Dar Al Shifa Hospital – Khalifa City – Abu Dhabi

General Risk Assessment


Testing & Commissioning of ACS & CCTV – General Risk Assessment
Task Hazard Person at Risk Risk Control RA Post Control

Task Hazard Person at Risk Risk Control RA Post Control


 Only approved ladder and
heavy machinery to be
provided.
 To work within perimeters of
 Falling from Person working at safety.
Low
height height and below  Working area to be clean and
visual inspection to be done
prior to the start of work.
 Only competent personals to be
engaged for the task.

 To work within perimeters of


safety.
 Working area to be clean and
visual inspection to be done
 Falling objects Person working below Low
prior to the start of work.
Workers  Only competent personals to be
engaged for the task.
 Ensure adequate supports.

 Defective equipment should not
 Electrocution be used.
 Only competent personals to be
 Burns engaged for the task.
 All personnel involved shall be
Person on or in vicinity inducted on the safety, health
Low
of power panel and environmental issues.
 Appropriate safety PPE when
necessary shall be provided. 
 Appropriate safety signboard
when necessary shall be
provided.

1 OF 2
Dar Al Shifa Hospital – Khalifa City – Abu Dhabi
General Risk Assessment
Testing & Commissioning of ACS & CCTV – General Risk Assessment
Task Hazard Person at Risk Risk Control RA Post Control
 Sizing of the scaffolding to be
 Scaffold Collapse properly done as per the
 Overloaded expected load.
 Vertigo while Any person on or in  To work within perimeters of
Scaffold Low
working at height vicinity of scaffold safety.
 Falling of tools /  Working area to be clean and
equipment visual inspection to be done
prior to start work.
 Aluminum ladder (2 – 3 meters)
to be used only.
 Ladder to be placed properly on
the floor with proper angle.
Any person on or in  To work within perimeters of
Ladder  Ladder slippage Low
vicinity of ladder safety.
 Working area to be clean and
visual inspection to be done
prior to the start of work.
 Ensure adequate supports.
 Only approved heavy machinery
to be provided.
 Defective /  Provide adequate support of
damaged manpower for the lifting of
machinery heavy load, signaling, and
Heavy Machinery All area Low
 Improper handling operating.
 Misuse  Deploy competent operator to
 engage for the task.
 To work within perimeters of
safety.

2 OF 2
Dar Al Shifa Hospital – Khalifa City – Abu Dhabi
General Risk Assessment
Testing & Commissioning of ACS & CCTV – General Risk Assessment
Task Hazard Person at Risk Risk Control RA Post Control

 Appropriate tools, equipment


and power extension cables to be
 Defective / used.
Usage of tools / damaged tools Any person on or in
Medium  Deploy competent personals to
equipment  Improper handling vicinity of working area engage for the task.
 Misuse  Working area to be clean and
visual inspection to be done
prior to the start of work.

3 OF 2