Beruflich Dokumente
Kultur Dokumente
SUMMARY
Senegal does not have a water supply The infrastructure project consists of the
system and local people obtain water design of a two level building for the Rio
from a surface source, but it is not always Hondo municipal market with
constant and they spend several days construction area of 508 m2, since the
without the vital liquid. For this reason existing one does not cover the needs to
arises the need of the project, will consist provide a good service to the population.
of the catchment of water from the This will also include a bus terminal that
Colorado River, conduction line of will have direct access on the CA-9 road.
approximately 8 km, storage tank of 25 This was taken as a priority because
m3 and distribution line. This project there is no area for access to loading and
seeks to supply water to the population of unloading urban transport, which is risky
Senegal for a future population of 249 for the population due to continuous
habitants and a design period of 23 stoppages on the road, which can cause
years. accidents to obstruct the visibility of
vehicles who enter and leave the
Keywords: municipal seat.
Design, training, construction plans, budget. In Senegal there is the problem of the
. supply of water causing difficulties to the
habitants by the lack of the vital liquid. It
is for this reason that the design of the
water supply system will be carried out, proposed a monthly fee so that it does not
so that the municipality can execute it and depend on the municipal budget and can
provide to the habitants. It has the be functional during the design period.
conduction line of approximately 8 km,
storage tank of 25 m3 and distribution The construction of the market in the
line. municipal seat will benefit the
municipality and mainly the local sellers,
CONCLUSIONS since they will have a suitable place
where to carry out its commercial
The projects that are the objective from activities, giving each one a specific sales
the graduation work are the result of the position; due to the importance that the
prioritization of the basic services and project entails, it is necessary to manage
infrastructure needs of the municipality of before the corresponding instances, the
Río Hondo. Due to the benefits of the financing for its construction.
projects, the municipality must execute it
as soon as possible. RECOMMENDATIONS
7. ENGINEERS CONSULTANTS OF
CENTRAL AMERICA S.A. General
specifications for construction of
roads and bridges. Guatemala,
2001. 807-6 p.