground Floor Column Medan Selera Tenaga Kasa Sdn Bhd 1/6/2018 26.22 26.07 1/27/2018 37.77 37.77 -11.78% OK PASSED PASSED
26.66 40.00 -2.87% OK PASSED
17.33 24.44 0.00% OK PASSED
1/4/2018 Ground Floor Slab S20N 1/12/2018 17.77 17.77 2/6/2018 24.44 24.44 0.00% OK PASSED PASSED
18.22 24.44 0.00% OK PASSED
17.33 25.77 -8.29% OK PASSED
1/5/2018 Ground Floor Slab S20N 1/12/2018 17.33 17.63 2/5/2018 28.00 27.26 -8.29% OK PASSED PASSED
18.22 28.00 0.00% OK PASSED
33.33 42.22 -1.04% OK PASSED
12/22/2017 Roof Beam S30N 1/12/2017 36.00 35.40 1/19/2018 42.66 42.81 -3.10% OK PASSED PASSED
36.88 43.55 -1.03% OK PASSED
SUMMARY OF TEST CUBE RESULT FOR BENGKEL NELAYAN

Concrete Required Test Result Required Result Difference between two For Compliance with Table 8A
Date Cast Structure Location Supplier Test Date Test Date result divided by their Remarks
Grade Date Test Date
7 Days (N/mm2) 28 Days (N/mm2) mean not exceed 15% Column A Column B
29.77 39.55 0.00% OK PASSED
10/10/2017 Pad Footing 10/19/2017 29.77 29.92 11/7/2017 39.55 39.70 -1.13% OK PASSED PASSED
30.22 40.00 -0.57% OK PASSED
32.88 42.22 -6.11% OK PASSED
10/27/2017 Column Stump 11/3/2017 34.22 34.07 11/17/2017 44.88 44.14 -7.10% OK PASSED PASSED
35.11 45.33 -0.50% OK PASSED
S30N
31.55 44.00 -1.00% OK PASSED
11/1/2017 Ground Beam 11/8/2017 32.44 32.74 11/30/2017 44.44 45.18 -6.83% OK PASSED PASSED
Bangkel 34.22 47.11 -2.92% OK PASSED
Tenaga Kasa Sdn Bhd
Nelayan 24.44 33.33 -1.31% OK PASSED
11/16/2017 Ground Floor Column 11/23/2017 24.44 24.74 12/15/2017 33.77 34.37 -7.70% OK PASSED PASSED
25.33 36.00 -3.20% OK PASSED
20.44 31.11 0.00% OK PASSED
11/23/2017 Ground Floor Slab S20N 11/30/2017 20.44 20.59 12/22/2017 31.11 31.11 0.00% OK PASSED PASSED
20.88 31.11 0.00% OK PASSED
36.00 5.07% OK PASSED
11/28/2017 Roof Beam S30N 0.00 34.22 35.85 -3.63% OK PASSED PASSED
37.33 -4.35% OK PASSED All 6 nos of cube
12/26/2017 tested for 28 days
35.56 -6.05% OK PASSED
37.78 35.85 3.84% OK PASSED PASSED
34.22 4.94% OK PASSED
1 32.00
2 32.00
3 32.44
4 33.33
5 33.77
6 34.22
7 34.22
8 34.22
9 34.67
10 35.11
11 35.55
12 35.55
13 35.55
14 35.56
15 35.56
16 35.56
17 36.00
18 36.00
19 37.33
20 37.33
21 37.48
22 37.77
23 37.77
24 37.77
25 37.77
26 37.77
27 37.78
28 37.78
29 38.66
30 38.66
31 39.11
32 39.11
33 39.11
34 39.55
35 39.55
36 39.55
37 39.55
38 39.55
39 40.00
40 40.00
41 40.00
42 40.00
43 40.00
44 40.00
45 40.00
46 40.44
47 40.44
48 40.80
49 41.33
50 41.33
51 41.33
52 41.33
53 41.33
54 41.77
55 41.77
56 42.22
57 42.22
58 42.22
59 42.22
60 42.22
61 42.22
62 42.22
63 42.22
64 42.22
65 42.22
66 42.22
67 42.22
68 42.22
69 42.22
70 42.22
71 42.66
72 42.66
73 43.11
74 43.11
75 43.11
76 43.11
77 43.11
78 43.11
79 43.55
80 43.55
81 44.00
82 44.44
83 44.88
84 44.88
85 44.88
86 45.33
87 45.33
88 45.33
89 47.11
90 47.55
91 47.55
92 47.55
93 48.00
94 48.00
95 48.00
96 48.44
97 48.44
98 48.44
Statistical Analysis for S30N TENAGA KASA SDN BHD

Data x X ( x-X ) ( x -X )^2


1 32.00 40.66 -8.66 75.00
2 32.00 40.66 -8.66 75.00
3 32.44 40.66 -8.22 67.57
4 33.33 40.66 -7.33 53.73
5 33.77 40.66 -6.89 47.47
6 34.22 40.66 -6.44 41.47
7 34.22 40.66 -6.44 41.47
8 34.22 40.66 -6.44 41.47
9 34.67 40.66 -5.99 35.88
10 35.11 40.66 -5.55 30.80
11 35.55 40.66 -5.11 26.11
12 35.55 40.66 -5.11 26.11
13 35.55 40.66 -5.11 26.11
14 35.56 40.66 -5.10 26.01
15 35.56 40.66 -5.10 26.01
16 35.56 40.66 -5.10 26.01
17 36.00 40.66 -4.66 21.72
18 36.00 40.66 -4.66 21.72
19 37.33 40.66 -3.33 11.09
20 37.33 40.66 -3.33 11.09
21 37.48 40.66 -3.18 10.13
22 37.77 40.66 -2.89 8.35
23 37.77 40.66 -2.89 8.35
24 37.77 40.66 -2.89 8.35
25 37.77 40.66 -2.89 8.35
26 37.77 40.66 -2.89 8.35
27 37.78 40.66 -2.88 8.29
28 37.78 40.66 -2.88 8.29
29 38.66 40.66 -2.00 4.00
30 38.66 40.66 -2.00 4.00
31 39.11 40.66 -1.55 2.40
32 39.11 40.66 -1.55 2.40
33 39.11 40.66 -1.55 2.40
34 39.55 40.66 -1.11 1.23
35 39.55 40.66 -1.11 1.23
36 39.55 40.66 -1.11 1.23
37 39.55 40.66 -1.11 1.23
38 39.55 40.66 -1.11 1.23
39 40.00 40.66 -0.66 0.44
40 40.00 40.66 -0.66 0.44
41 40.00 40.66 -0.66 0.44
42 40.00 40.66 -0.66 0.44
43 40.00 40.66 -0.66 0.44
44 40.00 40.66 -0.66 0.44
45 40.00 40.66 -0.66 0.44
46 40.44 40.66 -0.22 0.05
47 40.44 40.66 -0.22 0.05
48 40.80 40.66 0.14 0.02
49 41.33 40.66 0.67 0.45
50 41.33 40.66 0.67 0.45
51 41.33 40.66 0.67 0.45
52 41.33 40.66 0.67 0.45
53 41.33 40.66 0.67 0.45
54 41.77 40.66 1.11 1.23
55 41.77 40.66 1.11 1.23
56 42.22 40.66 1.56 2.43
57 42.22 40.66 1.56 2.43
58 42.22 40.66 1.56 2.43
59 42.22 40.66 1.56 2.43
60 42.22 40.66 1.56 2.43
61 42.22 40.66 1.56 2.43
62 42.22 40.66 1.56 2.43
63 42.22 40.66 1.56 2.43
64 42.22 40.66 1.56 2.43
65 42.22 40.66 1.56 2.43
66 42.22 40.66 1.56 2.43
67 42.22 40.66 1.56 2.43
68 42.22 40.66 1.56 2.43
69 42.22 40.66 1.56 2.43
70 42.22 40.66 1.56 2.43
71 42.66 40.66 2.00 4.00
72 42.66 40.66 2.00 4.00
73 43.11 40.66 2.45 6.00
74 43.11 40.66 2.45 6.00
75 43.11 40.66 2.45 6.00
76 43.11 40.66 2.45 6.00
77 43.11 40.66 2.45 6.00
78 43.11 40.66 2.45 6.00
79 43.55 40.66 2.89 8.35
80 43.55 40.66 2.89 8.35
81 44.00 40.66 3.34 11.16
82 44.44 40.66 3.78 14.29
83 44.88 40.66 4.22 17.81
84 44.88 40.66 4.22 17.81
85 44.88 40.66 4.22 17.81
86 45.33 40.66 4.67 21.81
87 45.33 40.66 4.67 21.81
88 45.33 40.66 4.67 21.81
89 47.11 40.66 6.45 41.60
90 47.55 40.66 6.89 47.47
91 47.55 40.66 6.89 47.47
92 47.55 40.66 6.89 47.47
93 48.00 40.66 7.34 53.88
94 48.00 40.66 7.34 53.88
95 48.00 40.66 7.34 53.88
96 48.44 40.66 7.78 60.53
97 48.44 40.66 7.78 60.53
98 48.44 40.66 7.78 60.53
3984.66 40.66 1598.31

Standard deviation method (SD SD = 4.06


(Specified Design Current
SD x 1.64 = 6.66 < 8.2 Margin when performing the
KO erlier Trial Mix)
Coefficient of variation method (V)
V = SD (100)/X = 9.98 %

f'cr = f'c /[ (1-zV)] so f'c = f'cr*( = 34.00 N/mm2

Max value = 48.44 N/mm2


Min Value = 32.00 N/mm2
Range = 16.44 N/mm2

Based on Table 3.2 for standard deviation 4.06 N/mm2, the concrete is at upper limit of "Fair"
Based on Table 3.3 for coefficient of variation of 9.98 %, the concrete is at upper limit of "Poor"

Specified Strength = 40.86 (1-1.28*0.0998 = 35.46 N/mm2 (90 % confidence)


Specified Strength = 40.86 (1-1.64*0.0998 = 34.00 N/mm3 (95 % confidence)

% of discount = ( target strength - actual average specified strength)/ Target strength


Target strength = 38.20 N/mm2
% of discount = (38.20-34.00)/38.20 = 0.1099

Total discount in RM = Cost per 1m3 x amount of concrete x % of discount


= 348 x 16 0.1099
= 6462.23
fied Design Current
n when performing the
Trial Mix)
Poor"

confidence)
confidence)

strength